National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate Nicosia, 5 th.

Similar presentations


Presentation on theme: "National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate Nicosia, 5 th."— Presentation transcript:

1 National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate Nicosia, 5 th May, 2006 LIFE 3 rd countries: Development of best management systems for high priority waste streams in Cyprus

2 2 Scope - objectives Develop management systems for: Waste from electric and electronic equipment (WEEE) Comply with EU environmental legislation

3 3 6th environmental action program of the EU 1. Hazardous 2. Municipal 3. Industrial 4. Hospital 5. Packaging 6. Sludge 7. Waste oils 8. End of life vehicles (ELVs) 9. Construction & demolition 10. Waste from electric & electronic equipment (WEEE) “TOP 10” PRIORITY WASTE STREAMS:

4 4 Implementation of project 6 tasks: Analysis of characteristics of the WEEE waste streams. Presentation of the existing situation concerning its management Inventory of the quantities and generation sources – forecasting Multi-criteria decision support tool Techno-economic study Dissemination Management and reporting to EC

5 5 Task 1/6 Characteristics analysis & present situation actions: Description of the waste composition and characteristics Determination of the problem and environmental impacts Identification of all actors involved Determination of all the responsible competent authorities

6 6 Task 2/6 Inventory & forecasting actions: Development of the inventory methodology and tools Implementation of the inventory Development of an appropriate database Input of information into the developed database – Assessment of data

7 7 Task 3/6 Multi criteria decision support tool actions: Determination of the multi-criteria decision methodology that will be used Setting, description and calibration of the assessment criteria that will be used for the evaluation Description of the alternative scenarios – management systems that are possible for implementation Quantification of the criteria for each alternative scenario – Input of the data in the multi-criteria software tool – Screening of each alternative management system according to its applicability

8 8 Task 4/6 T echno-economic study actions: Full techno-economic study for the implementation of the optimum management systems for WEEE waste stream

9 9 Task 5/6 Dissemination actions: Meeting of the steering committee, partners and directors Workshops Seminars and training courses Conference Website, leaflets, publications etc.

10 10 Task 6/6 Management and reporting to the EC actions: Determination of the beneficiary’s and partner’s key-staff and responsibilities Reporting to the EC

11 11 Organization and structure Management committee Beneficiary: N. Georgiades (project coordinator), K. Papastavros, Th. Messimeris Partner: M. Loizidou (scientific responsible), K.J. Haralambous, A. Papadopoulos Technical – scientific committee Steering Sub committee: WEEE

12 12 Steering committee: WEEE Representatives from: Environment Service – Ministry of Agriculture, Natural Resources and Environment (beneficiary) National Technical University of Athens (partner) Electromechanical Service of Cyprus Ministry of Commerce Recycling Association Importers Association Cypriot Commercial and Industrial Chamber Statistic Service of Cyprus Cypriot Customhouse

13 13 General progress Organization of project Collection of data: contacts with Statistical Service and relevant parties involved Analysis of data Trips abroad Database Workshops for raising awareness

14 14 Steps Development of alternative scenarios with multi-criteria analysis Techno-economic study Selection of final scenarios Dissemination of project results

15 15 Task 1: Analysis of the characteristics of the waste streams – Presentation and assessment of the existing situation Start/end date: 1.1.2004 – 30.4.2004 Activities: Subtask 1.1: Description of the characteristics of the waste stream – Determination of the potential environmental impacts Subtask 1.2: Recording of the current situation related to the management of the three waste streams Subtask 1.3: Identification of all actors involved in the generation and management of the waste stream Subtask 1.4: Determination of all the competent authorities that are responsible for the control and monitoring of the management systems Deliverables: List of the waste stream’ characteristics, composition and potential environmental impacts (20.3.2004) List of existing management practices (29.3.2004) List of the actors and competent authorities involved (30.4.2004)

