Out Patient Entrance Before Construction. Out Patient Entrance After Construction.

Slides:



Advertisements
Similar presentations
Subject: Final Presentation of Wayfinding and Signage Design For: Loyola University Health System Date: March 21, 2003 By: APCO Graphics, Inc.
Advertisements

SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
Yate health centre and locality hub development
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
FP- Level 0FP- Level 1FP- Level 3FP- Level 4FP- Level 5FP- Level 6FP- Level 7 INTERIOR Dining 2 Dining 1 Admitting FLOORPLANS EXTERIOR Site Plan Overall.
Heart or vascular Surgery at the Heart & Vascular Institute.
Campus signage – Internal
September 21 Update. Future Main Entrance (looking south)
CEAPRC PHOTO TOUR by Local Organizing Committee Welcome !
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
College of Dental Sciences Dental school building.
3a. Pursue funding for the program plan to effect a transformation that is almost complete…Information Commons.
Numbers
The Dent Surgeon, Inc. Services Available Paintless Dent Removal Bumper Repair Paint Repair Scratch Repair Headlight Restoration.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
PREECHA SIRITONGTAWORN,MD,FRCST,FAC S. DEPARTMENT OF SURGERY FACULTY OF MEDICINE SIRIRAJ HOSPITAL.
SANDEEP GOVALKAR DESIGN ASSOCIATES
Modernization Project Identify Priorities – Patient Safety Quality of Care Efficiency Discover Opportunities - Existing Hospital Garner Regulatory Support.
NERMC Volunteering. 5 Reasons To Choose NERMC 1) Rated as Becker’s Top 50 (2011) & Reuter’s Top 100 (2009) Best Hospitals in the Nation 2) Provides Medical.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
North Augusta High School Design Development Presentation.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
Introduction to the DNV-Goedstrup project DNV-Gødstrup is the patients hospital. The hospital is efficient, competitive, quality conscious, and focused.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Barwell and Hollycroft Medical Centres GP Patient Survey Results.
Sheikh Zayed Tower.
COZYEON Residence Main facilities gallery. Corridor of each floor.
MGH 2.0 Marin General Hospital Finance Committee Meeting November 19, 2015.
SIZE - Top SERVER ROOM Designed by – openbox |
10Canteen Conference Center 9Medical/Surgical Unit ICU Stroke/Rehabilitation 4Central Sterile Processing Administration Lab 3Surgery CVICU Surgery.
The New Leavelle McCampbell Middle School Design Development Presentation.
TUESDAY 05/04/2016 Professional English in Use, Medicine Hospitals.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Housing Service Review Service Report 1 June 2015.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
Al Amal complex for mental health -Dammam
FURNITURE & PREPOSITIONS OF PLACE
KENDRIYA VIDYALAYA DUNGARPUR (RAJASTHAN)
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Penn Medicine Chester County Hospital
Columbus State Community College
Review of Giving Directions
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
Northwest Hospital Childbirth Center Planning
2a. Number and percentage of construction establishments and employees, by establishment size, 2012 (With payroll) Establishment size.
Roslin Primary School.
THANK YOU!.
Vanderbilt Emergency Department Renovation Project
KOMPLEX Investors Report – Q
Thank you.
Thank you.
South 6th Street 6th Avenue 5th Avenue

Around the room Orders of operations.
MAY 4, :25-09:30 Admin. Remarks 09:30-09:40 Welcome Speech Host Nation (Paraninfo, 1st floor) 09:40-10:00 Opening Brief: BILC Chair 10:00-11:00.
WES Renovation Update Photo Gallery
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
North Augusta High School – Phase 2A and 2B
My Dream Living Room Mrs. Nykamp.
BUILDING LIGHTING PLAN PHASE II
Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.
The New Leavelle McCampbell Middle School
1.
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

Out Patient Entrance Before Construction

Out Patient Entrance After Construction

Out Patient Entrance Before Construction

Out Patient Entrance After Construction

Emergency Registration Before Construction

Emergency Registration After Construction

Out Patient Entrance Before Construction Note the Coffee Caddie

Out Patient Entrance After Construction

Out Patient Entrance Before Construction

Out Patient Area After Construction

Out Patient Area Before Construction

Out Patient Waiting After Construction

Out Patient Waiting Before Construction

Out Patient Waiting After Construction

Thanks Marsha & Pattie! Out Patient Waiting After Construction

ICU Waiting Room Before Construction

ICU Waiting Room After Construction

ICU Waiting Room Before Construction

ICU Waiting Room After Construction

ICU Waiting Room Before Construction

ICU Waiting Room After Construction

North Wing Vending Area Before Construction

North Wing Vending area After Construction

North 2 Waiting Room Before

North 2 Waiting Room After

North 2 Before

North 2 After

Day Surgery Waiting Room Before Construction

Day Surgery Waiting Room After Construction

Surgery Consultation Room After Construction

Surgical Waiting Kitchenette Area After Construction

Surgical Waiting Area Before Construction

Surgical Waiting After Construction

Employee Entrance Before

Employee Entrance After

Main Corridor After Construction

Fresh Paint

New Photos

New Flora

New Floors

New Furniture

Ground Floor Lobby During Construction

Ground Floor Lobby After Construction

Ground Floor After Construction

Ground Floor Before Construction

Ground Floor After Construction

Ground Floor Vending Area Before Construction

Ground Floor Vending Area After Construction

New Photos

Ground Floor Before Construction

Ground Floor After Construction

New Photos

Ground Floor After Construction

Ground Floor Before Construction

Ground Floor After Construction