SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
November 7, Transition Planning 1.Purpose & Scope 2.Phase List 3.Key Assumptions 4.Transition – Phase by Phase.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Language(s) We plan to develop CALCOS using Python and C Another programming language?
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Page 1. Page 2 SMOV Status SMOV is proceeding on-track Key programs executed –ERO program –Geometric distortion program completed –ACS to FGS alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Outline of CALCOS Processing Steps and Keywords Reference Files Associations.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 18 January 2007.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
May 18, 2004Ron Allen, STScI Lunch Talk1 Space Interferometry Mission (SIM) Update - May 2004 Ron Allen SIM Mission Scientist Space Telescope Science Institute.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 18 January 2007.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
October 1, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review July 2001.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review CALCOS Requirements Philip E Hodge 14 December 2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
1 Mission preparation Fred Lahuis SRON / Leiden Observatory MIRI NL Meeting ASTRON, 3 th June 2010.
Single Object & Time Series Spectroscopy with JWST NIRCam
Jesper Schou Instrument Scientist
STScI Ground System Development Status:
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003

Keyes - 22 January 2003 Slide 2 of 6 STScI Integrated Scheduling System   Bench Timing Testing of Phases 1-5 completed (T. Wheeler) – – Essential for SMGT-readiness certification – – Target Acquisition FSW component not yet tested – – Unique Timing SMS and Reconfiguration SMS-suite > > FUV and NUV completed successfully – – STScI Commanding Certification SMS > > NUV completed successfully > > FUV Commanding Certification identified minor issue Hand-edited SMS ran successfully > > FUV testing requires FUV detector ETU > > Will re-test remotely (including Target Acquisition) within 6 weeks – – Testing and results are very positive!

Keyes - 22 January 2003 Slide 3 of 6 New Launch Date Impacts   Ground System Development – – SMOV4-related > > SMGT now planned for late June, 2004 > > Special commanding definition now required by September, 2003 COWG will establish requirements in spring > > Requirements (other activities e.g., on-orbit calibration) : definition Sep-Nov 2003 – – Revised STScI Phase Development Plan > > Includes new work items and updates

Keyes - 22 January 2003 Slide 4 of 6 COS Phase Development Plan (Rev 8, 01/06/03) Phase 1 (1/1/00 – 6/30/00) vMacro Development vReconfigurations Phase 2 (7/1/00 – 12/31/00) vNUV Timetag Mode + Darks vFUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) vFUV & NUV Accumulation Science Exposures vFUV & NUV Target Acquisition Exposures vFUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) vAperture Alignment Exposures vOSM1 Focus Alignment Exposures vOSM1 Rotation Alignment Exposures vOSM2 Rotation Alignment Exposures vFUV & NUV FP Split Exposures Phase 5 (1/1/02 – 6/30/02) vFUV & NUV GO Wavelength Calibration Exposures vFUV & NUV Flat Field Lamp Calibration Exposures vFUV & NUV Automatic Wavelength Calibration Exposures vSAA Contours Phase 6 (7/1/02 – 12/31/02) vFUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) vFUV & NUV Flat Field Lamp Rework vCoordinated Parallels Phase 8 (7/1/03 – 12/31/03) vOSM Overheating Avoidance vSMGT Preparations vSMOV Special Commanding vFUV & NUV Anomalous Recovery vFUV & NUV Initial Turn-on Phase 9 (1/1/04 – 6/30/04) vTRANS ovratalstart, ovratalend Phase 10 (7/1/04 – 12/31/04) vFUV & NUV Lifetime Adjustments

Keyes - 22 January 2003 Slide 5 of 6 STScI Calibration Pipeline Status  OPUS – – Successful testing with integrated SI data (from N 2 purge) – – Testing against latest DM-06 and Target Acquisition data suite planned – – COS Keyword Dictionary in preparation  CALCOS – – Most modules are now complete – – Successful testing with integrated SI data (from N 2 purge) – – Draft of ICD-47 is being reviewed

Keyes - 22 January 2003 Slide 6 of 6 STScI Thermal-Vac Support  STScI Coordination with IDT (STScI lead: Sembach)  OPUS support of Thermal-Vac – – MOU requires STScI to deliver T-Vac version of OPUS two months in advance of T-Vac – on-track > > Require test (simulator) target acquisition images 2-4 weeks in advance of this date if OPUS delivery is to include target acquisition functionality > > Minor T-V logistics issues being worked (e.g., additional k/w) > > Coordination ongoing with IDT – all nominal  STScI Staffing Support at T-Vac – – All STScI COS Instrument Scientists on-site on rotating basis