16 16 Task 1: activities and outcome Subtask 1.1: Description of the characteristics of the waste stream – Determination of the potential environmental impacts: The characteristics and the composition of WEEE waste stream as well as of their dangerous substances were described in detail. Also, the potential environmental impacts which are related to the generation of these wastes are determined and assessed

17 17 Task 1: activities and outcome Subtask 1.2: Recording of the current situation related to the management of the WEEE waste stream: The European and Cypriot environmental policy and legislation concerning the WEEE waste stream under examination were recorded and analyzed The procedures and practices applied in Cyprus for the management of each waste stream Complete were illustrated The effectiveness and the sustainability of the existing management schemes and systems were assessed

18 18 Task 1: activities and outcome Subtask 1.3: Identification of all actors involved in the generation and management of the waste stream: All the actors involved in the life cycle of the products from which the waste are generated (producers, importers, transporters and users of products) were recorded

19 19 Task 1: activities and outcome Subtask 1.4: Determination of all the competent authorities that are responsible for the control and monitoring of the management systems: All the competent authorities involved in the permitting, control and monitoring of the management systems and plants that will be constructed in Cyprus were recorded. Also, the effectiveness of the existing procedures that are followed by the competent authorities were evaluated. The existing situation in Cyprus concerning the generation and the procedures applied for the management of the three waste streams was assessed overall - The weak points were determined and suggestions for improving were developed.

20 20 Deliverables of Task 1 Report (Deliverable 1 of 1 st Progress Report) including:  Description of the characteristics of the waste stream – Determination of the potential environmental impacts Recording of the current situation related to the management of the WEEE waste stream Identification of all actors involved in the generation and management of the waste stream Determination of all the competent authorities that are responsible for the control and monitoring of the management systems

21 21 Task 2: Detail inventory of the sources and quantities of waste stream – Forecasting of the future quantities that will be generated Start/end date: 1.1.2005 – 30.4.2005 Activities: Subtask 2.1: Development of the inventory methodology and tools Subtask 2.2: Implementation of the inventory Subtask 2.3: Development of an appropriate database Subtask 2.4: Input of information into the database Deliverables: Information spreadsheets (29.2.2004) Questionnaires (31.7.2004) Catalogue of sources and quantities of wastes (30.9.2004) Completed database (30.4.2005) Report with primary collected data (30.4.2005) Report with evaluated data (30.4.2005)

22 22 Task 2: activities and outcome Subtask 2.1: Development of the inventory methodology and tools: The inventory programme (steps that must be followed for the collection of complete, representative and up-to-date data) was designed All the actors and authorities involved in the generation and management of each waste stream, were recorded, individually The actors and authorities which could provide data related to the three waste streams were selected (it must be mentioned that the primary data kept by the actors and authorities does not refer to waste quantities but could be used as a basis for the extraction of quantitative data) Three informative spreadsheets were developed and distributed to the actors and authorities involved for their information about the project The collection of the primary data was supported by questionnaires that were developed and distributed to the actors and authorities involved in order to collect data kept by them that are useful for the calculation of the quantities generated in the country per waste stream (the content of each questionnaire was adapted to the type and the form of the data kept)

23 23 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: A. Collection and recording of primary data and information necessary for the estimation of the quantities of the waste stream An extensive inventory programme took place in order to collect all the information related to the generation of the WEEE waste stream under examination. In particular, for each one of the WEEE waste stream, the following analytical primary data and information were collected and recorded

24 24 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: Waste Electrical and Electronic Equipment: Number of items and prices of Electrical and Electronic Equipment produced in Cyprus, number of items and prices of Electrical and Electronic Equipment produced in Cyprus, total price of Electrical and Electronic Equipment selling in Cyprus, data related to the Electrical and Electronic Equipment existing in Cypriot households and data concerning the companies of importing and selling of Electrical and Electronic Equipment.

