1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.

Slides:



Advertisements
Similar presentations
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
Advertisements

8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
SAR Overview Business Case Review Logical SARPhysical SAR Implementation Review 1.
on Congestion Management (IG)
Individul Project: NPD-NET Component 4: Integration and Regional Adaptation of NPD Roadmap Kick-off meeting Region of Central Macedonia – URENIO Research.
Regular process for global reporting and assessment of the state of the marine environment, including socio-economic aspects Taking forward Global Oceans.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
The Design Process. Analysis Think – what should the final design do? List customer requirements Consider constraints – balance tradeoffs Define specifications.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Chapter 4 Preliminary Investigation Project triggers Business process redesign (BPR) Strategic planning The preliminary investigation stage Gathering information.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
IS&T Project Management: Project Management 101 June, 2006.
TRAINING SOLUTIONS RISK ASSESSMENT For more information contact Victoria: (Tel) (Fax) ( )
Canberra ACT Exercise Management Course PLAN the EXERCISE (Pt 2) PLANNING TEAM.
Roadmap and Funding Opportunities Ana Goicoechea Istanbul, May 14, 2015.
Rapid mapping/inventory of UN human and financial resources devoted to support the response to HIV and AIDS in {insert country name} Overview of the Process.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
1 The Initial Report Preparation Guidelines. 2 The Initial Report u Definition of project scope u Project aims and objectives u Initial project plan.
PCR Status report AESAG, September Supported by:
Exit and sustainability of the Swiss development cooperation Martin Baumann Competence Center 6: Performance Audit and Evaluation Swiss Federal Audit Office.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
7 June 2012 Guidelines for the Compilation of Water Accounts and Statistics Guidelines for the Compilation of Water Accounts and Statistics UN Statistics.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
Planning and Community Development Department Housing Element City Council February 03, 2014.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
WG FBA report Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 13 February 2009.
PHASING EXPERIENCE ERIKA SALTARELLI DEPARTMENT FOR DEVELOPMENT POLICY AND METHODOLOGY CO- ORDINATION BUDAPEST 16TH JUNE 2014.
APEC-TEL Broadband Study TEL03/2009A – status report Bangkok, May 20 th.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
242/102/49 0/51/59 181/172/166 Primary colors 248/152/29 PMS 172 PMS 137 PMS 546 PMS /206/ /227/ /129/123 Secondary colors 114/181/204.
STATUS REPORT OF THE COMMON CENSUS FRAMEWORK FUNDED BY THE INTER-AMERICAN DEVELOPMENT BANK (IDB) AND THE UNITED NATIONS POPULATION FUNDS (UNFPA) Project.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
REPORT TO GRPE 66 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (66 th GRPE, June 2013, agenda.
Kick of WP3 Steps towards building Oxford, first project meeting :30 am – 11:15 am.
Project Management Methodology
Regional Workshop to disseminate Water Supply and Sanitation Standards of Service, adapted to LDCs Préparation to the ISO TC 224 Drafts Standards test.
A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Update on Chesapeake Bay Program Developments Briefing to the Water Resources Technical Committee October 9, 2009 (revised) Briefing to the Water Resources.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Project Management Processes for a Project
T-MPLS Update IETF71 March 2008 Stewart Bryant
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
ITIL Project Change Management Workshop 7 February 2007
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
WG FBA Status Report Jerzy Dudzik IG Meeting, 12 th June 2007.
Project Execution Methodology
Systems Analysis and Design in a Changing World, 4th Edition
Supported by: PCR Status report AESAG, September
BANKING INFORMATION SYSTEMS
Chapter 1 : Introduction to Auditing
FINAL REPORT TECHNICAL WRITING NOOR SHAHARIAH BT SALEH
Supported by: PCR Status report AESAG, September
DG Environment, Unit D.2 Marine Environment and Water Industry
ETS Working Group, 5-6th June 2012
The Design Process.
Performance Audit Subcommittee Project for ISSAI Level 4 review 66th INTOSAI Governing Board Meeting Vienna, November 5-7, 2014.
Reference Manual update Item 6.2 of the agenda
Common Understanding Way forward
Presentation transcript:

1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008

2 Presentation outline  HLM resolution toward the Concept – draft  State of work within WG FBA

3 HLM resolution toward the concept – draft* (1)  The commonly agreed definitions:  Concept of the technical parameters; status as provided in Consentec document »Concept of the Technical Parameters Calculation for the Flow Based Capacity Allocation in the CEE Region«, dated 21 Dec.,  The Concept; as to be implemented in CAO, it comprises all technical parameters (AMF, PTDF, FRM, BFRM…) needed for FBA, allocation and curtailment methodologies, scheduling etc. *Ad hoc High Level Meeting

4 HLM resolution toward the concept - draft (2)  The roadmap for the Concept implementation is a step-by-step one, consisting of a chain of HLM approvals that refer to WG proposals, prepared on the base of the Consentec final Work Package reports. The final step for the Concept is a confirmation by HLM which is to be done before functional application. The IT implementation roadmap could be asynchronous to the Concept step-by-step implementation because of different deadlines where IT Function Specification has to be approved before contracting the IT vendor.

5  State of work within WG FBA (1) WP 1  Main phase with the data gathering process started on and will be finished today,  Preliminary results from calculations raised some issues regarding long-term allocations. Solutions are under investigation and discussion  Open Issues to be clarified hopefully by the deadline of WP1

6 State of work within WG FBA (2) State of work within WG FBA (2)  Curtailment considered as an integrated part of the FBA concept  One of modules of WP 3 will include curtailment evaluation  First resolutions by WG FBA on Concept possible during the meeting on 8.7. after receiving final report on WP 1&2 from Consentec (end of June)  Most possibly the recommendation for the Concept confirmation will be given after evaluation of tests’ results where influences of all agreed and not agreed issues could be ascertained.  Risk of WG FBA failing to answer open questions in time

7  State of work within WG FBA (3)

8 Thank you for your attention!