National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate LIFE 3 rd countries:

Slides:



Advertisements
Similar presentations
Project Proposal Summary
Advertisements

Waste Monitoring and Reporting Lubomir Nondek DHV CR, Prague Czech Republic.
Facts, trends and challenges in waste management in the Republic of Macedonia M.Sc. Margareta Cvetkovska, Ministry of Environment and Physical Planning.
Part III Solid Waste Engineering
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
LIFE+ Environment project: LIFE 09 ENV/GR/ Presentation of the LIFE+ project: Strategic Planning Towards Carbon Neutrality in Tourism Accommodation.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
National Inventory System in Finland Workshop on QC and QA of GHG Inventories and the Establishment of National Inventory Systems 2-3 September 2004, Copenhagen.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
06/12/ CYPADAPT “Development of a national strategy for adaptation to climate change adverse impacts in Cyprus “ Professor Maria Loizidou National.
Existing EU Regulations concerning pesticide statistics and Latvia experience in pesticide statistics Guna Karlsone, CSB of Latvia.
Material Flow Analysis
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Ship Recycling Facility Management System IMO Guideline A.962
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 Capacity Development for Policymakers,
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.
MED 2007 – 2013 Low Cost Zero Waste Municipality The Integrated Decision Support Tool under development within Zero Waste project: the 1 st step towards.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Environmental Statistics of Jordan Department of Statistics Jordan Munther Badriyah Head of Environment Statistics Division 20-22/10/-2010 Santiago - Chili.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate Nicosia, 5 th.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
AWAST final meeting - Brussels december 2003 Aid in the management and European comparison of Municipal Solid WASte Treatment methods for a global.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
Specific aspects of EU and OECD data collection on waste Dr. Brigitte Karigl, Qatar 19 June
Workshop on waste data collection system for EIONET reprezentatives from West Balcans 4 May Zagreb, Croatia WASTE STATISTICS IN ROMANIA Author:
Newsletter – Issue Ν ο 5 (June 2008) SUSCON is a LIFE – Environment project (LIFE 05 ENV/GR/000235) aiming at the adoption and application of “sustainable.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Priority Environmental Investment Programme National Workshop Serbia Overview Of EU Waste Policy Belgrade, 8 th May 2008 Ruslan Zhechkov, REC
PAMUKKALE UNIVERSITY DENİZLİ, TURKEY Rome Meeting July 4-8, 2007.
Multi-criteria analysis and ranking of alternative waste management schemes in Morocco Friday 19 June 2009 Prof. M. Loizidou and D. Malamis s:
Methodologies and Tools for Technology Needs Assessment: an Overview Zou Ji Dept. of environmental Economics and Management, Renmin University of China.
Assessment of Technology Options 1 Naomi Radke, seecon international GmbH.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 MONITORING Mr. Jan Prášek IPPC Agency.
Life Cycle Assessment (LCA)
LIFE CYCLE ASSESSMENT (LCA). As corporations seek to improve their environmental performance they require new methods and tools. LCA is one such tool.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Directorate E: Agriculture and environment statistics; Statistical cooperation Unit E3: Environment statistics 1 ‘DIMESA 2006’ Preparation Meeting, 13.
June 2009 Regulation on pesticide statistics Pierre NADIN ESTAT E1- Farms, agro-environment and rural development
Progress Report on Quality Issues SIPUS – Strengthening of Internationalisation Policies at Universities in Serbia February 18, 2015 Belgrade, Serbia.
5 Project funded by the Euro- Mediterranean Regional Programme for Local Water Management of the European Union DEVELOPMENT OF TOOLS AND GUIDELINES FOR.
Paul Fernee - Technical Advisor Industry and Waste Tech Services National Operations Technical Services Management of Air Pollution Control Residues from.
Capacity-building from the perspective of the ECE Industrial Accidents Convention Virginia Fusé, UNECE secretariatIspra26/03/2015.
National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate Nicosia, 5 th.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Dr Costas Papastavros Environment Service
MONITORING Mr. Jan Prášek IPPC Agency.
System for waste management
EIA approval process, Management plan and Monitoring
Development of best management systems for WEEE in Cyprus
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Fotis Kourmousis Environmental Scientist, PhD candidate
General presentation of SMART GROUND project
Regional workshop on criteria and procedures for acceptance of waste at landfills Landfills in Moldova: current situation and perspectives BIRZU STELA.
Regional Workshop on e-waste
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Impacts of new Legislation on waste statistics
SMART data collection and inteGRation platform to enhance availability and accessibility of data and infOrmation in the EU territory on SecoNDary Raw Materials.
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Sustainable buildings
Data specifications for IED Annex II Module 4
Impacts of new Legislation on waste statistics
Presentation transcript:

