Building Access/egress Weather Emergency Planning 1.

Slides:



Advertisements
Similar presentations
City of Traverse City Snow Removal Operations. Responsibilities Streets Division –State Highways (Trunkline, 8 miles) –City Streets (83 miles) Emergency.
Advertisements

Incident Command System in an EOC Unified Management OperationsPlanningLogisticsFinance SafetyPIO Liaisons.
 Overview of Ministry and Responsibilities  Questions  Input and Ideas  What is going well  What can be improved  What can be added  What resources.
Effective Integration of HIPAA Information Security with Privacy Compliance Richard B. Boyer, Privacy Officer Jody S. Hawkins, Information Security Officer.
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
June 5, 2007 BCC Called Public Hearing on BZA #SE , April 5, 2007 APPLICANT: Genesis Communications, Inc.
ZHA Zimmerman / Volk Associates, Inc. Martin / Alexiou / Bryson, Inc. Recommendation One Author: Denise B. Clapp Swap Executive Business Education Center.
Joe Turner, PE Disaster Recovery Engineer. DIVISIONS AND DISTRICTS.
MISSISSIPPI CONTRAFLOW OPERATIONS Providing the State of Louisiana Assistance during the Hurricane Emergency Evacuation of New Orleans Bob Chapman Emergency.
Hurricane Isaac X X X ◘ Isaac began as a tropical wave on August 16 th off the coast of Africa & was classified as a tropical storm on August 21 st ◘
City/University Projects Fund Calendar Year 2012 Budget Request.
Troy Fire Department Incident Command System
Building Coordinators Network January 12, Welcome.
Using LDRs to Implement Ped/Bike Change. LDRs – Land Development Regulations The collection of laws and regulations that govern the use of land, zoning,
REQUESTMEDICALEVACUATION TSP 081-T Line 1 - Location of the pickup site Line 2 - Radio frequency, call sign, and suffix Line 3 - Number of patients.
6-1 Lesson 6 | Practice RSA. Perform a practice-RSA of a design-stage or an in-service road. Analyze data acquired from site visit or design plans and.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
Achieving Greater Success in Emergency Management by Preparing & Planning with Public Works.
NORTH CAROLINA EMERGENCY MANAGEMENT ASSOCIATION
Emergency Evacuation Procedures
Northwest Region CSI S508 Code Part 2 Seminar 1A Stephen Winstead, AIA.
Your Community's Volunteer Reception Center. Goals a.Attract local volunteers willing to respond following a local disaster by managing a VRC b.Guide.
Winter Storm Response Presentation & Discussion. Winter Storm Response2 Storm Response – PW Mission “We strive for the safest roadways at a reasonable.
NOAA NSOF Logistics Maps and Directions.
© MAKO Surgical Corp CONFIDENTIAL - For limited use only. Not for distribution. 1 Direction to MAKO Surgical MAKO Surgical –Address: 2555 Davie Road,
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Temple City Housing Element City Council /Planning Commission Study Session September 27, 2012.
Second National Emergency Management Summit Presented by: Scott Aronson, MS Principal Full Building Evacuation.
Administrative Services CITY OF EVANSTON 2015 Second Quarter Financial Report Martin Lyons, Assistant City Manager / CFO Erika Storlie, Deputy City Manager.
Looking east to Park Street Old tennis court area, looking south.
2014 Budget Survey Presentation to Mayor & Council September 25, 2013 Jennifer Kinneman, Manager, Civic Engagement & Corporate Initiatives.
High School Transition & Choice Process. Where do I get information? Middle School Counselor and Teachers High School Information Open Houses.
The Church Street resident only parking lot, next to the sewer pump station is CLOSED due to the construction work on the Pump Station. Resident are to.
May 3, 2013 Wildfire Response & Recovery SWEDE Austin, Texas.
A Emergency Communication Hub is… a community gathering site that activates in the event a major disaster occurs that makes it impossible to share information.
1 EMERGENCY DEBRIS REMOVAL PLAN. 2 Debris Removal Areas.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Rice Administrative Department Moves Human Resources (Except HR Training in IBC) Administrative Systems Controller's Office (Except Cashier Office)
UMSC Meeting Chicago to  Urbana-Champaign By Bryce Ching UMSC Historian.
Facility Update Citizens Capital Budget Advisory Committee February 6, What is Medic? 2.How we use the space 3.Growing pains 4.What it means.
American With Dishabilles Act of 1990 By Blanca Salazar Period 1.
MICHAEL CLIFFORD WEST VIRGINIA GEOLOGICAL AND ECONOMIC SURVEY 2010 WEST VIRGINIA GIS CONFERENCE JUNE 9 TH, 2010 The West Virginia Broadband Mapping Program.
Tailboard Talks Intersection Leapfrog Florida State Fire College Ocala, Florida
Storm Recap Update June 18, sandyspringsga.gov Timeline: Storm Impact  Tornado warning issued at 8 p.m., Thursday June 13 Sirens activated & EOC.
Coalition for the Homeless of Central Florida Coalition for the Homeless of Central Florida Men’s Service Center.
December 9, )Business cards 2)Open Meeting Laws/Training 3)Q-Storming Questions 4)Other.
Title III of the ADA: Overview of Architectural Requirements Amy F. Robertson Executive Director – Education
DSHS Deployable Teams. Deployable Teams 2011 Medical Incident Support Team - M-IST Ambulance Staging Manager - ASM Ambulance Strike Team Leader - ASTL.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Accessibility Self- Evaluation and Transition Plan Oregon Caves National Monument and Preserve December 11, 2015 E X P E R I E N C E Y O U R A M E R I.
Second Street Closure for Construction of B21 1/16/16 – 1/31/16.
® Managing Function 4 AM Operations WSS/ WSH Don Marbrey Ken Capps June 2011.
Rezoning Application No.1291 City Council September 8, 2010 Little England Chapel Cultural Center.
TENANT TRAINING HURRICANE SEASON 2016 NATIONAL SAFETY MONTH Along with the start of Hurricane Season, June is observed by the NSC as National Safety.
Cessco Fabrication & Engineering Ltd.
2006 Facilities Master Plan Update Cañada College
Innovation North-Side Neighborhood Access Feasibility Study
Skillman Corridor TIF District
Kiosk Upgrade Project.
Emergency Snow Routes January 14, 2016.
Winter Weather Safety.
FOR LEASE Design Center W.L.N & 1020 W Loop N
March 7 & 8, 2019 Celebrate is back!
Affordable, Safe, Sanitary & Comfortable Housing for Low Income Adults
March 7 & 8, 2019 Celebrate is back!
Caboolture & Kilcoy Hospitals & Woodford Corrections Health Service
FOR LEASE BELLA VINO PLAZA
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Presentation transcript:

