G. Dissertori ETHZ CMS Electronics 2002 1 ECAL DCS Software Planning G. Dissertori ETHZ 6.11.2002.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
CBM slow controls CBM collaboration meeting DAQ work group CBM collaboration meeting DAQ work group Burkhard Kolb GSI1.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 July 19, 2005German Martinez – SX5 Meeting RBX Temperature Monitoring Proposal German Martinez.
18/05/2005Kamil Sedlak1 ATLAS Data Acquisition and Controls DAQ … data characterised by event and run number. DCS … data characterised by (valid for) some.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Overview of the DCS Systems J. Varela, May 6th 2004 Electronics Week – DCS Review.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
PVSS SOAP Interface RCMS  DCS XDAQ  DCS (anyclient  PVSS) Peter Rosinsky, CERN PH/CMD CMS week 15-19/3/2004.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
G. Dissertori ETH Zürich ECAL Cooling Review - DCS 1 ECAL Detector Control System G. Dissertori ECAL Cooling Review, Nov 4, 2004 Status report.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
G. Dissertori ETH Zürich ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Tales and mysteries of PVSS in the land of ECAL Alison Lister ETHZ Alison Lister
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
Dave Barney, CERN. Tracking Tools: Introduction  Main Purpose: to keep track of all incidents & interventions at point 5  Interlocks – reasons & follow-up.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
FPix DCS Subgroup Report
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
CMS-ECAL DCS Prototype
The LHCb Run Control System
RPC Detector Control System
TPC Detector Control System
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS HVLVTSSCooling TEMP. + HUMID. Monit. ALARMS LASERXDAQ Framework

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS  had a meeting yesterday (HV, LV, TSS, F. Glege)  for mid-2003 (SM0) : first prototype of DCS software system in PVSS  should include HV, LV, Temp.Monit., TSS, Cooling?, Framework with FSM, Partitioning, communication with XDAQ and ECAL DAQ?  test of this prototype during 2003  beg. 2004: production setup for the SM calibration at H4  during 2004, probably all resources needed for calibration  beg. 2005: first tests of a setup for full ECAL (maybe start with reduced size)  may have to find a location to do such a test  from mid 2005 on : install equipment and start testing of the full system  beg : full system ready Planning: Software

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS  up to end-2003 : subprojects software covered by responsible groups, framework covered, but I guess with substantial help/input needed (from Frank, I guess)  end : have to shift manpower (1 person) to framework, probably from TSS and Temp. monitoring  in : would like to get help for the test and integration of full system, also for the interfacing with the DAQ : 1 person (0.5 FTE ?) Planning: Manpower

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS  we think it would be extremely helpful/important to have remote access to PVSS (via WEB)  particularly for safety system, Alarm subpanel  for all platforms  some good interface to histogramming package, eg. ROOT  concentrate on EB+EE at the moment. But must not forget SE! Wishes/ Request / AOB

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS HV issues they use CAEN PS. Supported by JCOP. modules start to be produced now, start arriving end to be decided: how much testing done in Rome and at CERN Rome group will develop the HV PVSS application prototype should be ready for SM0 they will have Labview as backup

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS LV issues exact system not yet defined ( in terms of hardware ) planned to use DCUs (CCUs) to control the LVRs therefore: will use XDAQ therefore : will need PVSS - XDAQ interface hopefully a very first prototype ready for SM0

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS TSS issues a first prototype already used in 2002 (M0’) the TSS (Belgrade) group will build the application should be ready for SM0 need good communication with DAQ, in order to get information from sensors integrated in PCBs needs communication with cooling and overall CMS DSS hardware integration : prototype for SM0, final solution for 2004 during calibration. ECAL : start in 2005.

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Temp. Monit. issues a first prototype already used in 2002 (M0’) the Protvino group (together with ETHZ) will build the application should be ready for SM0 needs communication with cooling (feedback) integration: similar to TSS

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Cooling issues are going to start discussion with them (Frank, Andromaki, GD,...) I think at the moment they use Labview

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Laser issues I have to contact them most probably, they will have their own software but at least we need software communication with the Laser system in order to know hardware status

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS XDAQ issues first tests for communication ECAL PVSS - XDAQ first half of 2003 so hopefully ready for SM0

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS FRAMEWORK issues A. Lister (ETHZ) just started to work on it hopefully first prototype ready for SM0 with FSM, partitioning, alarm handling, XDAQ interface... Note : planned that Alison leaves for CDF end 2003 (for some time). See man power issues....