National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate LIFE 3 rd countries: Development of best management systems for high priority waste streams in Cyprus

2 Scope - objectives Develop management systems for: End of Life Vehicles (ELVs) Comply with EU environmental legislation

3 6th environmental action program of the EU 1. Hazardous 2. Municipal 3. Industrial 4. Hospital 5. Packaging 6. Sludge 7. Waste oils 8. End of life vehicles (ELVs) 9. Construction & demolition 10. Waste from electric & electronic equipment (WEEE) “TOP 10” PRIORITY WASTE STREAMS:

4 Implementation of project 6 tasks: Analysis of characteristics of the ELVs waste stream. Presentation of the existing situation concerning its management Inventory of the quantities and generation sources – forecasting Multi-criteria decision support tool Techno-economic study Dissemination Management and reporting to EC

5 Task 1/6 Characteristics analysis & present situation actions: Description of the waste composition and characteristics Determination of the problem and environmental impacts Identification of all actors involved Determination of all the responsible competent authorities

6 Task 2/6 Inventory & forecasting actions: Development of the inventory methodology and tools Implementation of the inventory Development of an appropriate database Input of information into the developed database – Assessment of data

7 Task 3/6 Multi criteria decision support tool actions: Determination of the multi-criteria decision methodology that will be used Setting, description and calibration of the assessment criteria that will be used for the evaluation Description of the alternative scenarios – management systems that are possible for implementation Quantification of the criteria for each alternative scenario – Input of the data in the multi-criteria software tool – Screening of each alternative management system according to its applicability

8 Task 4/6 Techno-economic study actions: Full techno-economic study for the implementation of the optimum management systems for each waste stream

9 Task 5/6 Dissemination actions : Meeting of the steering committee, partners and directors Workshops Seminars and training courses Conference Website, leaflets, publications etc.

10 Task 6/6 Management and reporting to the EC actions: Determination of the beneficiary’s and partner’s key-staff and responsibilities Reporting to the EC

11 Organization and structure Management committee Beneficiary: N. Georgiades (project coordinator), K. Papastavros, Th. Messimeris Partner: M. Loizidou (scientific responsible), K.J. Haralambous, A. Papadopoulos Technical – scientific committee Steering Sub committee: ELVs

12 Steering committee: ELVs Representatives from: Environment Service – Ministry of Agriculture, Natural Resources and Environment (beneficiary) National Technical University of Athens (partner) Electromechanical Service of Cyprus Recycling Association Importers Association Cypriot Commercial and Industrial Chamber Statistic Service of Cyprus Vehicle License Authority of Cyprus Cypriot Customhouse

13 General progress Organization of project Collection of data: contacts with Statistical Service and relevant parties involved Analysis of data Trips abroad Database Workshops for raising awareness

14 Steps Development of alternative scenarios with multi-criteria analysis Techno-economic study Selection of final scenarios Dissemination of project results

15 Task 1: Analysis of the characteristics of the waste stream – Presentation and assessment of the existing situation Start/end date: – Activities: Subtask 1.1: Description of the characteristics of the waste stream – Determination of the potential environmental impacts Subtask 1.2: Recording of the current situation related to the management of the waste stream Subtask 1.3: Identification of all actors involved in the generation and management of the waste stream Subtask 1.4: Determination of all the competent authorities that are responsible for the control and monitoring of the management systems Deliverables: List of the waste streams’ characteristics, composition and potential environmental impacts ( ) List of existing management practices ( ) List of the actors and competent authorities involved ( )

16 Task 1: activities and outcome Subtask 1.1: Description of the characteristics of the waste streams – Determination of the potential environmental impacts: The characteristics and the composition of the ELVs waste stream as well as of their dangerous substances were described in detail. Also, the potential environmental impacts which are related to the generation of ELVs waste are determined and assessed

17 Task 1: activities and outcome Subtask 1.2: Recording of the current situation related to the management of the ELVs waste stream: The European and Cypriot environmental policy and legislation concerning the waste stream under examination were recorded and analyzed The procedures and practices applied in Cyprus for the management of the waste stream Complete were illustrated The effectiveness and the sustainability of the existing management schemes and systems were assessed