Building Access/egress Weather Emergency Planning 1

Objectives Identify a path from identified parking area to primary entrance to be cleared and used during an ice or snow emergency Prioritize buildings to support execution response. 2

Overview of information Location priority explanation Buildings broken down into priority categories Category 1 – 24/7 occupancy/function Category 2 – High occupancy buildings (address higher population first) Category 3 – All other occupied buildings. Category 4– All other buildings/structures. Category 4 will not be attended to unless special case by case requests are approved beforehand through EOC and AS24. Map of buildings in Category 1 and 2. Occupied building level site plans of all buildings. 3

Legend Category 1 Buildings Streets Cleared to Category 1 Buildings Category 2 Buildings Streets Cleared to Category 2 Buildings Category 3 Buildings Streets Cleared to Category 3 Buildings Army Buildings Street Cleared by Army Minimum Parking Cleared Minimum Walking Paths Cleared Entrance Cleared 4

Category 1 – 24/7 Buildings 4663 – Payload Control Center 4629 – IT Mission Control 4207 – Communication Hub 4312 – Security / – Medical Center 4250 – Utility Control Center 4494 – Security Offices These buildings are occupied 24/7. During an ice/snow emergency, employees may be trapped within the buildings and in need of assistance. Other employees need access to continue the 24/7 operation. 5

Category 1 Building Locations N Martin Rd Rideout Rd Category 1 Buildings 6

B4663 Snow/ice Removal Site Plan NORTH 24/7 Minimum parking cleared Walking path to entrance Martin Road Dodd Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Minimum parking cleared Walking path to entrance 7

B4629 Snow/ice Removal Site Plan NORTH Access From Martin Road Minimum parking cleared Walking path to entrance Dodd Road Raven Street NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 8

B4207 Snow/ice Removal Site Plan NORTH Minimum parking cleared Walking path to entrance Martin Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 9

B4312 Snow/ice Removal Site Plan NORTH From Martin Rd From Morris Rd Minimum parking cleared Walking path to entrance Digney Road 10

B4249 Snow/ice Removal Site Plan NORTH 4249 Minimum parking cleared Walking path to entrance Morris Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 11

B4250 Snow/ice Removal Site Plan NORTH Minimum parking cleared Walking path to entrance Minimum parking cleared Walking path to entrance Morris Road Neel Road 12

B4494 Snow/ice Removal Site Planp NORTH Minimum parking cleared Entrance cleared From Morris Rd Mercury Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 13

Category 2 - High Capacity These buildings together accommodate over 70% of the on-site employees. 14

Category 2 Building Locations N Martin Rd Rideout Rd Category 1 Buildings Category 2 Buildings 15

B4200 Snow/ice Removal Site Plan Minimum parking cleared Walking path to entrance Minimum parking cleared NORTH 16

B4201 Snow/ice Removal Site Plan Minimum parking cleared Walking path to entrance Access from Neel Rd NORTH 17

B4202 Snow/ice Removal Site Plan Minimum parking cleared Walking path to entrance Access from Rideout Rd NORTH 18

B4203 Snow/ice Removal Site Plan NORTH Minimum parking cleared Walking path to entrance Access from Rideout Rd 19

