Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.

Slides:



Advertisements
Similar presentations
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
Advertisements

The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan 1.Introduction 2.Recent.
1 A proposal of new simple system for testing a large number of MPPC for the R&D phase of GLD calorimeter 2007/Feb/6 ACFA ILC Workshop ICEPP, University.
Beam Test Plans at the KEK Fuji Beam line (as of Nov ) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.
Setup of Gain Monitoring System with Mr. Uozumi Kobe Univ. Hiroko Ikeda 18,May 2007.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Report from CALICE Beam Test 2 nd DAQ taking period and Plan for 3 rd DAQ period S. Uozumi Jul ScECAL meeting.
Study of the MPPC performance - R&D status for the GLD calorimeter readout – Nov 6-10.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
Dec LED monitoring system Beam-test LED monitor Jan /23/200 7 K.Toyama, H.Ono Niigata University, MSU-IIT GLD-CAL.
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group May 29 – Jun 4 DESY Introduction.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Scintillator-based ILC detector R & D Status and Milestone DongHee Kim Kyungpook National University Joint Korea-Japan Collaboration KPS meeting, Spring.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
KEK BT Summary &Plan Shinshu University Miho Nishiyama.
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) Feb Beijing Introduction Basic performances Future.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
1 Japan-US Research Budget 2007 & SciBooNE Upgrade T. Nakaya (Kyoto) SciBooNE 16, 2007.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Jet Energy Measurement at ILC Separation of jet particles in the calorimeter is required for the PFA  Fine granular calorimeter is necessary. Particle.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
Beam Test Plans at the KEK Fuji Beam line (as of Nov ) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
Short Summary of the Japan- Korea KNU Oct GLDCAL meeting S. Uozumi (Shinshu) 3 rd Japan-Korea joint meeting is held on Oct at Kyunpook.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
Study and Development of the Multi-Pixel Photon Counter for the GLD Calorimeter Satoru Uozumi (Shinshu, Japan) on behalf of the GLD Calorimeter Group Oct-9.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Performance of 1600-pixel MPPC for the GLD Calorimeter Readout Jan. 30(Tue.) Korea-Japan Joint Shinshu Univ. Takashi Maeda ( Univ. of Tsukuba)
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
Preparation for CERN test beam
ScECAL+AHCAL+TCMT Combined Beam FNAL
MEG II実験 液体キセノン検出器の建設状況
Presentation transcript:

Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi (Shinshu) Jan GLDCAL meeting

Quick Report on the MPPC Mass Measurement MPPCs The 400 MPPCs had been arrived on Dec Measurement was started immediately and finished at night on Dec-31. Measure 14 MPPCs at once, one measurement took ~50 minutes 38 measurements performed including some re-measurements. 50 min. x 38 = 32 hours in total T. Tsubokawa worked on it very hard! Treating large number of tiny MPPCs was quite a job … Quick check of the data was done during the measurement. Analysis is still ongoing…

Very preliminary results of 400 MPPCs Breakdown Voltage, Pixel capacity Mean : V RMS : 0.35 V RMS / Mean ~ 6 % These results still contain some systematics coming from no good fits.

Very Preliminary results of 400 MPPCs Comparison with HPK data sheet RMS / Mean ~ 0.1 % 0 V op = bias Gain = 2.75 x 10 5 is given by Hamamatsu. Our result is consistent with the HPK data sheet (even though our result still contains some systematics.)

Plan for the next 600 MPPCs 351 of next 600 MPPCs will be soldered to FPCB before the mass measurement. –No need for baking again –Easier to treat Current mass measurement system can be easily modified to the FPCB connector. With this modification, number of MPPCs per a measurement will be reduced from 14 to 9. –But we do not need very careful treatment of the individual MPPC, so we may save some time.

1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC baking and soldering WLSF megastrip source scan ACFA Shipping Feb-14 Beam DESY Feb 25 ~ Mar 29 Test assembly Install LED/Temp. monitor system Prepare shipping Ship MPPCs to KNU MPPC mass check. MPPC soldering Direct-readout megastrip source scan Install LED Delivery of 500 MPPCs Megastrip assembly Fabrication of megastrip layer components Megastrip bench test Prepare MPPC mass check system KEK Megastrip bench test Fabrication of Frame / light shielding structure Finalize module design MPPC study (response curve) Contact DESY (DC gas, safety issue, etc) Schedule toward the SC-ECAL Beam DESY Establish LED / Temperature monitoring system Analysis code / Event display Prepare Trigger / Veto counters ?

Beam Test Participants Satoru Uozumi (Feb 25 – Mar 29) Saori Ito (Feb 25 – Mar 29) Daniel Jeans (Feb 25 – Mar ??) Tamaki Yoshioka (Feb 25 – Mar 10?) Tohru Takeshita (Mar ?? - ??) Kiyotomo Kawagoe (Mar ?? - ??) Two(?) KNU guys (Feb 25 – Mar 29 ?) Benjamin Lutz, Erika Garutti (DESY contacts)

Beam Test DAQ ace Online data monitoring (check pedestal, dead channel, etc) Data analysis software / ntuplization / event display Drift chamber operation and analysis MIP calibration analysis Gain calculation (MPPC and electronics inter-calibration) MPPC response correction Quick result of energy spectra / resolution Temperature / LED monitoring data, correction MPPC dose test Any others? For BT participants : Please consider what you will do, and start to prepare for it !

What we will bring to DESY? ECAL module system, LED / temp. monitoring systems Trigger / veto counters, HV supplies Powerful PC with large storage (need to purchase?) Laptops with X-window system (Does everyone have it?) Oscilloscope, probes Testers Source-meter, HPK amp ? Cables, connectors, test boards CAMAC system (crate controller / interface) ? Tools (drivers, nippers, pliers, cutters, etc….) I will make more detailed list soon. Tell me if you need to put more items.

Trigger and Veto counters We would like to bring our own trigger counter, because the triggers currently at the beam line is too small for defocused beams. Does someone know where are the trigger and veto counters used in 2003 DESY beam test ? We could not find them in Fuji B4. Otherwise we have to make it. Moreover we need to flip the polarization of PMT signal. (AHCAL electronics accepts only positive signal for trigger counters) Do you have a module to flip the polarization?

Summary The BT preparation is going well, but we do not have much room on schedule –1 st stage of MPPC mass measurement has been done, deeper analysis will be performed soon The most busy part will come very soon –Megastrip assembly, source scan –Frame construction test –2 nd stage of the MPPC mass check Could everyone come Shinshu to help us? I would like to propose to have a face-to-face meeting with all the BT participants before the beam test. –Need detailed discussion about the schedule, jobs, plans and shipping items –Just after Japan-Korea meeting would be a good chance?