25 25 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: B. Assessment and evaluation of the primary collected data – Estimation of the quantities of WEEE generated in Cyprus – Future projections All the primary collected data was used for the determination of the quantities of the WEEE waste stream under examination that were generated in Cyprus as well as for the estimation of the future quantities that will be generated. The calculation of the quantities generated was carried out using appropriate mathematical equations and models.

26 26 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: Waste Electrical and Electronic Equipment: Seven methods, applied in European and international level, for the calculation of the quantities of the several types of WEEE, were examined and analyzed: Market supply method, Market supply Α method, Stanford method, Carnegie Mellon Method, Time step method, Estimate Method and ICER Method. For the purposes of the KYPROS project, five types of WEEE were examined and their quantities generated were calculated. In particular:

27 27 Estimation of waste refrigerators

28 28 Estimation of waste microwave ovens

29 29 Estimation of waste washing machines

30 30 Estimation of waste televisions

31 31 Estimation of waste personal computers (PCs) 0 200000 400000 600000 800000 1000000 1200000 1400000 20002001200220032004200520062007200820092010 Kg Estimate method

32 32 Estimation of the Total WEEE generation 2005-2010

33 33 Task 2: activities and outcome Subtask 2.2: Implementation of the inventory: Waste Electrical and Electronic Equipment: From the results obtained, it was concluded that the quantities of waste of PCs, microwave ovens, washing machines and TVs present increasing rate while the quantities of refrigerators remain quite constant. In addition, the quantities generated annually per type of waste and per habitant were calculated as well as the total annual quantities of the WEEE per habitant. The total quantities of waste of the five types of EEE under examination were estimated to be 5.67 Kg/habitant, for the year 2008, when Cyprus must achieve the quantitative target of recovery of 4 Kg WEEE per habitant. The results show that the country could reach this target, focusing on the recovery of the five types of WEEE examined through the project, since these types of WEEE are bulky and can be managed more easily than other types of WEEE.

34 34 Task 2: activities and outcome Subtask 2.3: Development of an appropriate database: An appropriate database was designed and developed for the WEEE waste stream

35 35 Task 2: activities and outcome Subtask 2.4: Input of information into the database: All the data collected during subtask 2.2 was insert into the database developed via subtask 2.3. Using appropriate software tools, this collected material was assessed (the assessment includes forecast for future generation of the waste streams under examination). Also, this database provides the user with the capability to demonstrate the results in graphics.

36 36 Deliverables of Task 2 Information spreadsheets-Questionnaires (Deliverable 1 of 1 st Progress Report Report with primary collected data - Catalogue of sources (Deliverable 1 of Interim Report) Quantities of WEEE waste stream under examination - Report with evaluated data (Deliverable 2 of Interim Report) Completed database – Deliverable of the next Progress Report (December 2005)

37 37 Task 3: Implementation of an appropriate multi-criteria supporting tool – Selection of management systems Start/end date: 1.3.2005 – 30.6.2005 Activities: Subtask 3.1: Determination of the multi-criteria decision methodology Subtask 3.2: Setting, description and calibration of the assessment criteria that used for the evaluation Subtask 3.3: Description of the alternative scenarios - management systems Subtask 3.4: Quantification of the criteria – Input of the data in the multi- criteria software tool – Screening of each management system according to its applicability Deliverables: Multi-criteria decision software tool (31.3.2005) List of criteria used (20.4.2005) Report with alternative management systems Ranking of alternative management systems according to their applicability Optimum management system for each waste stream

38 38 Task 3: activities and outcome Subtask 3.1: Determination of the multi-criteria decision methodology: Alternative multi – criteria decision methods were recorded and examined: I. Decision supporting tool based on the use of an aggregation function of groups of criteria Step 1: Determination and selection of all the individual criteria - Classification of criteria in categories of criteria (groups of criteria) Step 2: Each group of criteria are numerically weighed (factors of gravity), according to their importance (degree of importance) - The sum of the factors of gravity is 1 (100%) Step 3: Each individual criterion is numerically weighed (factor of gravity), according to its importance in each group of criteria - The sum of the factors of gravity is 1 (100%)