4487 Snow/ice Removal Site Plan NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. NORTH Minimum parking cleared Walking path to entrance 20

B4600 Snow/ice Removal Site Plan NORTH Minimum parking cleared Walking path to entrance Access from Martin/Rideout Rd NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 21

B4601 Snow/ice Removal Site Plan Minimum parking cleared Walking path to entrance Access from Rideout Rd NORTH 22

B4602 Snow/ice Removal Site Plan NORTH Minimum parking cleared Walking path to entrance Access from Rideout Rd 23

B4610 Snow/ice Removal Site Plan NORTH Minimum parking cleared Walking path to entrance Access from Martin Rd NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 24

B4708 Snow/ice Removal Site Plan NORTH Minimum parking cleared Walking path to entrance Minimum parking cleared Access from Rideout Rd NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 25

Category

NORTH B4205 Snow/ice Removal Site Plan Minimum parking cleared Walking path to entrance Access from Neel Rd NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 27

B4241 Snow/ice Removal Site Plan NORTH Walking path to entrance Minimum parking & walking path cleared Access from Morris Rd 28

B4244 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Access from Morris Rd 29

B4251 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Access from Morris Rd 30

B4306 Snow/ice Removal Site Plan NORTH Access from Rideout or Morris Roads Walking path to entrance Minimum parking cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Digney Road Rideout Road 31

B4315 Snow/ice Removal Site Plan NORTH Walking path to entrance Minimum parking cleared Access from Rideout or Morris Roads Digney Road 32

B4346 Snow/ice Removal Site Plan NORTH Walking path to entrance Minimum parking cleared Morris Road 33

B4348 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Access from Digney Rd Digney Road 34

B4353 Snow/ice Removal Site Plan NORTH Walking path to entrance Minimum parking cleared Access from Morris Rd Digney Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 35

B4436 Snow/ice Removal Site Plan Access from Martin Rd Minimum parking & walking path cleared NORTH NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 36

B4464 Snow/ice Removal Site Plan NORTH Walking path to entrance Minimum parking cleared Access from Morris Rd Digney Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 37

B4476 Snow/ice Removal Site Plan NORTH Access from Morris Rd Walking path to entrance Minimum parking cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 38

B4482 & B4483 Snow/ice Removal Site Plan NORTH Access from Morris Rd Walking path to entrance Minimum parking cleared Mercury Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 39

B4485 & B4491 Snow/ice Removal Site Plan NORTH Access from Rideout Rd Minimum parking & walking path cleared Mercury Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Rideout Road 40

B4493 Snow/ice Removal Site Plan NORTH Access from Morris Rd Walking path to entrance Minimum parking cleared Mercury Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 41

B4549 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Access from Dodd Rd Dodd Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 42

B4554 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Access from Relay Ave NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 43

B4561 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Access from Relay Ave NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 44

B4570 Snow/ice Removal Site Plan NORTH Minimum parking cleared Relay Avenue Walking path to entrance NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 45

B4571 & B4572 Snow/ice Removal Site Plan NORTH Population - 2 Minimum parking & walking path cleared Relay Avenue Access from Relay Ave NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 46

B4583 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Access from Relay Ave NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 47

B4604 & 4646 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Saturn Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 48

B4605 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared Fowler Road Access from Rideout Rd NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 49

B4619 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared Access from Martin Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 50

B4623 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared Centaur Street Access from Rideout Rd to Fowler Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 51

B4627 Snow/ice Removal Site Plan NORTH Centaur Street Access from Rideout Rd to Fowler Road Minimum parking cleared Minimum walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 52

B4628 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared Centaur Street Access from Rideout Rd to Fowler Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 53

B4631 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared Access from Rideout Rd to Fowler Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 54

B4650 Snow/ice Removal Site Plan NORTH Dodd Road Minimum parking cleared Minimum walking path cleared Primary staging area for clearing crews NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 55

B4653, B4655 & B4656 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 56

B4654 Snow/ice Removal Site Plan NORTH Dodd Road Minimum parking & walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 57

B4659 &B4660 Snow/ice Removal Site Plan NORTH Dodd Road Minimum parking & walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 58

B4666 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared Dodd Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 59

B4702 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared Access from Rideout Rd to Apollo Road NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 60

NORTH Minimum parking & walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Access from Rideout Rd to Apollo Road B4705 Snow/ice Removal Site Plan 61

B4707 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Access from Rideout Rd to Apollo Road 62

B4711 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Access from Rideout Rd to Apollo Road 63

B4718 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Access from Rideout Rd to Apollo Road 64

B4723 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Rideout Road 65

B4727 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Rideout Road 66

B4728 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Rideout Road 67

B4732 Snow/ice Removal Site Plan NORTH Minimum parking cleared Minimum walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Rideout Road 68

B4755 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. 69

B4760 Snow/ice Removal Site Plan NORTH Minimum parking & walking path cleared NOTE: All designated parking (except ADA) is suspended until it is communicated that the entire parking area is fully cleared. Access from Rideout Rd to Apollo Road 70