Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, 20-21 July 2005.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
Tracker Summary Alan Bross MICE CM October 10, 2007.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Compressor status AWAKE Technical Board meeting 19 August 2015.
India-CMS Collaboration Meeting Chandigarh, 7-8 Oct 2004 Report to the Collaboration A. Gurtu.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, July 2007.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
T1 Electronic status Conclusions Electronics Cards:
ProtoDUNE Installation Workshop - DAQ
Mini-drawers, FE-ASIC , Integrator
G. Carboni for the Muon Group
10/month is the present production rate 2 FTE + sporadic contributions
ACS news Circulator TCU: control tests in progress All cavity racks
UK CMS Oversight Committee Mtg
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005

Progress  During March-2005 CMS week HO group was told about making cable layout plan  Fabio (Muon Group) presented tentative layout plans in March-2005 CMS week.  In April, HO team visited CERN for equipment training. During this visit, we presented new scheme for the same which was accepted and were asked to workout more details  Since then, P. Verma, mechanical engineer from TIFR, started implementing this scheme.  Mock-up of HO panel was made at TIFR to see the feasibility of the layout scheme.

Progress contd...  After rigorous interaction with the Integration group in last 3 months, layout scheme is more or less accepted for Ring-2 in full detail.  In view of the long delivery period of signal cables, it was important to finalize these lengths.  After laying actual signal cables (by HO group during July) on Ring-2 (Sector-6 & 8) as per the proposed layout design, actual lengths were compared with estimated lengths from ACAD design. After reasonable agreement between actual and estimated design length; the signal cable were finalized and order to be placed soon.  HV and Signal Cables have different path HV Cable on Sector-2 laid up to HV patch panel. Actual length agrees with ACAD estimations.

R-Φ view of Ring-2

Signal Cable Laid

Some more ….

Readout Box (RBX) Calibration  Length of calibration cables were re-evaluated by making a mock-up at TIFR. They were installed in RBX at CERN and certified to be OK  Calibration cables made for RING+2  To be made for Ring +1, 0, -1, -2  Cables to be sent to CERN and start testing RBX boxes ~ Sep.-2005

Status of Ring-1 layout scheme  Cables to be routed from readout side of Muon Detectors  More complications!  MAB problem for Ring ± 2 resolved completely, but it is more serious for Ring ±1 and not yet resolved  Proposed layout scheme is a combination of Fabio/HO proposal  Details being finalized

MAB Locations on YB1

3-D Model of the Overlap Region

Details of Overlap Region in Plan View

Installation of HO panels  4 (out of 12) HO panels in Ring+2 installed  From 19 th July another 6 will be mounted on Ring+2 and 10 on Ring+1  Vertical sectors (1 & 7) will be mounted in UX5.

Proposed Action Plans  Ring-0 layout scheme at preliminary stage  Ring 1 layout and installation plans to be finalized at TIFR/CERN  Source Run scheme to be finalized by Sep.2005 at TIFR  For new layout scheme of cables we need to make 1000 clamps at TIFR (CERN?)

Proposed Action Plans  Testing of RBX from Sep.2005  New DAQ to arrive in mid-august at CERN  Making HV and LT Box for Ring ±2 at CERN  Disconnect points for Ring ±1 at FNAL  RBX/Tray Cable installation Oct.2005 for Ring+2 at CERN  Light Leak/Calibration runs after installation in Oct.2005 at CERN  Source Runs Nov.-2005