1 RMS Training RMS BASICS July-2006. 2 Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.

Slides:



Advertisements
Similar presentations
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Managing a Successful Mechanical System project Following design – what next?
US Army Corps of Engineers RMS Center – Apple Valley, CA 1 RMS Overview May 2010.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Project Close Out CTC-470.
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
FI$Cal Change Discussion Guide Primavera Guide March 2015.
Purpose of the Induction Programme (1) The Next Step Induction Programme is intended to build your understanding of and knowledge about Next Step to: –Provide.
NASA Johnson Space Center Contracting Officer and Contracting Officer’s Technical Representative.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
RMS Overview July 2006.
Standards of Practice Course
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 RMS Training Sponsored by the RMS Center July 2006.
Software Quality Assurance Activities
 Journeyman  Management  Specialization  Teaching  Owning a business.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
CVE 4070 Construction Engineering Shop Drawings Quality Control
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
General Contractor Davon Woodard February 11, 2014 Career Tech.
1 RMS Training Sponsored by the RMS Center May 2010.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
US Army Corps of Engineers BUILDING STRONG ® Keys to a Successful Construction Contract Matthew D. Lowe, PE Chief, Reserve Section Louisville District.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Responsibility & Authority Module #2 Prepared by Dr. Randy R. Rapp July 2005.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
Transit Facility Development: Lessons Learned. Overview Vision Project Size & Scope Funding Approach Concept Design Project Delivery Validation Efforts.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
McDonough Bolyard Peck 1 CEFPI’s 81’st Annual International Conference PROJECT QUALITY MANAGEMENT by Edward M. Kopp and James Yatzeck.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Field Office Construction, Technical Assistance and Quality Assurance NEDC Construction Inspection for Field Office Activities USDA is an equal opportunity.
Project & Subcontract Management Issues By: Jean Marie Thiel, President /CEO Belonger Corporation Inc.
1 Introduction to MBProject. 2 Part I: MBProject and how it is used. Part II: What MBProject might do in the future. Also, as-built data collection and.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Contractor Mode Administration Tab Overview
Sponsored by the RMS Center
Designers’ Manual Overview and Chapter Contents
Contractor Mode Finances: Overview
QCS An Overview Savannah District Project Engineer 16 Nov 06
Lesson 1- Operations Management
Project Development Quality Program QA/QC – What does ODOT need?
Setting Up a New Contract
DOE Review of the LCLS Project October 2006
Presentation transcript:

1 RMS Training RMS BASICS July-2006

2 Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff assigned to the offices (names) 3. Set up Roles (by staff name, title, function, etc) 4. Assign staff to the roles 5. Create User Group (by office, area, function) 6. Assign contracts to User Group

3 Before you start RMS Who are you? What can you do? (Roles) What Contracts can you do it on?

4 Before you start RMS Who are you?

5 Before you start RMS What can you do? (Roles)

6 Before you start RMS What can you do? (Roles)

7 Before you start RMS What Contracts can you do it on? (User Groups – Assign Users)

8 Before you start RMS What Contracts can you do it on? (User Groups – Assign Roles)

9 Before you start RMS What Contracts can you do it on? (User Groups – Select Contracts)

10 Now, Start Using RMS SET UP NEW CONTRACTS ENTER CONTRACT DETAILS

11 RMS Contract Finances P2CEFMS SPS (PD²) CWECLINsACTIVITIESCHANGESMODSPAYMENTS

12 RMS Contract Tracking SUBMITTALSDOCUMENTS InsuranceInsurance PayrollsPayrolls Labor InterviewsLabor InterviewsSCHEDULES NAS NAS GANTT GANTTCORRESPONDENCE DEFICIENCIES FINANCES

13 RMS Quality Control DAILY QC REPORTS CONTRACTOR DATA DATA EXCHANGE SDEF SDEF SPECSINTACT SPECSINTACT PAYMENT DATA PAYMENT DATA RFI’S RFI’S

14 RMS Quality Assurance DAILY QA REPORTS GOVERNMENT DATA DATA EXCHANGE SDEF SDEF SPECSINTACT SPECSINTACT PAYMENT DATA PAYMENT DATA RFI’S RFI’S Warranty Items Warranty Items

15 RMS Overview RMS Knows: WHOWHATWHENWHEREHOW Why? Because it’s in the Contract!

16 Activity Submittals QC/QA Tests Installed Property Transfer Property User Schooling QA/QC Punchlist Item Contractor/ Subcontractor Insurances WHO WHAT WHEN Start Date Finish Date WHERE Contract Phase Construction Area SF1413 Payrolls Activity Is Primary Link All these items have value assigned, can withhold payment. }

17 Activity Submittals QC/QA Tests Installed Property Transfer Property User Schooling QA/QC Punchlist Contractor/ Subcontractor Insurances WHO WHAT WHEN Start Date Finish Date WHERE Contract Phase Construction Area HOW 3 Phase Checks Rep Deficiencies Tech Notes SF1413 Payrolls Plans Specs Safety Issues Gov’t Provides Key Information

18 Construction Lessons Learned Preparatory Inspection Drawings and Specifications Repetitive Deficiencies Inspection Checks Job Site Safety Issues QA Evaluation Initial Inspection Inspection Checks Job Site Safety Issues QA Evaluation Final Follow-Up Inspection Inspection Checks QA Evaluation Success depends on the right information being delivered at the correct time and being coordinated with the Contractors’ work in progress.

19 Construction Lessons Learned Repetitive Deficiencies Safety Elements & Concerns Environmental Considerations Engineering Instructions

20 Corporate Knowledge Must Be Shared With Our Contractors Subject Matter Experts (SME) For Each CSI Division For Each Specification Section For Each Engineering Discipline These are Volunteers Seattle District has lead for this.

21 RMS Contract Closeout CLOSEOUT EVENTSCLOSEOUT EVENTS TRANSFER TRANSFER PROPERTY PROPERTY INSTALLED INSTALLED PROPERTY PROPERTY SUBMITTAL SUBMITTAL TRANSFER TRANSFER CONTRACTOR CONTRACTOR EVALUATION EVALUATION

22 RMS Contract Closeout Questions ?