39 39 Task 3: activities and outcome Subtask 3.1: Determination of the multi-criteria decision methodology: Step 4: Development of the multi-criteria model, based on the aggregation function: F (O)= Σ Ai *Οi where: Οi : each group of criteria Αi : factor of gravity of each group of criteria Σ Ai =1 (100%), Step 5: Analysis of the characteristics of each individual criterion and quantification of their performance in a scale of 1 – 10. Step 6: Recording of the actual characteristics of each individual criterion for each alternative scenario – Rating of their actual performance according to the scale set in Step 5. Step 7: Input of the data obtained in step 6 into the multicriteria model (aggregation function) for each alternative scenario - Grading of the results for each scenario Step 8: According to the results obtained from step 7, all the alternative scenarios are ranked (the scenario with the highest score is ranked first)

40 40 Task 3: activities and outcome Subtask 3.1: Determination of the multi-criteria decision methodology: II. Decision supporting tools based on the determination of individual criteria and comparison of alternative scenarios per couple for each criterion Step 1: Determination and selection of all the individual criteria Step 2: Each individual criterion is numerically weighed (factor of gravity), according to its importance - The sum of the factors of gravity is 1 (100%) Step 3: Development of the multi-criteria model: Models: ELECTRE – PROMETHEE (I, II) Step 4: Analysis of the characteristics of each individual criterion and quantification of their performance in a scale of 1 – 10. Step 5: Recording of the actual characteristics of each individual criterion for each alternative scenario – Rating of their actual performance according to the scale set in Step 5. Step 6: Input of the data obtained in step 5 into the multi-criteria model for each alternative scenario – Ranking of alternative scenarios according to their suitability after comparison per couple According to their effectiveness, the most suitable multi-criteria model was selected: PROMETHEE II

41 41 Task 3: activities and outcome Subtask 3.2: Setting, description and calibration of the assessment criteria used for the evaluation: All the assessment criteria were set, described and calibrated (14 criteria in four groups of criteria). Table 1 presents the criteria and groups of criteria used.

42 42 Table 1: Individual criteria and groups of criteria Social - InstitutionalEnvironmentalEconomicalTechnical Harmonization with the legislative framework Level of potential effects to the environment – Demands on anti-pollution systems Cost of constructionPerformance Adopting of legislative priorities Air emissionsOperational and maintenance costs Existing experience - reliability Social acceptanceGeneration of wastewaterSpace demandsVersatility to local conditions Possibility of creation of new jobs Generation of solid waste – residues Flexibility Noise pollution Visual annoyance

43 43 Task 3: activities and outcome Subtask 3.3: Description of the alternative scenarios - management systems: All the scenarios- management systems that are possible for implementation were recorded and examined

44 44 Life – Cycle of Electrical and Electronic Equipment (EEE)

45 45 Flow diagram for the management of WEEE

46 46 Typical composition of WEEE scrap

47 47 Task 3: activities and outcome Subtask 3.3: Description of the alternative scenarios - management systems: The following alternative management schemes were examined: Scenario 1: Complete disassembly and forwarding of recyclable materials to the native existing market Scenario 2: Complete disassembly and forwarding of recyclable materials to the native market (after developing of the appropriate infrastructures) Scenario 3: Complete disassembly and transfer of recyclable materials abroad Scenario 4: Partial disassembly forwarding of recyclable materials to the native existing market Scenario 5: Partial disassembly and forwarding of recyclable materials to the native market (after developing of the appropriate infrastructures) Scenario 6: Partial disassembly and transfer of recyclable materials abroad

