HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora 07.04.2009 Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.

Slides:



Advertisements
Similar presentations
L.T Circuit Breakers.
Advertisements

Seminar on Circuit Breaker
Electrical Installation
Distributed Intelligence Provides Self-Healing for the Grid
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Circuit Protection  Protective Devices – terminate current flow in a circuit.  Located in series within a circuit  Excessive current flow results from.
Hyper Status and Preliminary Testing of the New Hyper Bus Fault Detector CP Work done by CP section Based on Slides from Knud DAHLERUP-PETERSEN.
1 Chapter 27 Current and Resistance. 2 Electric Current Electric current is the rate of flow of charge through some region of space The SI unit of current.
 A ‘shocking’ discovery.  In order for current to flow, the pathway must be a continuous, uninterrupted loop called a circuit.
Section 4: Electric Motors
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering.
Proposal for measurements on RB.A81 on 1st September August 2010 Emmanuele Ravaioli Thanks to A. Verweij.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
CSCM type test: Diode Leads and Diodes Gerard Willering & Vincent Roger TE-MSC With thanks to Bernhard Auchmann, Zinour Charifoulline, Scott Rowan, Arjan.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
Measurement and data extraction. How to measure the splice and diode interconnections. Accuracy and issues of these measurements. Data extraction issues.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
A PROPOSAL TO PULSE THE MAGNET BUSES TO VALIDATE SPLICE QUALITY H. Pfeffer 3/7/09 Version 4.
Air Blast Circuit Breaker
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Cold powering test results of MBHSP102 Gerard Willering, TE-MSC-TF With thanks to Jerome and Vincent and all others from TF for their contribution.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
1 A. Verweij, TE-MPE. LHC Performance Workshop – Chamonix Feb 2010 Arjan Verweij TE-MPE - type of defects - FRESCA tests and validation of the code.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
QPS Signal Analysis Case studies from MPP and QPS Bob Flora.
Tue 9/8 – Wed 10/8 Stable beams # :18 RQT12.R7B1 trip. End of STABLE BEAMS # ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
Protection of 600 A bus bars, follow up W. Venturini Delsolaro and A. Verweij MPP meeting, 17/10/2006.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
MPE Workshop 14/12/2010 Analysis of the RB and RQF/D splice data recorded with nQPS - status and plans towards full automation Analysis of the RB and RQF/D.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
STEVE HAYS AD E/E SUPPORT E4R POWER SYSTEM for HTS MAGNET WIRE TEST.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
CSCM Test description and Risk assessment  Goal  The typical and ultimate current cycle  Test sequence for type test and regular test  Risk assessment.
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
D1 and D2 powering and protection
11T Magnet Test Plan Guram Chlachidze
Superconducting Circuits, a generic view
Experience: past events and accidents
12 October 2009 RRB Plenary R.-D. Heuer
MBHSP02 test STATUS and first results
Dipole diode lead resistance measurement
Dipole circuit & diode functioning
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Pierluigi Paolucci & Giovanni Polese
0 Air Blast Circuit Breaker under the guidance of:- Presented By:- Mr. B.R.Reddy Anuj Kumar Pandey EN-3 rd year Roll No Unrestricted.
Other arguments to train two sectors to 7 TeV
Online data analysis Franco J. Mangiarotti CERN – TE-MSC-TF
Electrical measurements and diagnostics
Presentation transcript:

HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed BUS Splice (Resistance) Monitor (>1 hour) Continuous Advice Un-bypassed BUS Splices (Hi-Res < nΩ) able to measure even good splices Provide Calibration Data for Real Time Bus Inductance Cancelation Bypassed MAGNET Splices (Low-Res ?) able to detect bad splice Legacy Snapshot MAGNET Splice (Resistance) Display Old slightly invasive technique used only during special measurement campaigns Warm BUS Resistance Tunnel Measurements (ELQA) Must be completed prior to cool down Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed BUS Splice (Resistance) Monitor (>1 hour) Continuous Advice Un-bypassed BUS Splices (Hi-Res < nΩ) able to measure even good splices Provide Calibration Data for Real Time Bus Inductance Cancelation Bypassed MAGNET Splices (Low-Res ?) able to detect bad splice Legacy Snapshot MAGNET Splice (Resistance) Display Old slightly invasive technique used only during special measurement campaigns Warm BUS Resistance Tunnel Measurements (ELQA) Must be completed prior to cool down

