Aristotle University of Thessaloniki QC – QA readiness at AUTh tooling and procedures D. Sampsonidis, P. Charalampous, S. Kompogiannis, and C. Lampoudis.

Slides:



Advertisements
Similar presentations
Alignment systems for GlueX GlueX Collaboration Meeting Bloomington, Indiana May 20-22, 2004 Courtesy of Dimos Sampsonidis, Aristotle University of Thessaloniki.
Advertisements

Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Status of the ATLAS MM project
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers University of Athens (UoA) Tube wiring/assembly (30,000.
Status Update on Mechanical Prototype in Rome November 6,
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Precision Measurement
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Geometrical Measurements of the TEC Elements Goals internal survey external survey LINK calibration Means 3D CMM Cosmics Geodesy Procedure Conclusions.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
M. Bianco On behalf of the ATLAS Collaboration
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Producing a Mail Merged Letter Step 1 Create an Access database for Names and Addresses you can use the ‘Customers’ template in Group Work. Enter the necessary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas, E.Ferrer-Ribas, Ch.Flouzat, J.Galan, W.Gamache, A.Giganon, P-F.Giraud, P.Graffin,
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
22/07/2003TOF Gas System PRR (C. R. Gregory) 1 TOF GAS SYSTEM Production Readiness Review SYSTEM INTEGRATION.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Organising 904 RPC lab Ian 23 April Already done, ISR I3-I4 tunnel is empty. Move out and chamber/gap sorting done in the ISR. Manpower available.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
LARGE AREA DETECTORS LABORATORY JUNE 8-12, 2015 A. Mastroberardino, A. Policicchio, D. Salvatore, Marco Schioppa and P. Turco.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
DATABASE ARCHITECTURE PROPOSAL Fabien Jeanneau – 19 jan 2015.
S.Movchan Straw manufacturing and QC
Update on Pavia MM mechanical prototype
Remaining items (per module) for panel construction (mostly Fabien)
Sector 002 Assembly status report
News about the WA104 Programme
Tracker Outer Barrel COOLING Antti Onnela, CERN.
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
F. Ronchetti, INFN-LNF, September
TPC Development at Cornell
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

Aristotle University of Thessaloniki QC – QA readiness at AUTh tooling and procedures D. Sampsonidis, P. Charalampous, S. Kompogiannis, and C. Lampoudis working group meeting Jan 2015, AUTh

Aristotle University of Thessaloniki Contents  Fr4 boards and Al-frames (thickness, holes)  Controls (stiffback, glue, mesh)  Drift panels (thickness, planarity, gas/electric tests)

Aristotle University of Thessaloniki Fr4 and Frames ElementsOptionsReadinessRemarks Fr4 board holes position Template (precision ?) ? To be copied from Module0 from CERN Fr4 boards thicknessDial gauge  Mitutoyo/ Use of custom made Al-profile track system on granite table Frames and Cooling pipes min/max thickness and bend/twist Dial gauge/CMM/ Limbo with feeler- gauge/precision ruler  Mitutoyo, CMM, Granite bar, ruler/ Use of custom made Al-profile track system on granite table Frames holes positions Template precision (?) ? To be copied from Module0 from CERN

Aristotle University of Thessaloniki Control ElementsOptionsReadines s Remarks Stiffback periodical check Rasniks/Ruler  Rasniks Glue portion deposited (fixed glue weight/speed deposition) ? Use of custom made Al-profile track system on granite table Mesh cleaniness ?? Suggestions from experts

Aristotle University of Thessaloniki Drift panels ElementsOptionsReadinessRemarks Thickness - Planarity CMM, laser tracker, dial gauge  Mitutoyo, CMM/ Use of custom made Al-profile track system on granite table Gas tightness Use of vessel, Ar sniffer, dp/dt ?? Ar sniffer available on site Mesh tensionTension-meter  Grunig G-check tension-meter available on site Electrical tests Power supply, ohm-meter etc.  Tools available on site

Aristotle University of Thessaloniki Alu-profile setup Custom made frame for use on the granite table

Aristotle University of Thessaloniki Concluding remarks Several tools available on site (old and recent purchases) Tests on the way (mesh/tension-meter recently acquired) Purchases pending – to be identified (vacuum pumps, new dial gauge meter) Readiness total score ≈ 60%