48 48 Flow chart of TV disassembly

49 49 Flow chart of PC disassembly

50 50 Task 3: activities and outcome Subtask 3.3: Description of the alternative scenarios - management systems: Methods of chopping of WEEE I. Treating of bulky domestic WEEE (refrigerators, washing machines etc.) in chopping systems used for ELVs: Disassembly and removal of parts that contain PCBs is necessary before chopping Low cost Recovery of materials: Up to 75% Production of high amount of residues that are transferred to landfill II. Treating of bulky domestic WEEE (refrigerators, washing machines etc.) in appropriately designed chopping systems: Disassembly and removal of parts that contain PCBs, plastics, electric motors etc. is necessary before chopping Higher cost Recovery of materials: Up to 90%

51 51 Task 3: activities and outcome Subtask 3.3: Description of the alternative scenarios - management systems: Disassembly of WEEE: Partial disassembly of WEEE The procedure focuses on the disassembly of bulky parts of the WEEE (according to their weight and volume) and parts that are dismantled easily. It could be applied manually or/and automatically Complete disassembly of WEEE Additionally to the parts that are dismantled in the partial disassembly, other parts are removed such as printed circuit boards, cables, sensors, resistances, batteries etc. In both, partial and complete disassembly procedures, it is necessary to remove all the parts that contain hazardous substances before disassembling, such as: Printed circuit boards (PCB) Cathode ray tubes (CRT) Batteries etc. The hazardous substances that are included in thee parts are: Heavy metals: Mercury, lead, Cadmium, Chromium, CFCs, PCBs PVC BFRs asbestos

52 52 Task 3: activities and outcome Subtask 3.4: Quantification of the criteria – Input of the data in the multi-criteria software tool – Screening of each management system according to its applicability: All the criteria used for the evaluation of alternative scenarios for WEEE waste stream were quantified in accordance to their performance All the data that were collected and assessed in subtask 3.3, will be used by the multi-criteria software tool in order to evaluate the effectiveness of each alternative management system for each waste stream.

53 53 Deliverables of Task 3 Multi-criteria decision software tool (Deliverable of the next Progress Report) List of criteria used (Deliverable of the next Progress Report) Report with alternative management systems (Deliverable of the next Progress Report) Ranking of alternative management systems according to their applicability (February 2006) Optimum management system for each waste stream (February 2006)

54 54 Task 4: Carrying out of a techno-economic study for the implementation of the optimum management system of WEEE waste stream Start/end date:01.07.2005 – 30.06.2006 Activities: Subtask 4.3: Development of a techno-economic study for the implementation of the optimum management system of WEEE Deliverables: Full techno-economic study for the implementation of the optimum management system of WEEE (30.6.2006)

55 55 Task 5: Dissemination Activities Start/end date: 01.01.2004 - 30.06.2006 Activities: Organization of Conference Scientific publications Development and updating of the project website Preparation and distribution of printed material describing the project Organization of workshops, seminars and training courses Advertisements Preparation and distribution of leaflets Deliverables: Minutes from the meetings with stakeholders Proceedings of the final conference Proceedings of workshops Website Publications Leaflets Information material for seminars and training courses

56 56 Task 6: Management & Reporting to EC Start/end date: 01.01.2004- 30.06.2006 Activities: effective management of the project and fulfilment of the activities included visit of the representatives of the EC to Cyprus – Presentation of the project (11.2.2004) preparation and submission of reports to the EC Deliverables: Minutes of the meetings between the partners: Dec. 2003, Feb.2004 (3 meetings), May 2004, Nov. 2004, Feb. 2005, May 2005, Sept. 2005 Progress reports (1st: 30/6/2004, 2nd: 31/12/2005) Interim technical and financial report (31/03/2005) Final technical and financial report (15/09/2006) Auditing report (31/07/2006)

57 57 Προς συζήτηση… Εκτιμώμενες ποσότητες παραγόμενων αποβλήτων Κριτήρια πολυκριτηριακής ανάλυσης Στάδια Συστήματος Διαχείρισης Επιλογή βέλτιστων σεναρίων διαχείρισης