19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
Status of the ATLAS MM project
BMLD refurbishing G. Iacobucci and G. Chiodini INFN Bologna and Lecce for the RPC group CERN, June 19, 2006 ATLAS Muon week.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
July S. Patricelli ATLAS TMB1 RPCs new schedule & QC results zSchedule yGas Volume production schedule yGlobal RPC schedule zQC results yGas Volume.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
RPC production at GT (status and plans). Status After the IFR meeting in Rome a new version of the Production Plan have been proposed to GT Main requirements.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
RPC Assembly STATUS (Update on Support Panels Crisis) F.G. CERN
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Status of NA62 straw electronics Webs Covers Services Readout.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
OPERA Coll.Meet. October 2002Luca Stanco - Padova1 1.Status of Magnets and financial orders (including RPC) Mario Spinetti15’ 2.Status of RPC (including.
G. Carboni – Muon Meeting – RPC situation: RPC production in GeneralTecnica (GT) has suffered large delays, due to gluing problems (spacers)
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
C.Gustavino, june 4th 2004, Hamburg XPC Status report VETO status report Glass RPC R&D Outline:
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
New Bakelite production or Phase 2 Salvatore Buontempo (INFN, Naples & CERN) on behalf of CMS Central TC Group Atlas & CMS meeting RPC Phase 2, November.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
G. Pugliese Task Preparation for large series production: production protocols of optimised RPC components for easy technology dissemination G.
University of Wisconsin
Production ad Quality control of RPCs for the CMS muon barrel system
RPC Production at GT A Mass scale RPC Production
News about the WA104 Programme
To do list production organization and commitments
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items (strip panels, FE boards mounting, support panels, unit’s assembly, test) must follow this schedule. zAn INFN committee coordinates this production for all experiments which use or plan to use RPCs (ATLAS, CMS, ARGO, OPERA, ALICE, LHCB). zProduction according to this plan started in January 2002.

19/6/2002S. Patricelli Muon week2 Status of RPC production (2) zIn February 2002 it was found that backelite produced after an upgrade of the production plant did not have the same gluing properties as the previous one. zATLAS was able to continue with production till April 4 th using bakelite produced in zMany different analysis (optical, chemical, XRF, infrared) have been done to understand the different properties of the bakelite surface but we do not have, at the moment, a clear answer.

19/6/2002S. Patricelli Muon week3 Status of RPC production (3) zHowever a very reliable solution has been found: Bakelite plates, before gluing, go through a “washing machine” (plastic brush + Methyl Ethyl Chetone). zGluing properties are better than before. z5 ATLAS gas volumes have been produced at the beginning of May to test the effect of the new procedure on chamber performance. With 4 of these one BML-D Unit has been produced an tested in Naples.

19/6/2002S. Patricelli Muon week4 Status of RPC production (4) zAfter these tests we decided to restart production of gas volumes at the end of May. zA new production plan has been prepared by the INFN committee to take into account the delay due to the 2 months stop. zAccording to this plan we have now the following schedule for gas volumes production

19/6/2002S. Patricelli Muon week5 Status of RPC production (5) zThis schedule is very tight and is based on the production of 9 gas volumes/day. zHowever, as demonstrated at the restart of production, we are confident that we will be allocated 11 gas volumes/day. zIn this case the production of gas volumes can be completed by the end of Oct with a global schedule still compatible with the ATLAS installation schedule.

19/6/2002S. Patricelli Muon week6 Status of RPC production today (standard units)  Bakelite plates(PanPla) %  Gas volumes(GT) %  Strip panels(GT+Na) %  F.E & B.E boards(Microtel+RM2) %  Readout panels(RM2) %  Support panels (sets)(Protvino) %  RPC Units(Lecce)982424%

19/6/2002S. Patricelli Muon week7 Other items - Support panels zThe RPC groups decided to replace the paper honeycomb with aluminum honeycomb for pre-bent support panels. This solution increases the robustness and the long-tern reliability of the RPC mechanical structure. zPlane panels are still done with paper honeycomb.

19/6/2002S. Patricelli Muon week8 More details (mounting of F.E. boards) zMuch of the present delay of F.E. boards mounting on strip panels is due to the last delivery of F.E. boards. zIn Rome 2 there are many panels with B.E. boards mounted waiting for F.E. boards. zNext two-three months will be crucial to understand if the required “cruise” speed is achievable.

19/6/2002S. Patricelli Muon week9 Gas volume production January - June 2002

19/6/2002S. Patricelli Muon week10 Gas volume production

19/6/2002S. Patricelli Muon week11 Gas volume schedule Includes 10% spares Holidays taken into account

19/6/2002S. Patricelli Muon week12 Global efficiency

19/6/2002S. Patricelli Muon week13 Local efficiency  (2 gap)  EST (1 gap)  WEST (1 gap)

19/6/2002S. Patricelli Muon week14 Inefficient regions HV = V

19/6/2002S. Patricelli Muon week15 Cluster size

19/6/2002S. Patricelli Muon week16 RPC global schedule