1 Sheikh Zayed Tower

2 The Charlotte R. Bloomberg Children’s Center

3 NCB Goals Broad Goals Provide a patient and family centric clinical environment Private rooms Family support space Quiet Segregation of clinical and support spaces Increase the intensive care capacity of the hospital Introduce new technology to enhance communication between patients and caregivers Provide caregivers increased space and tools to support patient care Replace outmoded facilities GOR ICU’s Adult and Children’s Beds

4 NCB Summary Data Basic Information 980,000 sf of new space
Beds (All Private) Adult 224 Adult Medical/Surgical beds 96 ICU 35 Obstetrics Total 355 Adult Beds Pediatric 100 Pediatric Medical/Surgical 20 Child & Adolescent Psychiatry 85 PICU and NICU Total 205 Pediatric Beds

5 NCB Summary Data Continued
Operating Rooms, PACU’s and Recovery 30 New Operating Rooms 6 Cardiac 14 General 10 Pediatric 107 Prep and Recovery Bays

6 The Johns Hopkins Hospital New Clinical Building Project
Stacking Diagram – Appendix A-1 Connections to the Nelson Building Towline = NCB B2 Nelson Sub Basement = NCB B1 Nelson Basement = NCB 1 (Ground Level) Nelson 1 = NCB 2 (Main Level) Nelson 2 = NCB 3 Nelson 4 = NCB 4 Nelson 5 = NCB 5

7 Children’s Center Entrance

8 Sheikh Zayed Tower Public Elevator Lobby

9 PICU Patient Room

10 Adult Patient Room

11

12

13

14

15 NCB Critical Dates August, 2011 – Substantial Completion
Building Turned Over to Owners “Punch out” Retrofitting Begins Building Still Considered Construction Zone Limited Access November, 2011 Construction Complete Staff Training and Orientation Begins Large Equipment Installed and Calibrated Office Moves Start

16 NCB Critical Dates Saturday, January 28, 2012 Sunday, January 29, 2012
Operating Rooms Move Sunday, January 29, 2012 Adult and Pediatric Emergency Moves Children’s Center M/S and PICU Beds Move Monday January 30, 2012 Adult and M/S and ICU’s Beds Move Obstetrics and NICU Beds Move