DESY. Deutsches Elektronensynchrotron Introduction of DESY and MKK group Jens-Peter Jensen Asset and Maintenance Management Workshop 2013 Genf, 13.11.2013.

Slides:



Advertisements
Similar presentations
SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
Advertisements

DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
M. Bieler, M. Ebert, L. Fröhlich, J. Keil, J. Klute, G. Kube, G. K. Sahoo, R. Wanzenberg, DESY, Hamburg, Germany Abstract Acknowledgment Commissioning.
1 AMMW2013 workshop 13 d – 15 th of November, 2013 Asset management tools: use and improvement in SOLEIL – P. Betinelli Asset management tools: use and.
DESY. Status and Future Developments Albrecht Wagner Plenary ECFA 28 November 2008 CERN.
Particle accelerator and Advanced accelerator technologies Advanced Instrumentation and Detector technologies Advanced Light Source Application of Accelerator.
1 Albrecht Wagner, EPP2010, 16 May 2005, Chicago ILC - International Cooperation and Coordination The Point of view of DESY and Germany Albrecht Wagner,
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
Sustainability at DESY
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Cryogenik waste heat utilization for DESY and European XFEL 2nd Workshop on Energy for Sustainable Science at Research Infrastructurs Jens-Peter Jensen,
Introduction to electronic resources management Workshop introduction and overview.
Marketing at DESY Building Bridges from Science to Market Christian Mennrich HEPTech Workshop on Marketing Sofia,
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
1 Albrecht Wagner, Sep 06 Sino-German Workshop Frontiers in QCD September 2006 at DESY Albrecht Wagner.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
1 Albrecht Wagner DESY - Overview Mission: Development, construction and running of accelerators Exploit the accelerators for particle physics and research.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Introduction Riko Wichmann, XFEL Project Office (XPO) XFEL Technical Reviews.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities J.P. Hill Experimental Facilities Division Director PAC Meeting November 20, 2007.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Status of the Project April EPOG, 12th Outreach-Meeting, CERN, Petra Folkerts, DESY 1 Report from DESY, Hamburg, Germany The Status of TESLA and.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY Report from DESY, Hamburg, Germany.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
IWAA 2010 Hamburg Germany Deutsches Elektronen-Synchrotron, DESY Gerhard Neubauer, MEA2 A GIS sight on the European XFEL.
2016 DOE EPSCoR State Implementation Grants Program January 7, 2016 Contact : Richard Cristina.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Committee to Assess the Current Status and Future Direction of High Magnetic Field Science in the United States 18 May 2012 Dr. Patricia M. Dehmer Deputy.
DESY Deutsches Electron Synchrotron Shima Bayesteh.
PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
Slide: 1 MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD APS SPRING 8 ESRF AMMW2013 I. LECONTE – P. ROUSSELY – OPERATION Group.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
First Line Diagnosis FLD Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement.
MMT Retreat Technical Services across ESS Peter Rådahl
EiroForum School on Instrumentation 2013, CERN, May Thomas Tschentscher European XFEL.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
ESS Innovation Procurement Workshop
European Network for Novel Accelerators (EuroNNAc2): WP7
PETRA III at DESY Hamburg/Germany
MSc-Student Activities at the European XFEL
(Selected) Project Management Processes at the XFEL
Uppsala Commitment to ESS and FREIA Planning
Introducing European XFEL Enlightening Science
The ILC Control Work Packages
Hosting Orsay Walid KAABI
Nick Balshaw, Asset Manager
ALBA capabilities towards contributions to the FCC study
Energy Management at DESY and a new Energy Monitoring System
News from DESY. Joachim Mnich KET Jahresversammlung Bad Honnef
Introduction to Jefferson Lab
Maintenance at ALBA facility: Strategy for the conventional services
Laser Und XFEL.EU Experiment
Presentation transcript:

DESY. Deutsches Elektronensynchrotron Introduction of DESY and MKK group Jens-Peter Jensen Asset and Maintenance Management Workshop 2013 Genf,

Jens-Peter Jensen | AMMW2013 | | page 2 PETRA IIIFLASH CFEL  New High Brilliance X-ray Sources  Research Labs/ Inhouse  Application Labs DESY. Light Sources

Jens-Peter Jensen | AMMW2013 | | page 3 Mission: Development, construction, operation and scientific exploitation of accelerators Provide access and services for national and international users Internationally used, nationally funded Research Institute Research Infrastructures: PETRA III, FLASH (II), XFEL, TIER-2, Testbeams Sites:Hamburg and Zeuthen Base-Budget: 180 MEuro Funding source: 90% federal, 10% state Staff:~1900 FTE in Hamburg and Zeuthen Users:~3000 (1500 from abroad) from 45 nations DESY – Deutsches Elektronen Synchrotron - founded 1959 – DESY. Organization Member of Helmholtz Association Hamburg Zeuthen

Jens-Peter Jensen | AMMW2013 | | page 4 DESY. Organization DESY Hamburg has 4 divisions  M division: operation and construction of machines like LINAC, DESY, PETRA, FLASH, XFEL, REGAE  V division:administration, central services, civil construction  FS division:research with photons at PETRA, FLASH  FH division:high energy physics research at HERA, LHC M division is divided in groups  MKK:AC power supply, water cooling, heating, ventilation, air conditioning, magnet power supply, XFEL modulators, rf power supply, process control and data archiving  MPY:machine physics, accelerator R&D  MVS:vacuum systems  MHF:RF systems and cavities  MIN:injector and LINACs  MKS:cryogenics and super conducting  MCS:control systems for machine operation  MDI:diagnostic and instrumentation  MSK:beam control systems  MEA:accelerator and experimental construction support

Jens-Peter Jensen | AMMW2013 | | page 5 MKK. Asset and Maintenance Management Responsibility for asset and maintenance management DESY policy:  Each group is responsible for his own equipment  Each group manages the operation, maintenance, examination periods DESY strategy  Reliability for PETRA and FLASH must be better than 95 %  M division leader takes action, if the reliability is less  The accelerators run 24 h and 7 days/week  Wednesday day shift there is time for repair and machine studies  After 6 weeks there is a service week from Monday to Friday  but tests and machine studies during the night  10 month operation a year

Jens-Peter Jensen | AMMW2013 | | page 6 DESY. Asset and Maintenance Management Quality assurance Tools: There are different tools at DESY in operation I can report from the MKK group:  MKK has implemented an “assessment and instruction manager” (PU manager)  SQL-Forms, ORACLE data base  Responsible person for the equipment gets an information 4 weeks in advance via  If he overruns the date, the “PU manager” informs his boss  After another 4 weeks it escalates to MKK group leader  That means a question or a date in my office  This underlines the importance

Jens-Peter Jensen | AMMW2013 | | page 7 DESY. Asset and Maintenance Management Outlook Main challenge of the organization in asset and maintenance management  Time and available staff  MKK works on several projects:  XFEL construction until 2015  FLASH II construction and commissioning 2014  PETRA extension 2014, 2 additional experimental halls with new undulator sections  CSSB Lab.-building, construction 2014 until 2015  Photo Science building, postponed until mid 2015  It was a big change in 2007 after 18 years of HERA operation to convert to the construction of PETRA III and XFEL  It will be a challenge in 2016 after 9 years of construction to start up the new machines and come to a reliable operation  We will adapt our asset and maintenance management system to ensure a high reliability of the technical infrastructure