The case of Ancona Piero Remitti, City of Ancona Thessaloniki, Greece 22 September 2005
01 IONAS Thessaloniki, 22 September no integration 2. town planning integration 3. city management integration 4. environmental management 5. sustainability planning and management integration different steps in the relationship between the city and the port
02 a. tourist port craft sites b. commercial port c. docks and shipyards Some basic data: 1. freights: tons in ‘04, -5% to ‘03, and - 23,5 % from ‘02 to ‘03, after an increasing period (from ‘96 to ‘01) 2. passengers: in 2004, - 5% to ‘03 leader port in Adriatic sea for passengers IONAS Thessaloniki, 22 September The Port of Ancona
03 water - only analysis on the existing situation. Actually not all waste waters are collected, but this is foreseen for the next years. Some emergencies are given by the Conocchio stream (collecting the purification plant of the city) and the ancient system of discharges in the historical ports, actually not fully known. Total consumption of the port area for the year 2004 is mc. IONAS Thessaloniki, 22 September Elements of environmental management
04 wastes - a Plan for the wastes management has been approved in 2005.The targets are: a.to provide a complete service to ships, including the whole cycle of management for every kind of wastes b.to realize a service easy, effective and financially efficient, by means of an unique private operator c.to assume the targets for separated collection given by the Province Plan d.to control and monitor the quality standard of the service The Plan includes a detailed analysis of the actual situation IONAS Thessaloniki, 22 September Elements of environmental management
05 air quality - only analysis on the existing situation, given by stable and mobile monitoring stations. Problems given by dusts (PM10). noise - high levels of noise pressure (up to 74 dBA), tested by means of specific analysis, are not always respecting the limits given by the Noise Plan elaborated by the Municipality. IONAS Thessaloniki, 22 September Elements of environmental management
06 polluted sites and pollution sources - two polluted sites (ex gasoline providers) and two environmentally risky companies (oil production and carbon collection) are present in the port area. Plans for the reclamation of the former ones and the safety of the latter ones are foreseen. energy - only partial analysis IONAS Thessaloniki, 22 September Elements of environmental management