SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.

Slides:



Advertisements
Similar presentations
CALIBRATION WRINKLES Project OBJECTIVE: Test techniques for improving echelle-mode wavelength  scales of STIS, solar-system’s premier high-res UV.
Advertisements

Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Early Results from the COS Time-Dependent Spectroscopic Sensitivity Programs Rachel Osten TIPS presentation, Jan. 21, 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
Initial Alignment Check / Calibration in Vacuum Dennis Ebbets With substantial contributions from Tom Delker, Erik Wilkinson, Steve Osterman, Ken Brownsberger,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
The Status of COS Flat Fields Tom Ake TIPS 21 August 2008.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review July 2001.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
The Status of HST/COS and HST/STIS Cristina Oliveira 8/12/14COS and STIS Cal Workshop1 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA.
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
Cosmic Origins Spectrograph November 13, 2003 Page 1 “Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
Introducing the INS Master Schedule Wayne Baggett.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
COS FUV Flat Fields and Signal-to-Noise Characteristics
Calibration of the Cosmic Origins Spectrograph
WFC3 Pipeline Critical Design Review October 16, 2001
STScI Ground System Development Status:
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 2 of 12 Synopsis Role: STScI supports COS science operations by leading development of “front-end” (operations) and “back-end” (OPUS/MAST/calibration) ground system and user support functions. COS project is led by NISD, and presently consists of 12 people (7.65 FTE) drawn from NISD, SISD, and ESS. The project is on track (green) –most recent report: 15 January 2002

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 3 of 12 Health Chart SubprojectStaffin g ScheduleTechnical Instrument Development OK (g)ongoing (g) IDT/STScI MOU (g) NUV Grating reflectivity (g) FUV I & T CU/UCB (y) Commanding and RPS2 OK (g)ongoing (g) OP-01 (g) FP-SPLIT development (g) calib exposure development (g) Pipeline and Calibration OK (g)ongoing (g) keyword development (g) pipeline development (g) CDRs (g)

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 4 of 12 Accomplishments SI News: –backup FUV door-opening mechanism repair completed, vibration tested, and fully functional in T-V tests; both backup and primary mechanism open and close door successfully in T-V tests –FUV flight detector QE grid breakage in detector T-V testing Detailed investigation presently underway; full review of qualification and inspection procedures; 3 week schedule impact (presently yellow) –NUV grating reflectivity; recovery completed (previously yellow now green) G185M: G225Ma will be used as flight optic; AlMgF coating – throughput exceeds spec, increased spectral range; possible lower resolution G225M: G225Mf will be used as flight optic; bare Al coating – throughput exceeds spec; full resolution spec maintained G285M: G285Md will be used as flight optic; bare Al coating – throughput exceeds spec; full resolution spec maintained G230L flight-accepted grating meets specification; no changes required IDT delivered hardware-generated FUV detector test images to STScI; in addition to previous MOU deliverable

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 5 of 12 Accomplishments (cont.) Issued closure report for OPUS/HDA and calcos CDRs Completed OSM thermal issues review; drafted detailed operations implementation plan Continue STScI FSW macro-timing test evaluations Draft TV-specific keyword set prepared Start COS Mini-Handbook development STScI scheduling system –Completed development of FP-SPLIT exposure capability (final Phase 4 component); on schedule Ops bench testing at Ball per Ball FSW availability timeline (Apr 02) –Commenced development of Phase 5 Scheduling System components GO “WAVECAL” exposures completed on April 1; on schedule FLATFIELD exposures in code review; on schedule SAA contours in code review; on schedule

