An agency of the European Union EudraCt – Results Webinar # 1 Presented by Tim Buxton on 20 January 2016 IT Service Strategy Manager, IT Operations.

Slides:



Advertisements
Similar presentations
Tips to a Successful Monitoring Visit
Advertisements

SERVICE MANAGER 9.2 PROBLEM MANAGEMENT TRAINING JUNE 2011.
Broker Portal ECF Enhancements Screen Navigation Walkthrough Please progress through the walkthrough by clicking your mouse button following each informational.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
E-Portfolio July2014 Managing Multi-source Feedback.
Issue Identification, Tracking, Escalation, and Resolution.
1 Vendor Reverse Auction - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines.
1 Vendor ITB - Sourcing User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
How To Use NCA’s Online Grant Application System
An agency of the European Union Training session for Stakeholders Clinical Trial Results in EudraCT V10 Presented by: Noemi Manent Compliance and Inspection.
Page 1 of 16 The Work in Progress screen is accessed from the ETS main menu. The screen will be displayed when a user clicks on the ‘Work in Progress’
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
Employment and Training Administration DEPARTMENT OF LABOR ETA Reporting and Data Validation Updates Presenters: Wes Day Barbara Strother Greg Wilson ETA’s.
Unlocking the Mystery of General Information Reporting Research Compliance Administration Training Presentation Wednesday, June 6, 2007 Presenter:Heather.
TNKids Duplicate Social Security Number. The following graphics are designed to help you to navigate through this Computer Based Training. The navigational.
An agency of the European Union Get started with EudraCT to prepare and post results Noémie Manent Compliance and Inspection.
An agency of the European Union Managing users and prepare results in EudraCT Noémie Manent Compliance and Inspection.
Partner Network Portal Anna Jones :: July 2006 Partner Training Webinar Communications Sector.
Gasoline and Diesel Event User Guide. Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
ACRIN 6698 Diffusion-weighted MRI Biomarkers for Assessment of Breast Cancer Response to Neoadjuvant Treatment: An I-SPY 2 Trial Substudy Presented by:
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
June 18, Agenda Welcome Updates and Reminders New CT.gov Site eGovernment Applications Questions & Comments.
CSA Release 2 CYBER Training. Training Purpose Review the new functionality in CYBER that will assist in the submission and review of Treatment Plans.
September 10, Agenda Welcome Updates Reminders New CT.gov Site Questions & Comments.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
MODULE I Close-Out Visit/Monitoring Reports Jane Fendl April 24, Versions: Final 24-Apr-2010.
Honors Level Course Implementation Webinar Honors Rubric and Portfolio Review Process October 7, 2013.
Library Services CDRS Requirements Report February 9, 2001.
1 ARRA Recipient Reporting FederalReporting.gov Briefing In-Bound Recipient Reporting April Reporting Cycle Enhancements March 29, 2010.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Cindy Collins ETEC 665 Electronic Submissions Submitting Proposals Through Grants.Gov.
TimeTrex Electronic Signature Process. Welcome to the new totally electronic TimeTrex System The purpose of this presentation is to explain how the electronic.
An agency of the European Union Get started with EudraCT to prepare and post results Noémie Manent Compliance and Inspection.
Slide #1 Computerised Transit Computer System Training Session Trader Application Users.
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
Statewide Financial System Program 1 Commitment Control (KK): Refresher Training Key Points Commitment Control (KK): Refresher Training Key Points Welcome.
Board Member Management System (BMMS) October, 2015.
The Basics Craig Johnson Grant Administrator Department of Medicine Instructor.
NIMAC for Publishers & Vendors: Using the Excel to OPF Feature & Manually Uploading Files December 2015.
Page 1 MASS RECLASS REQUISITIONS TO CHANGE ACCOUNTING Instructions on how to create the requisition to change the ACCS on awards affected by the MASS RECLASS.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
1 NJ Dept. of Health Decision Tree for eIRB Submission Revised: 01/25/2016 Is this research defined as: A systematic investigation which includes research.
NEW GRANTS MANAGEMENT ENTERPRISE (GME) Common Issues and Processes.
January Interface Monthly Meeting Sunflower Project Statewide Management, Accounting, and Reporting Tool Update January 12, 2010.
1 ARRA Recipient Reporting FederalReporting.gov Briefing In-Bound Recipient Reporting April Reporting Cycle Enhancements March 30, 2010.
MS Invoice E-Invoice Solution Overview March 2016.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
SDA Formulas Online Webinar Please use the mute button or press #6 on your phones to mute the teleconference line If you have questions or technical problems.
SDA Formulas Online webinar Tomika Moore Senior Chemist, Nonbeverage Products Laboratory September 13, 2012.
Wisconsin Department of Public Instruction Getting Started with the INDIVIDUAL STUDENT ENROLLMENT SYSTEM Segment 1 (revised July 1, 2006)
Complying with HEFCE open access requirement for eligibility to REF2021 submission How to create a record in Pure and upload your ‘Author’s Accepted Manuscript’
An Educational Computer Based Training Program CBTCBT.
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
19 October 2017 Overview The Management Board, at its December 2015 meeting, has endorsed the timeframe for the implementation of the EU clinical trial.
Make-Up Testing/Undo Student Test Submissions
What’s Changing in Research Administration?
EudraCT V10 and the clinical trial regulation
With rosa sanchez pdr coordinator
Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. Event number: Event password: 2015B13 To hear the presentation.
Overview of the FEPAC Accreditation Process
Reliance Supplier Corrective Action Process
Change Management Team
SUNY Pre Award and Compliance Systems Institutional Review Board (IRB)
Texas Student Data System
Discipline Incidents Collection
Expedited Status Update January 14, 2019
Supplier Webinar: IBM PCD Data Collection Process Changes & New Version of IBM’s Product Content Declaration(PCD) Form February 21 and 26, 2019 This.
Presentation transcript:

