CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.

Slides:



Advertisements
Similar presentations
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Advertisements

Working Group 1: Microwave Acceleration Summary 10 July 2009.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Is there synergy between ILC and SuperB? Steve Playfer University of Edinburgh.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
A. Yamamoto, N. Walker, and M. Ross, ILC-GDE Project Managers S. Stapnes, CERN LC Studies Leader LCWS12 - Opening Accelerator Plenary, , 18:00.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Workshop Goals Marc Ross LC May, 2013 Accelerator Plenary.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
1 Tunnel implementations (laser straight) Central Injector complex.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Considerations for the CDR and Strategy Update The current CDR planning focuses on 3 TeV and a downscaled not optimised 500 GeV machine, aiming for completion.
EU projects Four Marie Curie Networks being prepared with relevance for CLIC: – Structures and modules (lead: Helsinki) – RF power sources (lead: Lancaster)
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Introdcution to Workpackage/Activity Reflection D. Schulte.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CLIC Organogram CLIC Collab. Board L.Rivkin MoU with annexes describing coll. efforts (note: in reality more complicated) CLIC SC (Stapnes) Repr. from.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria November 21, 2013RECFA CERN1.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Memorandum of Cooperation for the CLIC detector and physics study Lucie Linssen Monthly meeting 19/11/
News and updates CLIC review and follow up: view?fr=no&detailLevel=contribution&view=standard&showS ession=all&showDate=all.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
CLIC work program and milestones
LCC L. Evans, Santander, 2nd June 2016
CDR The CLIC CDR is now completed. The three volumes can be found as follows:      Volume 1:       Volume 2: 
Input to Strategy currently planned
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
Introduction to the Workshop
Collaboration New collaborators in 2016:
Report by Steinar Stapnes
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
CLIC/ILC Collaboration Meeting: Objectives & Organization
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis for input to the European Strategy discussions Volume 1: The CLIC accelerator studies ( – Feasibility studies and Performance studies for the accelerator implementation; demonstrations of drive beam performance, two beam acceleration, breakdown and gradient of RF components, luminosity performance (emittances, alignment and stability), CE and site – Key measurements in CTF3, structure development and testing in KEK and SLAC (CERN test- stand also becoming operational), FACET at SLAC and in many technical setups and smaller tests Volume 2: CLIC detector and physics studies ( – Demonstrating excellent physics performance in the CLIC beam and timing environment Volume 3: Project implementation studies ( – Including timelines, schedules, a complete costing, power estimates and describing a possible staged implementation A complete workplan has been defined and is underway for : – Goal: Project Implementation Plan ready in parallel with results from LHC at full energy (providing a possible option for a machine at CERN after LHC). – The programme combines the resources of collaborators inside the current collaboration (44 institutes with CERN as backbone), plus several new ones now joining. – Focus remains on technical and industrial developments and associated systems tests, a revised staging scenario with re-optimised initial phases, increased focus on common developments with other users of high gradient technologies (medical acc., XFELs, etc), cost and power reduction. The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis for input to the European Strategy discussions Volume 1: The CLIC accelerator studies ( – Feasibility studies and Performance studies for the accelerator implementation; demonstrations of drive beam performance, two beam acceleration, breakdown and gradient of RF components, luminosity performance (emittances, alignment and stability), CE and site – Key measurements in CTF3, structure development and testing in KEK and SLAC (CERN test- stand also becoming operational), FACET at SLAC and in many technical setups and smaller tests Volume 2: CLIC detector and physics studies ( – Demonstrating excellent physics performance in the CLIC beam and timing environment Volume 3: Project implementation studies ( – Including timelines, schedules, a complete costing, power estimates and describing a possible staged implementation A complete workplan has been defined and is underway for : – Goal: Project Implementation Plan ready in parallel with results from LHC at full energy (providing a possible option for a machine at CERN after LHC). – The programme combines the resources of collaborators inside the current collaboration (44 institutes with CERN as backbone), plus several new ones now joining. – Focus remains on technical and industrial developments and associated systems tests, a revised staging scenario with re-optimised initial phases, increased focus on common developments with other users of high gradient technologies (medical acc., XFELs, etc), cost and power reduction. 1 Dear all, In order to get a printed copy of the report “"A Multi-TeV Linear Collider based on CLIC technology" (CERN report ), I remind you that you should fill in, before 20 December, the form available here: With kind regards, Alexia 2013: Workplan for well underway – most activities started. CLIC workshop in January important. Resource situation: as foreseen in 2011 when planning started Pressure at CERN from LHC (ultimately higher priority) and other ideas (priorities not always defined), difficulties for both material and personnel For collaborators also difficult in many cases to find local support to participate in a satisfactory way Important to have continued R&D support in European Strategy Important to continue to build collaborations between groups inside the CLIC project and towards users of similar technologies

Collaborators: Signed new members: The Hebrew University-Jerusalem (Israel-new) Vinca Institute Belgrade (Serbia) In preparation: Tartu (Estonia-new), Alba (Spain), Sandia National Lab (US), METAS (Switzerland) KVI Groeningen (the Netherlands) – not clear Numerous updates and changes …. 2

LC organisation 3 Deputy (Physics) LCB European Members confirmed in PECFA – CERN DG, Dubna DG, DESY ReDir, LeDiberder and Rivkin Detector and Physics not converged

Future LC objectives Strongly support the Japanese initiative to construct a linear collider as a staged project in Japan Prepare CLIC machine and detectors as an option for a future high-energy linear collider at CERN Further improve collaboration between CLIC and ILC machine experts Move towards a “more normal” structure of collaboration in the detector community to prepare for the construction of two high-performance detectors Question: Can this work (physics, resources, timescales, community, as roadmap) and be done coherently ? Lyn Evans 22-Oct-12 LCWS12 - Arlington, TX 4

Many common problems and solutions even though the basic core acceleration methods differ, and the parameters to be achieved by the systems below differ – in some cases leading to different solutions In addition common working groups on: Cost and Schedule, Civil Engineering and Conventional Facilities – and a General Issues Working Group Three general actions: Move (for some of these groups) towards more genuine combined working group in order to optimize resources and maximize exchange of experiences Further development of common work in the area of Detector and Physics Increased help across the borders of ILC/CLIC wrt implementation planning for the two projects – inside a common overall organization LC common studies Sources (common working group on positron generation) Damping rings Beam dynamics (covers along entire machine) Beam delivery systems Machine Detector Interfaces Physics and detectors 5

Japanese Sites -GDE-CFS group visited two sites, Oct., GDE EC visit in Jan B. Foster - PECFA CERN - 11/12 Global Design Effort 6

B. Foster - PECFA CERN - 11/12 Global Design Effort 7 A. Suzuki – IEEE 11/12

Y. Okada - CPM12 Fermilab B. Foster - PECFA CERN - 11/12 Global Design Effort 8