26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

Slides:



Advertisements
Similar presentations
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
Progress report Collaboration meeting 23-SEP-2009
Status of NA62 straw electronics Webs Covers Services Readout.
NIKHEF B-field monitors Paul Balm November 11 th, 1999.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Aristotle University of Thessaloniki QC – QA readiness at AUTh tooling and procedures D. Sampsonidis, P. Charalampous, S. Kompogiannis, and C. Lampoudis.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
S.Movchan Straw manufacturing and QC
We started last December: 32 channels prototype “Julich like” to:
new straw end plug: D=10.6 mm straws support frame Levan option
S.Movchan Straw manufacturing and QC
HF Test station at P5 A.Mestvirishvili.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
S.Movchan Straw manufacturing and QC
Status of straw production straw module assembling
T1 status (a selection from EDR presentations)
Mini-drawers, FE-ASIC , Integrator
Preparations for test of
WELCOME.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan

26-Feb-16S.Movchan Straw manufacturing and QC2 Bld. 217: common view Module entrance

26-Feb-16S.Movchan Straw manufacturing and QC3 Bld. 217 Staff entrance Gate in front of straw module assembly area

26-Feb-16S.Movchan Straw manufacturing and QC4 Straw module 3 assembly halls Assembly area 1 Assembly area 2 Vacuum test Wiring Connectivity Gas tightness HV test Cosmic test Frame assembly

26-Feb-16S.Movchan Straw manufacturing and QC5 Hall and 2 rooms: common view Total: ~ 250 m2

26-Feb-16S.Movchan Straw manufacturing and QC6 Main hall Crane: 1.0 tone height ~ 4.5 m S ~ 150 m2 ( 9 x 16.6 m) Condition system

26-Feb-16S.Movchan Straw manufacturing and QC7 Module Vacuum tests area S ~ 40 m2 ( 5 x 8 m) Entrance gate 3x2 m

26-Feb-16S.Movchan Straw manufacturing and QC8 Straw module assembly area S ~ 40 m2 ( 5 x 8 m)

26-Feb-16S.Movchan Straw manufacturing and QC9 Rooms 2 (wiring and cosmic test) S ~ 50 m2 ( 5.4 x 9 m) S ~ 50 m2 ( 5.4 x 9 m)

26-Feb-16S.Movchan Straw manufacturing and QC10 Plans Tooling: module assembly tooling – in manufacture (Dubna, VEMZ, August) vacuum table – order in progress Module: module mechanics manufacture – August 2011, Italy ???? delivery to Dubna - September 2011 ???? Assembly: vacuum stand assembly and tests – August 2011 install module assembly tooling – September 2011 Straws: manufacture about 1000 pc and long term test – July-August 2011 Straw assembly to module: start – October (November) 2011

26-Feb-16S.Movchan Straw manufacturing and QC11 Conclusion Dubna NA62 straw modules assembly 3 halls (S ~ 250 m2) – ready Module assembly tooling – in manufacture Vacuum pump and pressure sensors – ok! Vacuum table – will be ordered NEXT steps will be fixed on the July collaboration meeting at CERN Other ????? Straws manufacture (no tape at Dubna) Final module drawings – NO alignment/reference holes in the existing drawings Order module mechanics manufacture at Italy – date and quantity, cost ? Delivery module mechanics to Dubna (by track ?) Module glue procedure (Francisco) Device for actual straw position measurement (like at CERN or …?) Straw glue procedure finalization – August 2011 ? Materials and components: wire, pins, glue, straws supports o-rings, bushes, WEBs, gas manifolds, cowers with front end boards, … Equipment: epoxy dispenser (2-3 pc), crimpers, wiring machine, DAQ, LV, HV, gas rack, …

26-Feb-16S.Movchan Straw manufacturing and QC12 aaa