An agency of the European Union EudraCt – Results Webinar # 1 Presented by Tim Buxton on 20 January 2016 IT Service Strategy Manager, IT Operations

Instructions for sponsors Frequently asked questions 1

Timeline Q1Q2Q3Q4 13 January 2016  Date from which EudraCT - Results system is available  Posting and publication process operational 13 March 2016  Results sets falling due after this date (except those for trials categorised as to be posted ≤ 24 months after finalisation of the programming) should comply with the modalities and timing of trial results 13 July 2016  Date by which results sets affected by the system closure are to have been posted. 21 December 2016  Deadline for submission of summary results for trials categorised as to be posted ≤ 24 months after finalisation of the programming (see document “Trial results: modalities and timing of posting” published on the EudraCT website)Trial results: modalities and timing of posting 2

Activities necessary to return to normal operation Review by sponsors of trial results sets within the system leading to: Correction where needed by the sponsor Authorisation to EMA to restore results sets to public view where no correction is needed Submission of data Affected results sets Results for trials categorised as to be posted ≤ 24 months after finalisation of the programming 3

Affected results sets Results sets that were posted, published and removed from public view as of 31 July 2015 Results sets that had been posted but not yet published as of 31 July 2015 Results sets that fell due in the period that the system was closed (31 July 2015 to 12 January 2016) Results sets that fall due in the two months following re- opening of the system (13 January 2016 to 13 March 2016) 4

Resources: Schedule of trials assigned to a primary user 5

Resources: Release notes for version Summary of release Major items fixed in release Known issue in release Full release contents – Issues fixed Known errors New Validation Violation Messages (for XML upload) in EudraCT - Results Additional information Installation steps deviating from the deployment guide 6

Trials potentially affected by timestamp issues 7

Trials potentially affected by category issues 8

Trials where an automated process has been run to eliminate duplicated non-completion or joining reasons 9

Restore status and return to public view process Notifications Sponsor notification to EMA: Finalized results set in the system is correct EMA notification to sponsor: Status of finalized results set is restored Published messages: Messages removed: “Removed from public view” “These results have been removed from public view whilst they are reviewed and may need to be corrected before being returned to public view” 10

Tagging of superseded versions of results sets that included affected data Notifications Sponsor notification to EMA: New version of finalized results set containing corrected data EMA notification to sponsor: Superseded versions tagged Published messages Messages removed: “Removed from public view” “These results have been removed from public view whilst they are reviewed and may need to be corrected before being returned to public view” New message: “Due to a system error, the data reported in this version is not correct and has been removed from public view” 11

Tagging of results sets submitted in compliance with revised timelines Notifications Sponsor notification to EMA: Results set submitted in compliance with revised timelines EMA notification to sponsor: Results set submitted in compliance with revised timelines tagged Published message New message: “Due to the EudraCT – Results system being out of service between 31 July 2015 and 12 January 2016, these results have been published in compliance with revised timelines” 12

Instructions for sponsors Frequently asked questions 13

EudraCt Training – Training environment System and data availability [EMA] does not guarantee the availability of the training application. The system may be refreshed from time to time and this may cause the loss of data saved into the application as well as loss of user log in credentials. Any trials data prepared in the EudraCT training environment are for training purposes only. Status Most credentials still valid Previously available data no longer available Self-registration and trial assignment available 14

Draft trials - message All trials in the system as of 31 July 2015 which had been assigned for results tagged with the message: “These results have been removed from public view whilst they are reviewed and may need to be corrected before being returned to public view” Not appropriate for trial results that had not been posted as of 31 July 2015 Removed from all draft trial results to which attached as of 31 July

Primary user EMA assigns each clinical trial to a primary user for result related information On request of an individual acting on behalf of the sponsor, the addressee of the decision on a paediatric investigation plan or the marketing authorisation holder This assignment enables the user to assign one backup user and multiple delegated results preparers and posters for each listed trial The primary user is expected to manage the backup user and delegated preparers, and the transition between primary users on change of personnel or assignment at the sponsor 16

Issue resolution The release notes list the issues resolved in release A number of service desk tickets remain open. These will be closed gradually as part of the return to normal operation 17

Outcome of the automated duplicate reason fix 1.Is it possible to download XML from a finalised Results set? Yes. XML of the current version, including finalized results, can be downloaded at any time 2.Are records affected by the automated duplicate reason fix tagged? No. A detailed listing has been supplied to all primary users whose trial results sets have been subject to the automated duplicate reasons fix 3.Is there a norm for this category? All trial results sets in which the duplicate reason was identified have been corrected, and the status (whether draft or finalized) left unchanged 18

Communications For the formal notifications outlined in the Instructions for sponsors; and The acknowledgement of the with the Instructions for sponsors; Use: For all other queries related to EudraCT – Results and this exercise, please use: 19