CIP2 DESIGN-BUILD PROJECT PRE-PROPOSAL CONFERENCE June 28, 2007.

Slides:



Advertisements
Similar presentations
Dr. Jim Barnett Associate Vice President of Facilities and Interim C.E.O., Business Enterprises, Inc. B.E.I. Update to B.O.T.
Advertisements

TH 13/101 Design-Build Project S.P October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
TH 55 Mill and Overlay Design-Build Project S.P
Bond Program Planning Imperatives Study Session October 12, 2004.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery
Department of Public Works Robinson Park Recreation Center Renovation – Revised Selection Process for Design Services November 4, 2013.
PUR Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
ENERGY MANAGEMENT & EFFICIENCY JOSÉ D. NUÑEZ, LEED AP VICE CHANCELLOR FACILITIES PLANNING, MAINTENANCE & OPERATIONS "Facilities Excellence" 1 “This Way.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE November 12, 2008.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
BOND PROGRAM UPDATE Building Tomorrow Today Long Beach Community College District The Long Beach Rotary Flex Day,March 28, 2007 Flex Day, March 28, 2007.
“BRIDGING” DESIGN-BUILD Residential Suites/Residential Dining Complex 694 Beds in 8 Student Suites / 2-6 Story Buildings 732-Seat Dining in 2-Story Building.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Presented to: United States Army Corps of Engineers Mobile District December 5, 2007 Ma-Chis Kawv, LLC Ma-Chis LCITE, Inc and Vanguard Contractors, LLC.
1 Peoria Unified Governing Board Presentation December 3, 2013 Presented by Dr. Heather Cruz Old Main GMP #2 Approval.
Architectural & Engineering Designer Symposium Tuesday, February 14, 2012 Student Activity Center, Salons C - E.
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
Using Design Build in Community Colleges Waterfront Hotel in Jack London Square 10 Washington Street Oakland, CA February 23, 2010.
1. Review of RFP Project Goals RFP Time Line Project Schedule RFP Type Project Budget 2. Questions? 3. Tour of New Site 4. Tour of Existing Facilities.
Board of Trustees September 1, 2010.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
North Metro Rail Line Request for Proposals (RFP) Commerce City Council August 19, 2013.
Community College League of California Annual Convention & Partner Conferences November 21, 2009 “Using Design Build”
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
Architectural, Engineering, and Professional Construction Services Consultants Request for Qualifications February 11, 2005.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Facilities Tour March 26, 2012 "Facilities Excellence"
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM Cycle 2 Conversions.
1. 2 State Regents’ Policy Workshop Thursday, July 14, :00 p.m. to 4:30 p.m. Webinar.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
USF System Campus Master Plan Update Sarasota-Manatee.
DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
ESPLOST Update Savannah-Chatham County Public Schools January 9, 2008.
Faculty Senate 2010 Incoming Freshmen John F. Carney III September 16, 2010.
Washington Street Boat Landing Pergola Restoration Design-Build Project Design-Build RFQ – Pre-Submittal Meeting Jeff Lundstrom, SDOT Project Manager February.
CM PRE-QUALIFICATION CONFERENCE – FEBRUARY 4, :30-3:00PM – JOHNSON CENTER ROOM G19 – GOLD ROOM CM Services for Construct Utilities Infrastructure.
Pinole Valley High School (PVHS) Project Status 1 Facilities Subcommittee Meeting March 15, 2016.
OC Animal Care Services Design-Build RFQ Conference October 27, 2015.
EDUCATIONAL MASTER PLAN TIMELINE Mr. Rick Miranda Acting Vice President, Academic Affairs/Asst. Superintendent Dr. Kristi Blackburn Dean of Institutional.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Southwestern Community College District Facilities Master Plan and
Overview of MSBA Building Process and Project Timeline
RFQ R Pre-proposal Conference
W.C. Overfelt High School Music, Arts, Administration & Quad
Community College League of California Annual Convention & Partner Conferences November 21, 2009 “Using Design Build”
OCIP Coverages San Mateo County Community College District
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Forsyth County 2016 Bond Referendum
Joint Parking Task Force Update Procurement & Strategic Sourcing
Valley & Third Streets Redevelopment
Enterprise Content Management Owners Representative Contract Approval
City-wide LED Street Light Conversion Program
MIRACOSTA COMMUNITY COLLEGE DISTRICT
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Strategic Budget & Planning Council Capital Improvements Plan
The Transformation of A Small Company Into A Golden Legend
PRE-PROPOSAL MEETING LOGAN WWTF
BOND SALE TIMELINE On June 23, 2009 the Board of Trustees approved the District to issue the Measure Z bonds. Approval from Riverside County received on.
Presentation transcript:

CIP2 DESIGN-BUILD PROJECT PRE-PROPOSAL CONFERENCE June 28, 2007

Project Vision Complete the renaissance of Skyline College

Timeline Contract – Div – June 20 th, 2007 Contract – Div – June 20 th, 2007 Standards – 1 st week of July Standards – 1 st week of July Bridging Document – 2 nd week of July Bridging Document – 2 nd week of July Revisions to the RFP by Addendum only Revisions to the RFP by Addendum only Proposals Due – September 28 th, 2007 Proposals Due – September 28 th, 2007 Formal Presentations – October Formal Presentations – October Board Authorization – November or December Board Authorization – November or December Contract Execution – day after Board approval Contract Execution – day after Board approval Then the fun begins!

Proposal Basics Design Build Teams Design Build Teams Hensel Phelps Construction Co. Hensel Phelps Construction Co. Hunt Construction Group, Inc. Hunt Construction Group, Inc. Sundt Construction, Inc. Sundt Construction, Inc. Confidential Meetings Confidential Meetings Up to Four Meetings (DSA and OCIP) Up to Four Meetings (DSA and OCIP) Initial Meeting – Week of July 9 th Initial Meeting – Week of July 9 th How to Schedule Subsequent Meetings? How to Schedule Subsequent Meetings? Project Website – Project Website – Links - Campus Information, Project Information, Skyline CIP2 Design-Build Project, Project Documents Links - Campus Information, Project Information, Skyline CIP2 Design-Build Project, Project Documents Source for all information from District Source for all information from District

Project Requirements Stipulated Lump Sum - $51,500,000 Stipulated Lump Sum - $51,500,000 Sitework & Landscaping – Anticipated to be in the Range of 13% to 16% of Stipulated Sum Sitework & Landscaping – Anticipated to be in the Range of 13% to 16% of Stipulated Sum Includes $1,000,000 Owner’s Allowance Includes $1,000,000 Owner’s Allowance Cost Escalation Cost Escalation District Alternates District Alternates DBE provided Risk Management/Insurance DBE provided Risk Management/Insurance Electrical Infrastructure Upgrade Electrical Infrastructure Upgrade Project Labor Agreement Project Labor Agreement Stipend Stipend

OCIP (Owner Controlled Insurance Program) Keenan & Associates Rick McHale – Vice President Rick McHale – Vice President Sharon Iburg – Vice President, Construction Services Sharon Iburg – Vice President, Construction Services

Summary of Work Multicultural Center & Admin (26,000 GSF) Multicultural Center & Admin (26,000 GSF) Wellness Center (68,700 GSF) Wellness Center (68,700 GSF) Automotive Transmission (11,500 GSF) Automotive Transmission (11,500 GSF) Boiler Plant Upgrade Boiler Plant Upgrade Sitework – Parking Lots & Roadways Sitework – Parking Lots & Roadways Landscape, Gateways, Pathways Landscape, Gateways, Pathways Building Demolition (7 structures) Building Demolition (7 structures)

Site Issues Site Issues Occupied Campus Occupied Campus... but we’re familiar with construction activity... but we’re familiar with construction activity Concurrent Construction Projects Concurrent Construction Projects Renovations of Buildings 1, 2, 5, 7, and Loma Chica Renovations of Buildings 1, 2, 5, 7, and Loma Chica New Facilities Maintenance Center New Facilities Maintenance Center Electrical Infrastructure Upgrade Electrical Infrastructure Upgrade

Evaluation Criteria Price – 20% Price – 20% Technical Expertise – 10% Technical Expertise – 10% Life Cycle Costs – 10% Life Cycle Costs – 10% Skilled Labor Force Availability – 10% Skilled Labor Force Availability – 10% Safety Record – 10% Safety Record – 10% Aesthetics & Design Innovation – 10% Aesthetics & Design Innovation – 10% Project Management Plan – 15% Project Management Plan – 15% Program Requirements – 15% Program Requirements – 15%

Question & Answer