AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
Bart Hommels for the DIF WG Electronics/DAQ for EUDET, DESY DIF status AHCAL, DHCAL, ECAL DIF prototypes Ongoing developments & plans.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
14.4. Readout systems for innovative calorimeters
DIF – LDA Command Interface
LED notched fibre system short HBU0 party with QMB6
Status of HBU, EBU and SM_HBU
AHCAL Detector Interface electronics
CALICE meeting 2007 – Prague
Status of the DHCAL DIF Detector InterFace Board
HCAL task status report
Testbeam Timing Issues.
10/month is the present production rate 2 FTE + sporadic contributions
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
CALICE/EUDET Electronics in 2007
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
First thoughts on DIF functionality
Scintillator HCal Prototype
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009

Mathias Reinecke | CALICE Days | | Page 2 Outline > Status of (open) Developments  CALIB, POWER, Flexleads  Scintillating-Tiles and HBU0  DIF + mechanical setup + Labview > Commissioning Plans / Redesigns  HBU and DIF redesigns  Labview (USB) / ‘final’ DAQ > Conclusions and Outlook

Mathias Reinecke | CALICE Days | | Page 3 CALIB and POWER modules > 4 Modules finished. > First tests successful. CALIB module: 11 x 10 cm² > Layout ongoing. > Expected end April. POWER module: 12.5 x 11 cm² CALIB: M. Zeribi, POWER: H. Wentzlaff

Mathias Reinecke | CALICE Days | | Page 4 Flexleads (SIGNAL and POWER) Flexleads finished: 20 pieces of each type. ~22mm Flexlead Pre-Bending: Bending Adapter: K.-H. Gooßen

Mathias Reinecke | CALICE Days | | Page 5 Tiles > 153 prototype tiles arrived at DESY (144 needed for a HBU0). > Assembly procedure Tiles-HBU (alignment pins) works at least for one tile. > 20% of the SiPMs show ‘long tail’ response (under investigation). Tiles: ITEP, SiPMs: CPTA

Mathias Reinecke | CALICE Days | | Page 6 HBU0 > 3 Boards from 2 suppliers arrived at DESY. > In assembly right now! Cutout in PCB (~300µm)

Mathias Reinecke | CALICE Days | | Page 7 HBU0 HBU0 Cross Section: Concept and Reality: Artificial cutout Not in scale!!

Mathias Reinecke | CALICE Days | | Page 8 Mechanical setup (Prototype) CALIB Flexlead DIF (FPGA) Tile Cassette Bottom Plate (fixation nose) Setup Support Place for HBU0 (12x12 tiles) Two prototype cassettes realized (top plate not shown). Bolt (cassette construct.)

Mathias Reinecke | CALICE Days | | Page 9 LED Light Calibration Systems (2 concepts) ‘Notched’ Fiber-Based: QRLD6x board (ASCR Prague): ‘Integrated’ LED Based (Uni Wuppertal) Fibers Uniformity, Dynamic Range, Crosstalk UV LED ‘0603’

Mathias Reinecke | CALICE Days | | Page 10 DIF DIF Firmware (preliminary): > Top Level FSM done. > Interface to Labview done. > First sequences to ASICs done. Missing (next steps): > Interface to Calibration System > Automatic Sequencing (e.g. for measurements) > Tests with the actual HBU! Development in close coordination within the DIF task force (quite a lot communication / discussion). DIF firmware: F. Krivan (AHCAL)

Mathias Reinecke | CALICE Days | | Page 11 Labview Control of the Prototype System AHCAL: Focus on: > USB Interface > Slow-Control > Take Data > Readout > First CALIB commands 4 of 6 tabs filled

Mathias Reinecke | CALICE Days | | Page 12 Labview: Slow Control Data Generation / Status > Slow control data (703 bits):  generated by Labview  stored ASIC-wise in ASCII file (8-bits per line). Readback from file possible. > Labview Control software:  takes data from file (+transfer to ASICs). > Solution for CALICE DAQ:  Files for ASICs / Slabs / Layers? But: Files! Status Labview Control software: Connection Labview => USB => DIF (in- and output) established. Basic operations ready, following DIF task force command list, vers Main work: complex DIF firmware (Frantisek Krivan).

Mathias Reinecke | CALICE Days | | Page 13 Commissioning of the Prototype System > Timeline is challenging. First steps (SPIROC1):  Connect everything together and look for smoke.  Try basic accesses to the ASICs (SPIROCs) and look with scope. > Highest priority is the operation of the ASICs:  Write slow-control data  Measure / Readout  Signal degradation on the long lines. > Operate Calibration System / Power module Status: Huge Stack of ‘untested’ hard- and soft-, and firmware.

Mathias Reinecke | CALICE Days | | Page 14 Commissioning of the Prototype System How to explain our Status? Well, … XFEL construction site at DESY

Mathias Reinecke | CALICE Days | | Page 15 Redesigns for the EUDET module > Redesign Preconditions :  SPIROC Pinout and Tile Dimensions (needed beginning June 09)  Experiences from prototype (needed mid May 2009)  Only digital-part tests foreseen up to now. > Prototype tests must go on in parallel to redesigns:  DESY FE needs support for the tests (manpower for redesigns needed).  First real system tests with CALICE DAQ, LCS tests, SPIROC2!  What are the most necessary tests? > Mechanical Cassette (EUDET module) => concept pending! Minimum redesign effort: HBU, (DIF), ((POWER))

Mathias Reinecke | CALICE Days | | Page 16 Conclusions and Outlook > Timeline is challenging. > No further delays in module production have to be expected.  HBU0 Development  HBU delays for DIF and CALIB commissioning > Tests have already started, we proceed in step-by-step mode. A lot of work ahead, but as soon as our prototype system is running, we have a really impressive system !!