Upgrade Review Meeting Introduction Craig Buttar University of Glasgow RAL 10/5/11.

Slides:



Advertisements
Similar presentations
GridPP4 – Revised Plan Implementing the PPAN recommendations.
Advertisements

Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Making a Financial Case: The Loughborough Context ILM Level 5
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
D. Britton Collaboration Board Meeting David Britton 16/Jul/07.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Project Charters Module 3
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
Request for Proposal (RFP)
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
TDAQ Upgrade Software Plans John Baines, Tomasz Bold Contents: Future Framework Exploitation of future Technologies Work for Phase-II IDR.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
THINK EFFICIENCY Administration Review Customer & Support Services Scrutiny Committee 24 th November 2008.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
UK Participation in phase-II tracker upgrade o Brief Overview of R&D work to date1 slide o Scope of Interest of UK institutes2 slides o Task list & Institute.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
NSW Electronics Preliminary Design Review Feb 2015 Introduction and Review Scope Feb 2015 NSW ELTX PDR S. Zimmermann 1 Stephanie Zimmermann.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Dan Tovey PPAP Jamboree July LHC GPD Upgrade Status and Plans Dan Tovey University of Sheffield.
DOE Mini-Review Summary and Management Updates Mark Palmer Fermilab March 15, 2013.
Technology and R&D Summary and next steps Burkhard Schmidt.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Draft of 3 year CMOS Strip Programme Need to advise WG3 on likely resource requirement Draft Outline provided at Valencia Discuss and improve basis for.
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
Project Management PTM721S
Status of the MICE Construction Project
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Project Management Lifecycle Phases
Request for Proposal (RFP)
Cutover & Implementation Aggregated Programme RAG
Preliminary Project Execution Plan
Presentation transcript:

Upgrade Review Meeting Introduction Craig Buttar University of Glasgow RAL 10/5/11

Outline Report from OsC Status of the budget Next OsC International context Project management issues – Use of working allowance Aims of this meeting 210/5/11 UK-ATLAS Upgrade Review meeting: May 2011

UK ATLAS Upgrade project 13 Universities STFC/RAL PPD STFC TD RAL/ATC Three year project – April 2010-March 2013 R&D for ATLAS Upgrade programme – Maintain UK leadership – Builds on heritage of current ATLAS development and construction and Tracker Upgrade project 310/5/11 UK-ATLAS Upgrade Review meeting: May 2011

Report from OsC Impressed with the work done Reporting procedures to be revised – Report by areas (  tracker + L1CALO, L1Trk, HLT, Computing?) Key issues raised for next meeting – Budget – Establish baseline – Other issues Impact: working with UK industry Understanding the interfaces in the tracker project Next OsC Friday 8 th July – Deadline for documents Friday 10 th June 10/5/11 UK-ATLAS Upgrade Review meeting: May

OsC Feedback and actions Feedback to the Collaboration 1.1The Committee congratulate the Collaboration on achieving as much as they had given the funding constraints and in light of the changes to the LHC schedule. They also congratulate the Collaboration on the UK roles in the international collaboration and express their support of the project. 1.4The Collaboration request an updated set of Finance Tables by the end of May 2011 showing a reconciliation of the project grant and RG funds within the overall funding enveloped approved. 10/5/115 UK-ATLAS Upgrade Review meeting: May 2011

Project issues Total budget to reconcile with PPAN award – Due to RGs not being cut – Project funding is 68% of proposal – Require saving of ~£1M UK-CB meeting to discuss how to achieve reduction – Identify savings via 15% reduction in RG NOTE: not a cut in RG posts, redeployment of effort within RGs Generally, effort moved into generic R&D and ATLAS M&O – Further savings from underspend in PPD and TD in FY 10/11 – Small savings from consumables and travel – (£70k deficit remains) 10/5/11 UK-ATLAS Upgrade Review meeting: May

Impact of RG reduction Revised budgets and FTEs received from groups FTE information circulated to WP leaders and Area managers to evaluate impact – To be discussed today – Will be required to justify programme with reduced effort to OsC Back of the envelope calculation – Approx 12FTEs lost across Universities in FY11/12- FY12/13 out of a total of 142FTE – Less than 10% cut in FTEs – So we should be ok, but ! 10/5/11 UK-ATLAS Upgrade Review meeting: May

Top level deliverables 1.5The Committee feel that the Collaboration need a clearly established baseline project management plan for the descoped R&D phase of the project. This recognises some of the uncertainties that still exist with future developments and the need for effective project management in what is a large and complex project. 10/5/11 UK-ATLAS Upgrade Review meeting: May

Top-level deliverables: Tracker As presented at last OsC meeting Strip tracker: – A full electrical 250nm tracker stave, – A full length 130nm thermo-mechanical stave, – A 130nm electrical short stave (stavelet) Pixels: – Tested IBL sensors, – Layout of pixel system for upgrade, – Delivery of 4-chip prototype modules for pixel upgrade 10/5/11 UK-ATLAS Upgrade Review meeting: May