Purpose: To continuously monitor, display, and track all splice resistances in the LHC main 13 kA circuits. (PVSS should display live bus segment voltages in a manor similar to what is now done for the quench signals.) SM Function: Fully automated data acquisition, analysis, and visual displays. Main Circuit Splice Resistance Monitor

Space Summary View Sector -> Circuit -> Element(Bus/Mag) Mean, Standard Deviation, Extrema Alarms and Limits Sector Views (8) Circuit -> Element(Bus/Mag) -> Arc Position Distribution (along Arc and Density) Alarms and Limits Time Automatic One hour before Powering to Now (until One hour after Powering) Elective Any time Window Change from Past Powering (Now- Past) Time Evolution: 3D water fall plot Space Summary View Sector -> Circuit -> Element(Bus/Mag) Mean, Standard Deviation, Extrema Alarms and Limits Sector Views (8) Circuit -> Element(Bus/Mag) -> Arc Position Distribution (along Arc and Density) Alarms and Limits Time Automatic One hour before Powering to Now (until One hour after Powering) Elective Any time Window Change from Past Powering (Now- Past) Time Evolution: 3D water fall plot Splice Monitor Scope

Splice Monitor Data Reference Parameters # of Splices / Segment Segment Names (Int /Ext) Current & Voltage Signals Only One Point every 10 seconds Fully Resolved Floating Point No Dead Band No Missing Bits Event Detection Auto Poll Current Analysis Auto Plateau Extraction All Point LLSFIT (Fall Back) dI/dt term, useful for calibration Normalization ∑R (none) ∑R/N (average) ∑R-(N-1) (preferred) Resistance Archive Storage for History Tracking

RB.A67, 14/11/2008, 15h35, I=2000A(up) B32R6: R=48±88nΩ, R 2 =0.980 BAD? 4 hours

RB.A67, 14/11/2008, 15h40, I=3000A(up) B32R6: R=46±15nΩ, R 2 =0.989 BAD? 4 hours

RB.A67, 14/11/2008, 15h50, I=4000A(up) B32R6: R=46±6nΩ, R 2 =0.995 BAD? 4 hours

RB.A67, 14/11/2008, 16h00, I=5000A(up) B32R6: R=46±4nΩ, R 2 =0.997 BAD! BAD? 4 hours

RB.A67, 14/11/2008, 16h20, I=5000A(up) B32R6: R=47±3nΩ, R 2 =0.997 BAD! BAD? 4 hours

RB.A67, 14/11/2008, 17h05, I=5000A(up) B32R6: R=47±3nΩ, R 2 =0.997 BAD! BAD? 4 hours

RB.A67, 14/11/2008, 17h15, I=6000A(up) B32R6: R=49±4nΩ, R 2 =0.991 BAD! BAD? 4 hours

RB.A67, 14/11/2008, 17h20, I=7000A(up) B32R6: R=49±3nΩ, R 2 =0.993 BAD! BAD? 4 hours

RB.A67, 14/11/2008, 17h50, I=7000A(up) B32R6: R=48±3nΩ, R 2 =0.993 BAD! OK? 4 hours

RB.A67, 14/11/2008, 18h05, I=7000A(up) B32R6: R=49±3nΩ, R 2 =0.993 BAD! 4 hours

RB.A67, 14/11/2008, 18h20, I=7000A(up) B32R6: R=49±3nΩ, R 2 =0.993 BAD! 4 hours

RB.A67, 14/11/2008, 18h30, I=6000A(down) B32R6: R=49±3nΩ, R 2 =0.993 BAD! 4 hours

RB.A67, 14/11/2008, 18h40, I=5000A(down) B32R6: R=49±4nΩ, R 2 =0.986 BAD! 4 hours

RB.A67, 14/11/2008, 18h45, I=4000A(down) B32R6: R=49±3nΩ, R 2 =0.985 BAD! 4 hours