18 Task 1: activities and outcome Subtask 1.3: Identification of all actors involved in the generation and management of the waste stream: All the actors involved in the life cycle of the products from which the waste are generated (producers, importers, transporters and users of products) were recorded

19 Task 1: activities and outcome Subtask 1.4: Determination of all the competent authorities that are responsible for the control and monitoring of the management systems: All the competent authorities involved in the permitting, control and monitoring of the management systems and plants that will be constructed in Cyprus were recorded. Also, the effectiveness of the existing procedures that are followed by the competent authorities were evaluated. The existing situation in Cyprus concerning the generation and the procedures applied for the management of the three waste streams was assessed overall - The weak points were determined and suggestions for improving were developed.

20 Deliverables of Task 1 Report (Deliverable 1 of 1 st Progress Report) including:  Description of the characteristics of the waste stream – Determination of the potential environmental impacts Recording of the current situation related to the management of the ELVs waste stream Identification of all actors involved in the generation and management of the waste stream Determination of all the competent authorities that are responsible for the control and monitoring of the management systems

21 Task 2: Detailed inventory of the sources and quantities of ELVs waste stream – Forecasting of the future quantities that will be generated Start/end date: – Activities: Subtask 2.1: Development of the inventory methodology and tools Subtask 2.2: Implementation of the inventory Subtask 2.3: Development of an appropriate database Subtask 2.4: Input of information into the database Deliverables: Information spreadsheets ( ) Questionnaires ( ) Catalogue of sources and quantities of wastes ( ) Completed database ( ) Report with primary collected data ( ) Report with evaluated data ( )

22 Task 2: activities and outcome Subtask 2.1: Development of the inventory methodology and tools: The inventory programme (steps that must be followed for the collection of complete, representative and up-to-date data) was designed All the actors and authorities involved in the generation and management of waste stream, were recorded, individually The actors and authorities which could provide data related to the three waste streams were selected (it must be mentioned that the primary data kept by the actors and authorities does not refer to waste quantities but could be used as a basis for the extraction of quantitative data) Three informative spreadsheets were developed and distributed to the actors and authorities involved for their information about the project The collection of the primary data was supported by questionnaires that were developed and distributed to the actors and authorities involved in order to collect data kept by them that are useful for the calculation of the quantities generated in the country per waste stream (the content of each questionnaire was adapted to the type and the form of the data kept)

23 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: A. Collection and recording of primary data and information necessary for the estimation of the quantities of the waste stream An extensive inventory programme took place in order to collect all the information related to the generation of the ELVs waste stream under examination. In particular, the following analytical primary data and information were collected and recorded

24 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: End-of-Life-Vehicles: Number of new licenses per vehicle’s category, number of licensed vehicles per category, number of vehicles imported in Cyprus per category, number of vehicles per habitant, number of cancelled license vehicles and data concerning the importers of vehicles.

25 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: B. Assessment and evaluation of the primary collected data – Estimation of the quantities of ELVs, generated in Cyprus – Future projections All the primary collected data was used for the determination of the quantities of the ELVs waste stream under examination that were generated in Cyprus as well as for the estimation of the future quantities that will be generated. The calculation of the quantities generated was carried out using appropriate mathematical equations and models.

26 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: End-of-Life-Vehicles: For the calculation of the ELVs generated in Cyprus, a mathematical model that was developed by the NTUA (partner) in the framework of its participation in the Thematic Center on Waste and Material Flows of the European Environmental Agency was used. The data that was input into the model for the determination of the quantities of the waste stream under examination was: Number of vehicles that were imported to Cyprus per type and per year Number of licensed vehicles per type and year Stock of vehicles per type and year Age of vehicle per type and year

27 Number of licensed vehicles per type and year

28 Estimation of the future quantities of ELVs

29 Task 2: activities and outcome Subtask 2.3: Development of an appropriate database: An appropriate database was designed and developed for the ELVs waste stream

30 Task 2: activities and outcome Subtask 2.4: Input of information into the database: All the data collected during subtask 2.2 was insert into the database developed via subtask 2.3. Using appropriate software tools, this collected material was assessed (the assessment includes forecast for future generation of the waste streams under examination). Also, this database provides the user with the capability to demonstrate the results in graphics.

