Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

1 MICE Project Board Schedule and risk discussion Introduction Project Management comment Schedule considerations Adapting the schedule/reacting to circumstances.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MICE Top-Level Project Schedule Step IV Step V Step VI Revision date: 17 th June,
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
1 APRP Meeting MICE UK work packages Costs and schedules Organisation and monitoring Schedule summaries Cost summaries Andy Nichols, STFC, 15/8/11.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Executive Board Meeting Roy Preece 23rd May 2014
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting CM36 will be Jun at IIT and the 19th at Fermilab right before.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
Status of the MICE Construction Project
Outcome of the Review and Response to Recommendations
UK Financial Plan & Risks
MICE CM31 Schedule summary
Presentation transcript:

Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece

Content The Construction Project Top Level Schedules Interface and decision points Top Level Financial Summary Top Level Risk Summary Response to recommendations

The Construction Project Status of the MICE Construction Project

Responsibilities for Step IV equipment Sub-systemResponsibility Spectrometer solenoid #2US Spectrometer solenoid #1US Fibre tracker #1 + #2Japan, UK, US Focus coil #1UK LH 2 system AUK Lithium hydrideUS LH2 absorberJapan DiffuserUK Virostek plate & TOF cage assyUK, US Substation upgradeUK EMRGeneva (Radiation shutterUK) AFC Moving platform #1UK SS platforms Installation Partial Return Yoke UK UK, US Spectrometer Solenoid #1 shipping Focus Coil #1 being tested Focus Coil #2 arrive back to RAL mid May Lithium Hydride – shipping being arranged PRY – UK orders out / US very soon

Responsibilities for Step VI equipment Sub-systemResponsibility Focus coil #2 and #3UK LH 2 system B and CUK LH2 absorbers #2 and #3Japan RFCC modules [magnets/RF hardware]US RF power systemUK AFC moving platforms #2 and #3UK RFCC moving platforms #2 and #3 Partial Return Yoke UK UK, US LH2 Absorber #2 ready for shipping Focus Coil #2 at RAL mid May

Infrastructure Complicated and tight installation. The plot does not include the Partial Return Yoke (PRY)

Top Level Schedules Status of the MICE Construction Project

Progress The US deliverables schedule contain contingency and risk. All tasks have been analysed in detail for realistic delivery dates. –Partial return yoke has had significant work The delivery dates feed directly into the master schedule and drive the program Care is taken to avoid “double accounting” of time contingency –The delivery dates feeding into the master have 35% contingency added –No additional time contingency on the milestone –Risk does factor on the milestone – problems with shipping, customs etc… The master schedule contains a 35% time contingency on all task The contingent program is the baseline –“Optimistic” schedule will be in plots This is the schedule where no UK contingency has been added –“Delayed due to Risk” schedule will be in plots Risk applied to the baseline schedule (with contingency

Dashboard is updated monthly and can be found

Integration of Step IV Critical path for installation of Step IV Baseline schedule includes 35% time contingency. Commissioning of the magnets now has a more detailed plan. Commission both of the Spectrometer Solenoids in an intensive daily operation. Commission lattice – unknown but analysis of induced loads and temperatures being investigated Table 2 can be found on page 5 of the RLSR paper

Integration of Step IV Illustration of the Baseline evolution Risk evolution if ALL risk hit in sequence – not realistic due to constant mitigation actions. Specific Construction and Commissioning phases to deepen understanding of when the channel will be available for scientific operations. Figure 1 can be found on page 3 of the RLSR paper

Interface and Decision Points Status of the MICE Construction Project

Delivery of the SS#1 underway – arrival in UK scheduled for 30 th April. Two Focus Coils – decision following tests for which to use and at what level of operation. –More detail during the MPB Focus Coil presentation. Decisions for advancing to Step VI may be taken out of the hands of the project –Information from programme offices, US / UK, in the coming months –Removal of RFCC2, Liquid Hydrogen C, Focus Coil 3, LH2 Absorber 3 and two RF systems. –More detail of pressures / scenarios in later talks. Table 1 can be found on page 3 of the RLSR paper

Top Level Financial Summary Status of the MICE Construction Project

Spend profile according to the current understanding of advancing to Step VI Delivery of RFCC#1 FY 17/18 – MTA magnet would move the spend profile Figure 3 can be found on page 8 of the RLSR paper

Top Level Risk Summary Status of the MICE Construction Project

ISIS operations team has been agreed. Commissioning of the lattice is an un-known entity Logistics of having large quantities of LHe on hand – Interaction with BOC Number of people to carry out an intensive period – expert knowledge (SS and FC) Interaction of the magnets – Loads and Cold mass inductive heating causing quench of whole channel. Not reaching acceptance criteria Run at de-rated current Impact on the operational current for Step V – re-working of magnets will be required Low level risk of an un-known electronic / electrical item

Response to recommendations Status of the MICE Construction Project

1.Complete the first action from the previous meeting. While the panel appreciates the work to date it feels there is a need for more coherence between the two side, especially embedding of risk-contingency into schedule. 2.Produce a coherent single project plan that takes into account the schedule above by the next meeting. I feel the recommendations have been answered during the previous slides. The interaction points are well known - shipping, magnet training periods Updates and discussion of the schedule, and risks, are discussed in the MIPO meetings held every two weeks Identify known technical issues that may affect the schedule for MICE termination at Step IV, Step V and at Step VI

Stop at Step IVStop at Step V Release the construction team End of FY 14/15 Focus Coil #3 – no longer required Require both FC#1 and FC#2 to be operational at acceptance criteria. PRY design and manufacture removedLH2 system #3 – No longer needed LH2 system #2 procurement – No longer needed Additional design and procurement for PRY Changes to current infrastructure to accommodate larger PRY RF amplifier system #2 commissioning and installation – No longer needed RFCC #2 winding, testing and cryostat – not required RFCC Magnet – No shipping or installation No need to fix FC#1 / #2 A great deal of investment made for Step V operational equipment RF equipment Focus Coil #2 Absorber #2 RF Cavities Zero benefit could be gained from the investment so far Physics deliverable insufficient to support serious development of future technologies Nearly all investment made would be wasted