RB.A67, 14/11/2008, 18h50, I=3000A(down) B32R6: R=48±3nΩ, R 2 =0.985 BAD! 4 hours

RB.A67, 14/11/2008, 19h00, I=2000A(down) B32R6: R=49±3nΩ, R 2 =0.985 BAD! 4 hours

RB.A67, 14/11/2008, 19h10, I=1000A(down) B32R6: R=49±3nΩ, R 2 =0.986 BAD! 4 hours

RB.A67, 14/11/2008, 19h30, I=0A(down) B32R6: R=49±3nΩ, R 2 =0.988 BAD! 4 hours

23 The nQPS Splice Monitor will feature Histogram dirtributions of the splice resistances over the full arc. This will allow us to distinguish between “normal variations” and a significantly compromised splice.

Data Flow? (required for Splice Monito r) nQPS 4200 (voltage, time) points every 10 seconds PC 24 (current, time) points every 10 seconds splice SRM monitor latency < 5 minutes (any time window)

Legacy Snapshot SD Magnet Splice Display ❖ Driven by the Sequencer for each Main Circuit ❖ Invoked by the Sequencer ❖ Starting at zero current & after ramping to each new plateau ❖ Snapshot Pairs Provoked by the Sequencer ❖ Board B ❖ Board A ❖ Each New Snapshot Pair Data Set Delivered to the SD by Sequencer ❖ Current (I) & All Snapshot Data for Each Magnet from both A & B ❖ SD Display Updated for Each New Snapshot Pair Data Set ❖ Driven by the Sequencer for each Main Circuit ❖ Invoked by the Sequencer ❖ Starting at zero current & after ramping to each new plateau ❖ Snapshot Pairs Provoked by the Sequencer ❖ Board B ❖ Board A ❖ Each New Snapshot Pair Data Set Delivered to the SD by Sequencer ❖ Current (I) & All Snapshot Data for Each Magnet from both A & B ❖ SD Display Updated for Each New Snapshot Pair Data Set

Legacy Snapshot SD Magnet Splice Display ❖ Summary View ❖ Based on Best Archived Measurements to Date ❖ Sector -> Circuit -> (Body / Center) ❖ (A + B)/ 2 = Magnet Body Splices (Center) ± identifies which half ❖ (A - B)/ 2 = Center Splice ❖ Possibility to Show A and B separately ❖ Extrema, Mean and Standard Deviation ❖ Sector View ❖ Circuit -> (Body / Center) -> Arc Position ❖ Distribution (along Arc and Density) ❖ Alarms and Limits ❖ Summary View ❖ Based on Best Archived Measurements to Date ❖ Sector -> Circuit -> (Body / Center) ❖ (A + B)/ 2 = Magnet Body Splices (Center) ± identifies which half ❖ (A - B)/ 2 = Center Splice ❖ Possibility to Show A and B separately ❖ Extrema, Mean and Standard Deviation ❖ Sector View ❖ Circuit -> (Body / Center) -> Arc Position ❖ Distribution (along Arc and Density) ❖ Alarms and Limits

A. Verweij, TE-MPE. 24 Feb 2009, QPS Review Good joint of about < 2 n Bad electrical contact between wedge and U-profile with the bus on at least 1 side of the joint Bad contact at joint with the U- profile and the wedge = 13 kA, external trigger An electrical fuse is a current interrupting device which protects an electrical circuit in which it is installed by creating an open circuit condition in response to excessive current. The current is interrupted when the element which carries the current is melted by heat generated by the current. Most types of fuses are designed to minimize damage to conductors and insulation from excessive current. Thanks to: Warm BUS Resistance Tunnel MeasurementsWarm BUS Resistance Tunnel Measurements

Warm BUS Resistance Tunnel Measurements Measurement must be done on a Warm sector Currently Sectors: A 2 cm Stabilizer Defect will increase the Resistance by 1% But so will a 1% variation in Temperature (currently 1-3%) Compensate for Temperature and possibly length Variations Measure the Resistance of each Bus segment Manually with Biddle (Microhmeter) to explore Feasibility and Sensitivity or with DVM in Tunnel Small bench top 250 V supply Drive 3 A through the Bus and Diodes With new Automated QPS system in the Future