31 Deliverables of Task 2 Information spreadsheets-Questionnaires (Deliverable 1 of 1 st Progress Report Report with primary collected data - Catalogue of sources (Deliverable 1 of Interim Report) Quantities of waste stream under examination - Report with evaluated data (Deliverable 2 of Interim Report) Completed database – Deliverable of the next Progress Report (December 2005)

32 Task 3: Implementation of an appropriate multi-criteria supporting tool – Selection of management systems Start/end date: – Activities: Subtask 3.1: Determination of the multi-criteria decision methodology Subtask 3.2: Setting, description and calibration of the assessment criteria that used for the evaluation Subtask 3.3: Description of the alternative scenarios - management systems Subtask 3.4: Quantification of the criteria – Input of the data in the multi- criteria software tool – Screening of each management system according to its applicability Deliverables: Multi-criteria decision software tool ( ) List of criteria used ( ) Report with alternative management systems Ranking of alternative management systems according to their applicability Optimum management system for each waste stream

33 Task 3: activities and outcome Subtask 3.1: Determination of the multi-criteria decision methodology: Alternative multi – criteria decision methods were recorded and examined: I. Decision supporting tool based on the use of an aggregation function of groups of criteria Step 1: Determination and selection of all the individual criteria - Classification of criteria in categories of criteria (groups of criteria) Step 2: Each group of criteria are numerically weighed (factors of gravity), according to their importance (degree of importance) - The sum of the factors of gravity is 1 (100%) Step 3: Each individual criterion is numerically weighed (factor of gravity), according to its importance in each group of criteria - The sum of the factors of gravity is 1 (100%)

34 Task 3: activities and outcome Subtask 3.1: Determination of the multi-criteria decision methodology: Step 4: Development of the multi-criteria model, based on the aggregation function: F (O)= Σ Ai *Οi where: Οi : each group of criteria Αi : factor of gravity of each group of criteria Σ Ai =1 (100%), Step 5: Analysis of the characteristics of each individual criterion and quantification of their performance in a scale of 1 – 10. Step 6: Recording of the actual characteristics of each individual criterion for each alternative scenario – Rating of their actual performance according to the scale set in Step 5. Step 7: Input of the data obtained in step 6 into the multicriteria model (aggregation function) for each alternative scenario - Grading of the results for each scenario Step 8: According to the results obtained from step 7, all the alternative scenarios are ranked (the scenario with the highest score is ranked first)

35 Task 3: activities and outcome Subtask 3.1: Determination of the multi-criteria decision methodology: II. Decision supporting tools based on the determination of individual criteria and comparison of alternative scenarios per couple for each criterion Step 1: Determination and selection of all the individual criteria Step 2: Each individual criterion is numerically weighed (factor of gravity), according to its importance - The sum of the factors of gravity is 1 (100%) Step 3: Development of the multi-criteria model: Models: ELECTRE – PROMETHEE (I, II) Step 4: Analysis of the characteristics of each individual criterion and quantification of their performance in a scale of 1 – 10. Step 5: Recording of the actual characteristics of each individual criterion for each alternative scenario – Rating of their actual performance according to the scale set in Step 5. Step 6: Input of the data obtained in step 5 into the multi-criteria model for each alternative scenario – Ranking of alternative scenarios according to their suitability after comparison per couple According to their effectiveness, the most suitable multi-criteria model was selected: PROMETHEE II

36 Task 3: activities and outcome Subtask 3.2: Setting, description and calibration of the assessment criteria used for the evaluation: All the assessment criteria were set, described and calibrated (14 criteria in four groups of criteria). Table 1 presents the criteria and groups of criteria used.

37 Table 1: Individual criteria and groups of criteria Social - InstitutionalEnvironmentalEconomicalTechnical Harmonization with the legislative framework Level of potential effects to the environment – Demands on anti-pollution systems Cost of constructionPerformance Adopting of legislative priorities Air emissionsOperational and maintenance costs Existing experience - reliability Social acceptanceGeneration of wastewaterSpace demandsVersatility to local conditions Possibility of creation of new jobs Generation of solid waste – residues Flexibility Noise pollution Visual annoyance

38 Task 3: activities and outcome Subtask 3.3: Description of the alternative scenarios - management systems: All the scenarios- management systems that are possible for implementation were recorded and examined