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 6 of 12 COS Phase Development Plan (rev 6, 10/26/01) Phase 1 (1/1/00 – 6/30/00) 1.Macro Development 2.Reconfigurations Phase 2 (7/1/00 – 12/31/00) 3.NUV Timetag Mode + Darks 4.FUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) 5.FUV & NUV Accumulation Science Exposures 6.FUV & NUV Target Acquisition Exposures 7.FUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) 8.Aperture Alignment Exposures 9.OSM1 Focus Alignment Exposures 10.OSM1 Rotation Alignment Exposures 11.OSM2 Rotation Alignment Exposures 12. FUV & NUV FP-Split Exposures Phase 5 (1/1/02 – 6/30/02) 13. FUV & NUV GO Wavelength Calibration Exposures 14. FUV & NUV Flat Field Lamp Calibration Exposures 15. FUV & NUV Automatic Wavelength Calibration Exposures 16. SAA Contours Phase 6 (7/1/02 – 12/31/02) 17. SMGT Preparations 18. SMOV Special Commanding 19. FUV & NUV Anomalous Recovery 20. FUV & NUV Initial Turn-on 21. FUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) 22. FUV & NUV Lifetime Adjustments

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 7 of 12 Plans Planned Activities and Future Milestones: Continue COS Mini-Handbook development Continue Phase 5 FLATFIELD exposure and SAA contour development Commence Phase 5 AUTO-WAVECAL exposure development Continue STScI FSW macro-timing tests on ops bench Complete review and issue OSM thermal issues report Continue keyword review; add TV-specific keywords to ICD-19 Continue FASTEX review of COS flux calibration standards Milepost Dates: {+ ==> later than last report} –COS integrated SI test data to STScI: 1 Sep 2002 (+3 months) [Ball timeline] –SI delivery to GSFC: 20 Feb 2003 (+3.5 months) [Ball timeline] –Launch: February 2004 (no change) [SM3B + 2 yr]

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 8 of 12 Detailed Schedule

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 9 of 12 Resource Summary Current COS Resources (FY 02) –NISD 3 Scientists (3.0 FTE) –SISD 1 Data Analyst (0.5 FTE) –ESS 1 System Engineer (0.5 FTE) 1 Command Development System Engineer (1.0 FTE) 1 Instrument Engineer (0.4 FTE) 2 Developers (1.25 FTE) Pipeline Development (1.0 FTE)

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 10 of 12 Metrics Progress versus Planned Milestones and Requirements: –8 of 9 planned activities completed within reporting period COS Pipeline CDR Requests for Action (RFA) Items: –Final report issued COS Operations Working Group Action Items: –0 opened, 2 closed during review period –4 presently open (1 High, 2 Medium, 1 Low) COS Calibration Working Group Action Items: –0 opened, 1 closed during review period –0 presently open

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 11 of 12 Issues Note: Arrows indicate trend (same, better, worse) by direction (right, up, down), and current impact (resolved/no issue, medium, severe) by color (green, yellow, red).  TitleIssueImpactActionStatus Instrument Development NUV grating reflectivity None to STScI short-term; IDT long- term schedule impacts were possible IDT recovery plan completed All NUV gratings in flight-ready status and available at Ball for integration in SI FSW Status at Ball Delay of FSW implementation for target acq (Build 4.0) Delays timeframe for testing our acq commanding and delays availability of subset of test image data Revised FSW development schedule implemented at Ball. STScI front-end development completed; delta OPUS/HDA delivery no longer necessary; remains on-schedule this period (g)  (y)

Cosmic Origins Spectrograph Monthly Status Review 22 April 2002 Charles D.(Tony) Keyes Page 12 of 12 Issues (continued) Note: Arrows indicate trend (same, better, worse) by direction (right, up, down), and current impact (resolved/no issue, medium, severe) by color (green, yellow, red).  TitleIssueImpactActionStatus Instrument Development FUV detector QE enhancement grid breakage None to STScI short-term; delays integration of FUV flight detector; IDT delay in MOU deliverables, T-V, and SI delivery; additional long-term schedule impacts possible IDT investigation: review of qualification procedures and test data; secure new grid; revised test procedures; utilize ETU for optical bench fitting activities Investigation proceeding; 3 week delay to SI schedule and MOU deliverables (STScI T-V support development) (y)