Back End FPGA Front End FPGA HV control & monitoring DACs and ADCs DCS server 6 * (pmt, 3in1, ADC) Trigger, DAQ Arrow thickness indicates bandwidth HV.

Slides:



Advertisements
Similar presentations
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Advertisements

Oscilloscope Watch Teardown. Agenda History and General overview Hardware design: – Block diagram and general overview – Choice of the microcontroller.
ESODAC Study for a new ESO Detector Array Controller.
VLV T – Workshop 2003 C. A. Nicolau – VLV T - Amsterdam 5-8 October 2003 A 200-MHz FPGA based PMT acquisition electronics for NEMO experiment Read Out.
Classification of Future Aeronautical Communication Signals Doris Bao, Department of Engineering, University of Sannio Pasquale Daponte, Department of.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
The Spartan 3e FPGA. CS/EE 3710 The Spartan 3e FPGA  What’s inside the chip? How does it implement random logic? What other features can you use?  What.
FPGAs and IRRADIATED FPGAs for the LHCb UPGRADE Bin Gui, Ray Mountain.
Presented by Karin Shusterman Another use of the JTAG Interface on FPGA.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | | Markus Keil.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
How the Web Works AGED How the Web Works Most people use an internet service provider (ISP) or an online service provider (OSP) like AOL to access.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
Understanding Data Acquisition System for N- XYTER.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
Design & test of SciFi FEB
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Module Interface Board (MIB) Design.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
VLVnT09A. Belias1 The on-shore DAQ system for a deep-sea neutrino telescope A.Belias NOA-NESTOR.
DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
ADC – FIR Filter – DAC KEVIN COOLEY. Overview  Components  Schematic  Hardware Design Considerations  Digital Filters/FPGA Design Tools  Questions.
Rev Server blade enclosure overview Power backplane Signal backplane Management module Reset Bottom.
MEG trigger system This short presentation describes the present status of the trigger algorithms of the MEG experiment implemented on the Xilinx FPGA.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
FLASH Collaboration Meeting: July 2003 Spectrograph Status Etc.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
PowerBench Programmable Power Supply Dror Lazar Moran Fishman Supervisor: Boaz Mizrahi Winter Semester 2009/10 HS DSL.
GBT-FPGA Interface Carson Teale. GBT New radiation tolerant ASIC for bidirectional 4.8 Gb/s optical links to replace current timing, trigger, and control.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
Radiation 4-5 December 2005 AB/BDI/BL.
29 May 2009 Henk Boterenbrood, Augusto Ceccucci, Bjorn Hallgren, Mauro Piccini and Helmut Wendler 1 The Calorimeter Recorder CARE.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
WPFL General Meeting, , Nikhef A. Belias1 Shore DAQ system - report on studies A.Belias NOA-NESTOR.
LHCb Outer Tracker Electronics 40MHz Upgrade
DAQ Requirements M. Villa 21/02/2011.
CALICE Readout Board Front End FPGA
Mapping area of the 36 PMT 9 PMT 9 PMT 9 PMT 9 PMT.
Upgrade activities at Clermont-Ferrand
Baby-Mind SiPM Front End Electronics
Front-end electronic system for large area photomultipliers readout
Combiner functionalities
Read Out and Data Transmission Working Group
BUCKEYE has internal shift register which controls calibration
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
LIU BWS Firmware status
Presentation transcript:

Back End FPGA Front End FPGA HV control & monitoring DACs and ADCs DCS server 6 * (pmt, 3in1, ADC) Trigger, DAQ Arrow thickness indicates bandwidth HV control is a slow controls system -- low bandwidth -- timing not critical (scale of seconds) HV control system overview Michigan State May 3, 2013 Slide 1/3

Back End FPGA Front End FPGA GBT Q-SFP? Dual port RAM Dual port RAM SPI engine ADC DAC HV control system: connectivity of front end and back end FPGAs Slide 2/3

SPI_Data_1 SPI_Data_2 SPI_Data_3 … SPI control SPI status SPI engine ADC DAC USA15 back end Dual port RAM TileCal front end Dual port RAM Dual port RAM is updated through fiber optic links The HV slow control process is low bandwidth and not timing-critical. One simple communication method is to uncouple the SPI engine and the updates of the dual-port RAM registers: (1) Dual port memories are mirrored through the fiber optic links. (2) Coordination could be performed through simple handshaking (signals such as Write_SPI and SPI_Busy) (3) SPI engine could be a relatively independent system inside FPGA (SPI engine essentially reduces to a remote-control shift register) HV control system: dual port RAM inside both FPGAs Slide 3/3 SPI_Data_1 SPI_Data_2 SPI_Data_3 … SPI control SPI status