39 Diagram: Management of ELVs

40 Task 3: activities and outcome Subtask 3.3: Description of the alternative scenarios - management systems: The management of the ELVs includes main individual steps: Disassembling – Recovery of materials for recycling/reuse Shredding Separation of shredding streams According to: the level of disassembling procedure (disassembling of parts in sequential stages: removal of liquids and their containers, battery, windows, doors, tires, engine) or complete disassembling the management practices of the materials recovered after disassembling the management practices of the materials separated after shredding (ferrous and non ferrous metals, shredding residual)

41 Task 3: activities and outcome Subtask 3.3: Description of the alternative scenarios - management systems: The following alternative schemes are examined: Scenario 1: Partial disassembling – Shredding – separation – recovery of ferrous and non ferrous metals – Landfilling of shredding residue Scenario 2: Partial disassembling – Shredding – separation – recovery of ferrous and non ferrous metals – thermal recovery of combustible shredding residue – landfilling of non combustible shredding residue Scenario 3: Partial disassembling – Shredding – separation – recovery of ferrous and non ferrous metals – thermal recovery of combustible shredding residue – utilization of non combustible shredding residue in cement industries Scenario 4: Complete disassembling – Shredding – separation – recovery of ferrous and non ferrous metals – Landfilling of shredding residue Scenario 5: Complete disassembling – Shredding – separation – recovery of ferrous and non ferrous metals – thermal recovery of combustible shredding residue – landfilling of non combustible shredding residue Scenario 6: Complete disassembling – Shredding – separation – recovery of ferrous and non ferrous metals – thermal recovery of combustible shredding residue – utilization of non combustible shredding residue in cement industries

42 Task 3: activities and outcome Subtask 3.3: Description of the alternative scenarios - management systems: The following alternative management schemes were examined: Scenario 1: Complete disassembly and forwarding of recyclable materials to the native existing market Scenario 2: Complete disassembly and forwarding of recyclable materials to the native market (after developing of the appropriate infrastructures) Scenario 3: Complete disassembly and transfer of recyclable materials abroad Scenario 4: Partial disassembly forwarding of recyclable materials to the native existing market Scenario 5: Partial disassembly and forwarding of recyclable materials to the native market (after developing of the appropriate infrastructures) Scenario 6: Partial disassembly and transfer of recyclable materials abroad

43 Task 3: activities and outcome Subtask 3.4: Quantification of the criteria – Input of the data in the multi-criteria software tool – Screening of the management system according to its applicability: All the criteria used for the evaluation of alternative scenarios for ELVs waste stream were quantified in accordance to their performance All the data that were collected and assessed in subtask 3.3, will be used by the multi-criteria software tool in order to evaluate the effectiveness of each alternative management system for ELVs waste stream.

44 Deliverables of Task 3 Multi-criteria decision software tool (Deliverable of the next Progress Report) List of criteria used (Deliverable of the next Progress Report) Report with alternative management systems (Deliverable of the next Progress Report) Ranking of alternative management systems according to their applicability (February 2006) Optimum management system for ELVs waste stream (February 2006)

45 Task 4: Carrying out of a techno-economic study for the implementation of the optimum management system of each waste stream Start/end date: – Activities: Subtask 4.1: Development of a techno-economic study for the implementation of the optimum management system of ELVs Deliverables: Full techno-economic study for the implementation of the optimum management system of ELVs ( )

46 Task 5: Dissemination Activities Start/end date: Activities: Organization of Conference Scientific publications Development and updating of the project website Preparation and distribution of printed material describing the project Organization of workshops, seminars and training courses Advertisements Preparation and distribution of leaflets Deliverables: Minutes from the meetings with stakeholders Proceedings of the final conference Proceedings of workshops Website Publications Leaflets Information material for seminars and training courses

47 Task 6: Management & Reporting to EC Start/end date: Activities: effective management of the project and fulfilment of the activities included visit of the representatives of the EC to Cyprus – Presentation of the project ( ) preparation and submission of reports to the EC Deliverables: Minutes of the meetings between the partners: Dec. 2003, Feb.2004 (3 meetings), May 2004, Nov. 2004, Feb. 2005, May 2005, Sept Progress reports (1st: 30/6/2004, 2nd: 31/12/2005) Interim technical and financial report (31/03/2005) Final technical and financial report (15/09/2006) Auditing report (31/07/2006)

48 Προς συζήτηση… Εκτιμώμενες ποσότητες παραγόμενων αποβλήτων Κριτήρια πολυκριτηριακής ανάλυσης Στάδια Συστήματος Διαχείρισης Επιλογή βέλτιστων σεναρίων διαχείρισης