Presentation is loading. Please wait.

Presentation is loading. Please wait.

May 28 2009 – August 14 2009. Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.

Similar presentations


Presentation on theme: "May 28 2009 – August 14 2009. Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete."— Presentation transcript:

1 May 28 2009 – August 14 2009

2 Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete parking lot during its meeting on May 18 th 2009 Construction should start by May 28 th with substantial completion by August 7 th and the punch list completed by August 14 th A Fire Lane must remain open at all times

3 Highway 51 Parking Lot Project Phase 1 ( Estimated State date: May 28 2009): See the White area of map on the next slide Project will remove asphalt and replace parking spaces closest to buildings, including parking between 300 and 400 building Open a new entrance/exit from Bonner Road that is closer to Hays Hall with three lanes (1 entrance, 1 exit to left, 1 exit to right) Close current entrance/exit from Bonner Road that is closer to 100 Building Students and employees will need to park in Phase 2 area or in other parking lots around campus For safety reasons, people will not be able to cross the construction area; please walk around the barricades The parking lots by the Career & Technology Center and Visual Arts Center will be closed during Phase 1 due to road and new parking lot construction

4 Phase 1 Phase 2

5 Highway 51 Parking Lot Project Phase 2 (Estimated State Date: early July 2009) : Shaded area of map Replace asphalt parking spaces closest to Highway 51 Close Entrance/Exit from Bonner Road that is close to Highway 51 Students and employees will need to park in Phase 1 area or in other parking lots around campus People will not be able to cross the construction area; please walk around the barricades The new parking lots by the Career & Technology Center and Visual Arts Center are scheduled to open by mid-July


Download ppt "May 28 2009 – August 14 2009. Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete."

Similar presentations


Ads by Google