SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

Early Results from the COS Time-Dependent Spectroscopic Sensitivity Programs Rachel Osten TIPS presentation, Jan. 21, 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Spectral Characterization of calibration lamps: STIS An improved list of emission lines for STIS Calibration Enhancement Florian Kerber, ST-ECF TIPS Meeting.
Post-SM4 Sensitivity Calibration of the STIS Echelle Modes Azalee Bostroem With help from: Ralph Bohlin, Alessandra Aloisi, Charles Proffitt, Kenneth Hart,
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
Initial Alignment Check / Calibration in Vacuum Dennis Ebbets With substantial contributions from Tom Delker, Erik Wilkinson, Steve Osterman, Ken Brownsberger,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
The SINGS SED Tool Daniela Calzetti (STScI) June 10 th, 2002 SSC Deliverable  SSC Deliverable – IDL Image Analysis Software to provide: o PSF-matched,
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Outline of CALCOS Processing Steps and Keywords Reference Files Associations.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 18 January 2007.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
STIS Closeout Plan Paul Goudfrooij Space Telescope Users Committee, 11/18/2004.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review July 2001.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
The Status of HST/COS and HST/STIS Cristina Oliveira 8/12/14COS and STIS Cal Workshop1 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA.
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review CALCOS Requirements Philip E Hodge 14 December 2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
Single Object & Time Series Spectroscopy with JWST NIRCam
COS FUV Flat Fields and Signal-to-Noise Characteristics
STScI Ground System Development Status:
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002

TIPS: COS Status - Keyes - 17 January 2002 Slide 2 of 14 Agenda   Overview – – Personnel – – Schedule   Instrument Activities and Status   STScI Ground System Activities – – “Back-end” (Pipeline, Archive) – – “Front-end” (Scheduling System) – – User Support

TIPS: COS Status - Keyes - 17 January 2002 Slide 3 of 14 COS Overview   Personnel – – Ralph Bohlin > > acting Head - NISD – – Claus Leitherer > > new COS Instrument Scientist (effective 1 Feb 2002) – – Ron Pitts > > new COS Systems Engineer for Commanding – – Dean Zak (Systems Engineering - Commanding) > > leaving COS, January 2002

TIPS: COS Status - Keyes - 17 January 2002 Slide 4 of 14 Overview   Detector Status – – FUV flight detector now in detector Thermal-Vac at CU > > deliver to Ball next week > > flight spare detector (FUV02) integration at UCB – – NUV flight detector on the shelf at Ball   COS Mini-Handbook: June 2002 (Ken Sembach, lead)   SI Environmental (Thermal-Vac): fall 2002   SI delivery to GSFC: Nov 2002   Launch: January 2004 – – SM4 – – replace COSTAR

TIPS: COS Status - Keyes - 17 January 2002 Slide 5 of 14 COS Instrument Activities   SI News: – – backup FUV door-opening mechanism repair installed, vibration tests successfully completed, final T-V tests in progress this week – – MEB functional tests by 1 Feb > > dry run successful > > FUV and NUV detector test images in internal header format (per DM-06) delivered to STScI; establish proper detector orientation; key MOU deliverable facilitates OPUS development – – Initial FUV focus alignment successfully performed at Ball with flight detector and gratings (R=20,000 spec demonstrated)

TIPS: COS Status - Keyes - 17 January 2002 Slide 6 of 14  FUV Alignment Test Data --- graphic courtesy of COS IDT

TIPS: COS Status - Keyes - 17 January 2002 Slide 7 of 14 FUV Extracted Spectrum --- graphic courtesy of COS IDT

TIPS: COS Status - Keyes - 17 January 2002 Slide 8 of 14 FUV Focus and Resolution Test --- graphic courtesy of COS IDT

TIPS: COS Status - Keyes - 17 January 2002 Slide 9 of 14 NUV Grating Status   NUV M mode (R=20000) grating reflectivity; recovery plan nearing completion – – G185M AlMgF coated optics delivered throughput below spec; G225Ma AlMgF will be used as flight optic – throughput exceeds spec; increased spectral range; possible lower resolution – – G225M AlMgF coated optics below spec; bare Al coated G225M samples exceed spec; flight-candidate G225Mc optics in test at GSFC > > mechanically-ruled alternate (Hitachi) procurement terminated – – G285M AlMgF coated optics delivered throughput below spec; G225Mb AlMgF coated is present flight optic – throughput exceeds spec; slightly decreased spectral range; higher resolution; bare Al coated G285M tests are even better; flight-candidate awaiting tests at GSFC   Flight-accepted G230L grating and TA1 MIRROR meet specification

TIPS: COS Status - Keyes - 17 January 2002 Slide 10 of 14 COS Pipeline and Calibration Systems   OPUS/HDA and calcos Critical Design Reviews – – 12 Requests for Action – no significant modifications to design – – Evaluated responses to all OPUS/HDA and calcos CDR RFAs; revisions in progress; final closure document in preparation – – All presentations and RFAs online at   Keyword Issues and Thermal–Vac Pipeline – – Established COS TV-specific keyword requirements and schedule – – Produced first ICD-19 working draft of COS pipeline output file headers and keywords

TIPS: COS Status - Keyes - 17 January 2002 Slide 11 of 14 COS Ground System: “Front-end”   STScI Integrated Scheduling System Development – – STScI FSW macro-timing tests on ops bench - 70% complete – – Phase 4 development on schedule > > ALIGNment modes (Focus, Aperture, Optical Select Mechanism) completed and tested at STScI > > FP-SPLIT testing nearing completion – – Phase 5 development on schedule > > GO WAVECAL exposures in requirements definition – – Ops bench testing of STScI commanding will occur per Ball FSW availability timeline

TIPS: COS Status - Keyes - 17 January 2002 Slide 12 of 14 COS User Support Development   STScI Exposure Time Calculator (JAVA-based) – – Standard component of Astronomer Proposal Tools (APT) – – Incorporates IDT ETC, STIS ETC, and FUSE ETC design elements – – Detailed ETC requirements delivered to APT working group – – Development this semester – – IDT ETC URL:   COS Mini-Handbook – – development underway - K. Sembach, lead – – component of Cycle 12 Call for Proposals - June 2002

TIPS: COS Status - Keyes - 17 January 2002 Slide 13 of 14 COS Phase Development Plan (Rev 6, 10/26/01) Phase 1 (1/1/00 – 6/30/00) vMacro Development vReconfigurations Phase 2 (7/1/00 – 12/31/00) vNUV Timetag Mode + Darks vFUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) vFUV & NUV Accumulation Science Exposures vFUV & NUV Target Acquisition Exposures vFUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) vAperture Alignment Exposures vOSM1 Focus Alignment Exposures vOSM1 Rotation Alignment Exposures vOSM2 Rotation Alignment Exposures vFUV & NUV FP Split Exposures Phase 5 (1/1/02 – 6/30/02) vFUV & NUV GO Wavelength Calibration Exposures vFUV & NUV Flat Field Lamp Calibration Exposures vFUV & NUV Automatic Wavelength Calibration Exposures vSAA Contours Phase 6 (7/1/02 – 12/31/02) vSMGT Preparations vSMOV Special Commanding vFUV & NUV Anomalous Recovery vFUV & NUV Initial Turn-on vFUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) vFUV & NUV Lifetime Adjustments vCoordinated Parallels

TIPS: COS Status - Keyes - 17 January 2002 Slide 14 of 14 Detailed Schedule