Main Headquarters: 120 Water Street, Suite 350, North Andover, MA 01845 With offices in: NY, ME, TX, CA, OR www.ers-inc.com Standard Protocol for Non-Residential.

Slides:



Advertisements
Similar presentations
Introduction to UIS data collection tools and guidelines South East Asian Regional Workshop on Science, Technology and Innovation Statistics.
Advertisements

+ UEC Orientation Fall Agenda Undergraduate Course and Program Approval Policy (#21) and approval procedures Calendar deadlines Minimum timelines.
Strategic Priorities Consultation Survey Overview Strategic Priorities Advisory Committee November 6, 2013.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Guidelines for Energy Efficiency Measure Cost and Non-Energy Benefits Subcommittee.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Scientific Irrigation Scheduling RTF Staff/CAT Discussion RTF SIS Subcommittee November 20, 2014.
Non-Res Lighting Subcommittee Retrofit Lighting Standard Protocol Review 10/23/13.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
SOAR – Preparing for Launch Task Force Information January 2015.
Coaching for School Improvement: A Guide for Coaches and Their Supervisors An Overview and Brief Tour Karen Laba Indistar® Summit September 2, 2010.
Proposed 2013 RTF Work Plan October 15, Work Plan Development Process RTF 2014 work plan ProcessDate Develop draft work plan and present to Operations.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Staff Updates Regional Technical Forum September 17, 2013.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Regional Technical Forum November 18, 2014.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Nonresidential Lighting Subcommittee November 6, 2014.
Non-Res Lighting Subcommittee Retrofit Lighting Standard Protocol Review 04/03/14.
DHP for Houses with Electric FAF Research Plan: Revisions Adam Hadley, Ben Hannas, Bob Davis, My Ton R&E Subcommittee February 25, 2015.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Standard Information Workbook (SIW) Update Proposal Regional Technical Forum May 13, 2014.
Implementer’s Group February 2015 Meeting Debrief and Upcoming Meeting Prep February 26, 2015.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Schools Lighting Hours of Use Data Regional Technical Forum May 13, 2014.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
NAME Evaluation Report Name of author(s) Name of institution Year.
Staff Updates Regional Technical Forum March 20, 2013.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
RTF Measure Life Guidelines Subcommittee Meeting 31 January 2012 Discussion Materials / SERA.
Non-Residential Lighting Protocol - Retrofits Regional Technical Forum September 16, 2014.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
TCPS 2 Consultation: Revisions Relevant to Clinical Trials Laura-Lee Balkwill, PhD, Policy Analyst Secretariat on Responsible Conduct of Research CAREB.
CPF National Leader Networking Event October 16-18, 2015.
March 24, 2010 Integrated Project and Panel Work Plan FY 2010 OIDAP Quarterly Meeting St. Louis, MO Sylvia Karman OIDAP Member & Project Director.
0 PRIIA 305 Technical Subcommittee Conference Call March 4, :00 pm ET.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
SY Special Education Parent Survey Presenter: Donald Griffin Education Program Specialist BIE-DPA, Special Education Unit.
State Library Administrative Agencies (SLAA) FY2014 Changes to Survey Anna Sandoval Girón, Researcher Mengmeng Zhang, Research Associate American Institutes.
RTF Staff, Subcommittee and Work Updates January 23, 2013.
Scientific Irrigation Scheduling RTF Staff/CAT Discussion RTF Research and Evaluation Subcommittee December 2, 2014.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Evaluation of the Rural Community Hospital Demonstration Introduction to Annual Progress Reports OMB control #: Evaluation Team IMPAQ International.
Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT.
Northwest Power and Conservation Council Pre-Rinse Spray Valves RTF January 2007.
Subcommittee Meeting – August 23, 2011 RTF’s Small & Rural Technical Needs Study – Final Draft Report.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Research and Evaluation Subcommitee – 2014 Plans Regional Technical Forum January 22, 2014.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
RTF Subcommittee Meeting RTF Technical Support Needs for Small & Rural Utilities October 27,
Staff Updates Regional Technical Forum May 21, 2013.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Non-Res Code Compliant Lighting: Working Toward a Standard Protocol Christian Douglass, RTF Contract Analyst Non-Residential Lighting Subcommittee October.
Site Councils & The Budgeting Process Roles and Responsibilities.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
RTF Staff, Subcommittee and Work Updates February 14, 2012 IRTF.
Guidelines for RTF Measure Costs and Benefits Guidelines (formerly Cost and Non-Energy Benefits Guidelines) Proposal of Guidelines to the Regional Technical.
Commercial Operations Sub-Committee Update to TAC
USGS NJ Water Science Center 3450 Princeton Pike, Suite 110
Presentation on the LME Project toolkit
Chapter 7: Introduction to Sampling Distributions
 Available in regional language  One of the best marketing medium  Track Actions
Presentation transcript:

Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential Lighting Efficiency Measures RTF Lighting Subcommittee Meeting December 19, 2012

 Introductions  Overview of activities since RTF meeting  Review of RTF Op hours and controls survey  Review revised protocol by section  Next steps Agenda

 RTF analysis and review of provisional data collection parameters (posted online)  Evaluated reliability of operating hours  Evaluation reliability of control savings factors  Incorporated member input  Removed out of scope language  Incorporated RTF staff and consultant revisions  Revised and posted protocol  Mark-up version for tracking changes Since Last RTF Meeting

 RTF requested:  Survey of data sources statistical reliability Hours of operation Control Savings Fractions  Interview questions clearer Clarified interview scope  Occupancy and controls data to separate plan  Evaluation Subcommittee data collection plan Sample size, number and distribution Occupancy priorities, target controls Target hours of operation Protocol Changes

 Reviewers advised:  Language clarification Definitions Interview for hours of operation clearer Data collection and verification  “Cookie Cutter” methods – repeatable, reliable  Remove out of scope content to data collection Protocol Changes

 RTF evaluation of provisional data collection parameters (op hrs, control savings factors)  Review of revised protocol Review

Next Steps January 9 th RTF Protocol Comments Due January 11 th 1:00 pm next Subcommittee meeting Data collection Plan to Evaluation Subcommittee