SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.

Slides:



Advertisements
Similar presentations
Early Results from the COS Time-Dependent Spectroscopic Sensitivity Programs Rachel Osten TIPS presentation, Jan. 21, 2010.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
Initial Alignment Check / Calibration in Vacuum Dennis Ebbets With substantial contributions from Tom Delker, Erik Wilkinson, Steve Osterman, Ken Brownsberger,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
Fine Guidance Sensor 2010 HST Calibration Work Shop Ed Nelan Barbara McArthur STScI.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
27-Apr-2009K. Sembach 1 Servicing Mission 4 - Revisited Ken Sembach STScI Hubble Project Scientist April 27, 2009.
Five Busy Months for FGS STScI/TIPS 01/15/09 Ed Nelan.
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
An Overview of the Recent HST Safings An Overview of the Recent HST Safings Ken Sembach TIPS Presentation September 20, 2007.
SERVICING MISSION OBSERVATORY VERIFICATION (SMOV) SMOV PLANNING Carl Biagetti COS Science Team Meeting 26 Oct
Page 1. Page 2 SMOV Status SMOV is proceeding on-track Key programs executed –ERO program –Geometric distortion program completed –ACS to FGS alignment.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
1 Description and Benefits of JWST Commanding Operations Concept TIPS/JIM Meeting 17 July 2003 Vicki Balzano.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
The Status of COS Flat Fields Tom Ake TIPS 21 August 2008.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 18 January 2007.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 18 January 2007.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
COS Training Series II. Optimizing Observations --- David Sahnow February mm.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
STIS Closeout Plan Paul Goudfrooij Space Telescope Users Committee, 11/18/2004.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
NIRISS Science Team Meeting Oct 2015 NIRISS Activities in CV3 André Martel.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
COS Training Series COS Update: pre-SMOV / Cycle Tony Keyes March 2009.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
Launch and On-orbit Checkout
STScI Ground System Development Status:
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007

Aloisi – 24 October 2007 Slide 2 of 10 SMGT Rationale   Demonstrate end-to-end readiness of the ground system to support SMOV   Test and demonstrate readiness of operational COS instructions and PDB elements – –Does not exercise all combinations of allowed modes and setups, but does exercise all command paths   Test all special commanding required on-orbit for SMOV – –Examples include: first-time NUV detector turn-on; NUV detector recovery from anomaly; NUV fold test, first-time FUV detector turn-on

Aloisi – 24 October 2007 Slide 3 of 10 SMGT Activities   STScI SMS generated through proposal 874   First COS SMGT (26-27 July 2007) – –Started on 26 July 2007; STScI SMS portion planned to last ~ 24 hours – –Anomalous NUV HV shutdown occurred after ~ 4 hours of SMS execution during MAMA fold test – –A couple of errors present and corrected in the SMS   Second COS SMGT (7-8 September 2007) – –Dry-run executed August 2007 – –Real test executed 7-8 September 2007 – –All special commanding executed successfully – –Test data delivered successfully to STScI

Aloisi – 24 October 2007 Slide 4 of 10 SMGT Liens   NUV fold test – –Data sampling did not return sufficient signal for analysis – –Data was sampled via engineering telemetry (only 0.1 sec of every 10 sec) – –Science exposure added at the end to capture all the data   Target Acquisition macro instruction timing – –Some timing pads in commanding will likely be modified   Mechanism relative-move macro – –Aperture mechanism moves are not always made in preferred direction – –Macro has been modified   Currently in the process of clearing the SMGT liens against bench and against SI (26 November 2007)

Aloisi – 24 October 2007 Slide 5 of 10 SMOV4 Activities   Successful SMOV4 “delta” requirements review by HSTP on 21 March 2007 – –COS requirements expanded and updated for this review – –No significant changes to COS requirements   Successful SMOV activity summary (Phase I) review by HSTP on 12 October 2007 – –Mapping of requirements to programs, assignment of resources, and program description (STScI and COS IDT)   SMOV Program (Phase II) generation: Nov 2007 – July 2008

Aloisi – 24 October 2007 Slide 6 of 10 7 Aug SM4 Launch 21 Mar Requirements Review by HSTP Reception area Proposal Descriptions SMOV4 Activity Timeline 1 March September September Jan High Priority (alignments, etc) Phase II Due Apr-Sep Activity Summary (Phase I) preparation STScI/IDT 1 Sep Reserved Target List Due (GTO) 15 May ERO and Balance of SMOV Phase II Due 10 Jul GTO Phase II Due 1 March Oct Activity Summary Review by HSTP

