MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.

Slides:



Advertisements
Similar presentations
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Advertisements

GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
ITAR Restricted Data THEMIS Probe and PCA Overview Mission CDR 6/14 – 6/18/04 Integration and Test Marc Kaylor
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
MPSRAlignments - 1 UCB, Oct 26, 2006 THEMIS PROBE MISSION PRE-SHIP REVIEW Alignments Paul Turin LME University of California - Berkeley.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
ELENA installation progress F. Butin / ELENA collaboration.
GLAST Large Area Telescope:
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
MISSION PRE-ENVIRONMENTAL REVIEW
Gayle K. Martin November 14, 2016
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
FIELDS SCM Thermal iPER
0.0 Instrument Suite Name Presenter’s name
THEMIS MISSION PRE-SHIP REVIEW
University of California, Berkeley
GLAST Large Area Telescope:
Undulator System Installation
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
Mechanical/Thermal Systems
GLAST Large Area Telescope
Introduction and Overview
Presentation transcript:

MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University of California - Berkeley

MPEREnvironmental Test OverviewUCB, June 23, 2006 Summary of Pathfinder Test New Elements in Upcoming Tests Test Flow Transportation Schedule Activity and Staff Schedule Command and Telemetry Electrical Ground Support Equipment PRESENTATION TOPICS

MPEREnvironmental Test OverviewUCB, June 23, 2006 DATEACTIVITYCOMMENT Mar 20-21Arrive at JPL, offload and set up. Mar 22Magnetics Test with readings of probe taken in and out of helmholtz coil, with power on and power off. Data shows Themis is well within its specification requirements of 5nT at 2.5 meters from center. Mar 27-30Vibration Tests – 3 axes,Sine, Random.Test terminated at 3dB below planned level due to concern about overtest. Otherwise all normal. Report written by James Strain of Swales compares results with model predicts along with data plots. Mar 31Shock/Separation TestCompleted without anomaly. Apr 4-6EMC/EMI TestsPASS on all tests. Apr 13-16Thermal BalanceResults correlate with predicts, generally within a few degrees. April 17-21Thermal VacuumFour cycles. Instruments and spacecraft components perform within specs. Apr 24Move to Mag Facility, final Mag TestTesting confirmed that Themis components had not permed up as a result of vibration or other tests. Apr 25Depart JPL. Transportation back to SSL. Pathfinder Environmental Test F2 Environmental Test: Magnetics, Vibration, Thermal Balance, Thermal Vac, EMC/EMI. Passed all tests. No significant issues.

MPEREnvironmental Test OverviewUCB, June 23, 2006 NEW ELEMENTS OF UPCOMING TESTS Vibration with Probe Carrier Assembly Acoustics with Probe Carrier Assembly Thermal Vacuum with Two Spacecraft in Chamber Spin Balance with GSFC Miller Table

MPEREnvironmental Test OverviewUCB, June 23, 2006 Test Flow All Probes F1 – F5

MPEREnvironmental Test OverviewUCB, June 23, 2006 Test Flow (cont.) Parallel Paths: F1/F5 – F3/F4 – F2 Stagger sequence of Align, Spin Bal and DC magnetics as needed.

MPEREnvironmental Test OverviewUCB, June 23, 2006 Transportation Schedule Probe Carrier is already at JPL Shipment with 3 satellites to arrive at JPL on June 29 Shipment with 2 satellites to arrive at JPL on July 5 Transportation Plans Air Ride, lift gate Monitoring: Temp and RH, Vibration Pilot car Offloading and Movement at JPL by forklift Transportation

MPEREnvironmental Test OverviewUCB, June 23, 2006 Materials Organization Hardware Organization and Coordination EGSE Racks clearly labelled – 4 pairs of Umb/BB; 2 RF. Each satellite (F1 – F5) has associated rolling wire rack containing the red/green tag items, blankets, RF hat, etc. One wire shelf rack for each satellite. Minimize or eliminate risk of incorrect placement. Tools, harnesses, etc which are shared between satellites are on other wire shelf racks. One rack for clean room supplies; one rack for items used in clean room; one rack for other tools, etc..

MPEREnvironmental Test OverviewUCB, June 23, 2006 Activity and Staff Schedule Probe Activities Designated Staff Scheduling Activities of PCA and each Probe are scheduled by date with required staff identified. Daily communication between UCB and JPL.

MPEREnvironmental Test OverviewUCB, June 23, 2006 Data Paths: 1. Probe ITOS 2. Engr and Sci Data at JPL 3. ITOS relays telem to UCB 4. Engr Data at UCB 5. Sci Data at UCB Command / Telemetry Data at JPL is seen and archived at UCB.

MPEREnvironmental Test OverviewUCB, June 23, 2006 EGSE EGSE Racks have been used to test out individual probes. We have four pairs of Umb and Baseband plus two RF racks. Complete EGSE Set = Umb+BB+RF Will use two sets of racks plus two teams for Thermal Vacuum. For Probe Carrier Assembly we have new EGSE which allows display of engineering data from all five satellites with cmd/telem with one satellite (rotating).