Top-level deliverables: Trigger and computing L1Calo: – trigger performance studies for input to phase-I and phase-II trigger upgrade; – conceptual design of a topological processor; – technology evaluation for L1Calo hardware Track trigger: – performance studies – conceptual design of a track trigger HLT : – Upgrade and optimisation of the HLT tracking, – trigger selections and steering software. 10/5/11 UK-ATLAS Upgrade Review meeting: May

Top level deliverables: computing Computing: – Software for full simulation of events with pile-up; – improved use of memory in software; – Updated radiation level calculations Discuss today and confirm these as the baseline top-level deliverables and identify key milestones and schedule 10/5/11 UK-ATLAS Upgrade Review meeting: May

Physics & Simulation Simulation and software cuts across the upgrade both for Phase-I and Phase-II – Need to make case based on physics and performance to collaboration and funding agencies Technical issues: implementation of geometries in GeoModel Merging Utopia into mainstream releases (64bit identifiers) Validating pileup tools to go 5x10 34 Physics and performance studies Progress with L1CALO Work needed to understand L1MU simulation Justification for pixel system in phase-I 1/4/1112Oxford ATLAS Upgrade week: Summary

Simulation and Software Fast and full simulation tools – Fast tracking Fatras: basic layout studies with single-particles – Full simulation Geant4: more detailed analysis eg fakes and material issues Studies often show up issues that apply to current detector and software 64-bit release of deploying on GRID – Validate and then produce high luminosity samples Work can count for authorship – Many interesting tasks – Is there a list somewhere? – Encourage participation through OTP credit? 1/4/1113Oxford ATLAS Upgrade week: Summary

Other issues from OsC report 1.7The Committee ask the Collaboration to include their change control procedures within the project management plan, including changes in technology or to specification, so as to provide the Committee with a clear overview of how the Collaboration is recording and managing change. 1.8The Committee agree that the Collaboration should consider how the services side of upgrade will be managed. Although they are not directly responsible for this aspect of the project, they should be willing to influence this and impact on any possible solutions. The Committee request that a short report on this area be included in the next report. 1.9In their next report, the Collaboration is asked to outline their impact plans and agenda, including efforts to engage with UK industry, planned CASE studentships etc. 10/5/11 UK-ATLAS Upgrade Review meeting: May

Integration Services – Need to understand services from ID out of ATLAS – Type III and Type IV cables would be very difficult to replace (as would be SCT type II) → do re-use Limited number of new services possible in parallel (for optical fibres and cooling), but not for electrical cables. Is this compatible with powering (LV and HV) options discussed at the moment? Schedule implications if we decide to replace these cables – Need feedback to this assumption 1/4/1115Oxford ATLAS Upgrade week: Summary

Timeline for next OsC meeting As discussed at PMB 19/04 Define key deliverables: Area managers to lead discussion at jamboree, key deliverables to be finalised by 13/5 Define milestones: WP managers to present draft milestones at jamboree, finalise milestones by 13/5 Draft area Gantt charts to be prepared for Jamboree: 10/5 Revised Gantt charts ready: 16/5 PMB to review deliverables, milestones, gantt charts: 18/5 Draft sections ready: 18/5 Executive summary (Craig), Area summaries (Richard, Norman, Roger), Key deliverables (Richard, Norman, Roger), Gantt charts (Ian), Staffing tables (Ian), Finance tables (Ian), Risk register (Ian) Ian to collate into draft document. Revised document following PMB review ready and circulate to CB: 27/5/11 Submit to STFC 10/6/11 10/5/11 UK-ATLAS Upgrade Review meeting: May

LHC and ATLAS schedules LHC Phase-0 Shutdown: – End 2012-mid 2013 – Physics resumes 2014 Phase-I shutdown – End of 2017 – Physics resumes end of of 2018 Phase-II – End of 2021 ATLAS Phase-0 – IBL installation – Repairs/consolidation Phase-I shut down (being discussed) – Muon small wheels – Mini-FCAL – L1 calo topological trigger – Calorimeter readout – NewPix Phase-II – Tracker  ready on surface end of 2020 – TDAQ – Phase-I carry-over 10/5/11 UK-ATLAS Upgrade Review meeting: May

LHC issues Unless experiments make a clear statement for 25ns bunch-crossing, LHC will go to 50ns as it is less challenging option – But we should be prepared for 50ns as technology may drive this (x2 in tracks but leveling means still only about 200 pile-up events/crossing) When do we know? – More simulation Where are we with this? 1/4/1118Oxford ATLAS Upgrade week: Summary

Timetable for approval LoI Dec 2011 – Cover Phase-I in detail and some Phase-II information Ph-I TDRs Ph-II TDRs Dec /5/11 UK-ATLAS Upgrade Review meeting: May

Aims of the meeting Review work done Evaluate impact of RG reductions – Highlight issues Prepare for next OsC – Baseline deliverables and milestones Raise and discuss issues within areas and across areas – Physics studies and computing issues – Integration of the tracker 10/5/11 UK-ATLAS Upgrade Review meeting: May

UK-ATLAS organisation 10/5/11 UK-ATLAS Upgrade Review meeting: May