Aloisi – 24 October 2007 Slide 7 of 10 SMOV4 Plan Overview   36 activities currently identified for both NUV & FUV   Sequence and duration established – –NUV will start first, followed immediately afterwards by FUV – –In current very conservative draft COS SMOV will terminate around end November (~ 1 month later than any other SI) – –In the process to shorten the total SMOV period for COS   Total of 145 (internal) & 100 (external) orbits currently estimated external internal NUV FUV Total

COS SMOV4 NUV Sequence COS-01 Recovery from SAFE COS-02 Onboard Memory Check COS-03 Science Data Buffer Check COS-04 NUV Initial HV Turn-on/Ramp-up COS-07 NUV Fold Test COS-06 NUV Internal Functionality & Operation COS-05 NUV Dark Measure COS-08 OTA to FGS Alignment (NUV) COS-09 NUV Optical Alignment /Focus visit 1-3 COS-15 Internal NUV Wavelength Verify COS-09 NUV Optical Alignment vis 4-5 COS-10 Internal NUV Wavelength Meas Vis 2 – lamp 2 COS-11 NUV Imaging Acq Verify COS-21 NUV High S/N Verification COS-13 NUV Imaging Performance COS-14 NUV Int/External Wavelength Scales COS-20 NUV Structural & Thermal Stability COS-12 NUV Dispersed Acq Verify Do NOT Require Wavelength Scale Update External Observations May require wait Update SIAF FUV SMOV sequence HST releaseMAMA LV on Internal pressure <20 micro-Torr BEA Complete Alignment OK Alignment Not OK COS-10 Internal NUV Wavelength Meas – Vis 1 Patchable Const. Update Wavelength Ranges Not OK Wavelength Ranges OK Enable NUV ERO and Science COS-19 NUV Spectr. Sensitivty COS-16 NUV Ext. Spectr. Perf. Part 1 COS-17 NUV Ext. Spectr. Perf. Part 2 COS-18 NUV Flat Fields Internal pressure <10 micro-Torr Require Wavelength Scale Update Update SIAF Special Commanding Real-time uplink; Poss. update SIAF Rapid data turnaround required

COS SMOV4 FUV Sequence COS-01 COS-02 COS-03 COS-22 FUV Detector Door Open COS-23 FUV Initial HV Turn-on/Ramp-up COS-25 FUV Internal Functionality & Operation COS-24 FUV Dark Measure COS-09 NUV Optical Alignment /Focus COS-26 FUV Optical Alignment /Focus visit 1 COS-30 Internal NUV Wavelength Verify COS-27 Internal FUV Wavelength Meas Vis 2 – lamp 2 COS-28 FUV Dispersed Acq Verify COS-35 FUV Structural & Thermal Stability COS-29 FUV Int/External Wavelength Scales COS-34 FUV Spectr. Sensitivty External Observations May require wait Internal Pressure <100 micro- Torr BEA Complete Alignment OK COS-27 Internal FUV Wavelength Meas – Vis 1 Patchable Const. Update Wavelength Ranges Not OK Wavelength Ranges OK Enable FUV ERO and Science COS-33 FUV Flat Fields COS-31 FUV Ext. Spectr. Perf. Part 1 COS-32 FUV Ext. Spectr. Perf. Part 2 COS-36 FUV High S/N Verification Internal Pressure <10 micro- Torr Require Wavelength Scale Update Does NOT Require Wavelength Scale Update HST release NUV SMOV sequence 10 October 2007 XDL at OPER Update SIAF Pressure Gauge OFF Special Commanding Real-time Commanding Rapid data turnaround required Outgassing Concern? Real-time uplink

Aloisi – 24 October 2007 Slide 10 of 10 STScI COS Update   COS Instrument Handbook in preparation – –Updated version provided to IDT for second review – –To be distributed with Cycle 17 Call for Proposals (Dec 2007)   COS input provided for Cycle 17 CP and Primer   COS ETCs – –Spectroscopic ETCs signed off (2nd order light not implemented) – –Imaging and Target Acquisition ETCs under development – –To be distributed with Cycle 17 Call for Proposals (Dec 2007)   COS Team has supported SM4 SIM at GSFC on 11 October 2007   STScI will be hosting the next COS Science Team Meeting on 26 October 2007   COS Team will have strong presence at the AAS meeting and the Bologna Workshop in January 2008