Two-Stage Copeland Scroll Compressors. DESIGN AIR UNIVERSITY External view 1 st stage = 67% 2 nd stage = 100% Used in 17 SEER AC.

Slides:



Advertisements
Similar presentations
Mrs. Cockrell PAP Physics
Advertisements

Breadboard Power bus + (red) and – (blue) on left and right of breadboard abcde (green) are all connected in a row fghij (yellow) are all connected in.
Thermostats, Pressure Switches, and Other Electric Control Devices
HEAT PUMPS.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
HVAC Commercial Ref.
Left Side Discharge Pressure Regulator
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
QF Manifold Harness Test. To test the cable: 1) Disconnect the cables from the L5000Plus/XL & Manifold 2) On crimped terminal end side check resistances.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Air Conditioning Compressors.
HVAC121 – Gas Heat Flame Rectification.
Chapter 33 Charging System Fundamentals.
AIR CONDITIONING (COOLING) UNIT 40 TYPICAL OPERATING CONDITIONS
California Friendly ® Landscape Training Irrigation System Troubleshooting The Metropolitan Water District of Southern California and the Family of Southern.
TEST METER OPERATION. Electrical Test Instruments Analog Or Digital Voltmeters – Measuring Potential Difference Ammeters – Measuring Current Flow – Clamp.
Charging System Service
Air Compressors.
E2 Motors and Motor Starting
Electrical Electricity Fuses Relays Solenoids Electrical Testing
Using a DVOM.
7.2.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Procedures for Measuring Resistance Between Two Given Points in.
Windham Tech HVAC Solid State Current Coil Potential Starting Relays.
Air Handler Terminology
SACE Stage 1 Conceptual Physics Electric Current.
Robertshaw Millivolt Troubleshooting Guide Gas Products
So… How does Smartcool achieve savings??.  Compressors use 70% of the energy in refrigeration and air conditioning systems.  The cooling cycle is dynamic.
Air Handler Terminology
Forging new generations of engineers
 The continuous flow of electrons is current.  Measured in amps (A).  Two types of current 1. Direct current (DC) – electrons flow in only one direction.
Introduction to Defrost
Understanding the                                                                                                                                                                                                                          
 “A multimeter is an instrument designed to measured electric current, voltage and usually resistance, typically over several ranges of value”.
E1 – Electrical Fundamentals
Lesson Measuring and Calculating Electricity. Interest Approach § Have you or your parents ever been using several appliances in the kitchen and had a.
Air Conditioning Starting Relays.
ADT490 Panel Theory. 2 System Power Supply Grounding ‣ Circuit separates positive / negative from Ground ‣ Ground fault - resistance to ground ≤ 10 kΩ.
Electric Current and Ohm’s Law. Electric Current Electric current is the continuous flow of electric charge Two types of current are direct and alternating.
Electrical System Intro to Automotives.
High frequency solenoid valve SX10 Series
Electrical Current and Circuits How Electricity Gets To Where It Is Going.
Ignition System An ignition system is a system for igniting a fuel-air mixture. Ignition systems are well known in the field of internal combustion engines.
Ohm’s Law Notes JAN 7. Vocabulary current : how quickly the electrons are flowing through the circuit; units: amperes (A) voltage : the electric potential.
AIR CONDITIONING (COOLING)
Air Compressors Capacity Horsepower Pressure Duty Cycle.
 A multimeter is tool that measures electrical currents. It is a combination of many different measurements in one tool.
BASIC ELECTRICITY AND MAGNETISM
Hybritec Refrigerated/Blower Purge Dryers (Combination Dryer)
TROUBLESHOOTING ELECTRIC MOTORS
S A Griffiths CM42 June 2015 Electrical & Control.
E1 – Electrical Fundamentals
Two Stage Communicating System
CHIGO VRF System Commissioning.
Electricity Cont… Turk.
Electric Current Introduction
E2 Motors and Motor Starting
Compound VCRS.
ELECTRICAL CURRENT.
ECET 110 Innovative Education--snaptutorial.com
Table of Contents Heat Pump Operation Charging Procedure Defrost Board
Electric Current.
Forging new generations of engineers
Electrical Current & Circuits
Ch Electricity II. Electric Current (p ) Circuit
HVAC Schematic Symbols
Error codes for split systems
FIGURE 35-1 If the vacuum hose is removed from the fuel-pressure regulator when the engine is running, the fuel pressure should increase. If it does not.
Electric Current Chapter 34.
ELECTRICITY & MAGNETISM Electrical Resistance (P )
Presentation transcript:

Two-Stage Copeland Scroll Compressors

DESIGN AIR UNIVERSITY External view 1 st stage = 67% 2 nd stage = 100% Used in 17 SEER AC.

DESIGN AIR UNIVERSITY Customer Experience Majority of run 67% Majority of run 67% Delivers steady state cooling. Delivers steady state cooling. Eliminates temperature peaks & valleys from compressor cycling. Eliminates temperature peaks & valleys from compressor cycling. Better humidity control. Better humidity control. Majority of run 67% Majority of run 67% Delivers steady state cooling. Delivers steady state cooling. Eliminates temperature peaks & valleys from compressor cycling. Eliminates temperature peaks & valleys from compressor cycling. Better humidity control. Better humidity control.

DESIGN AIR UNIVERSITY How does it work? Solenoid opens or closes a port on the internal scrolls. Valve is actually a ring that rotates. Ring opens or closes the bypass port. Solenoid opens or closes a port on the internal scrolls. Valve is actually a ring that rotates. Ring opens or closes the bypass port.

DESIGN AIR UNIVERSITY Internal assembly

DESIGN AIR UNIVERSITY 1st Stage Position Solenoid is NOT energized. Port is OPEN. Only 2/3 of scroll compresses refrigerant. The other 1/3 is bypassed thru the open port. Solenoid is NOT energized. Port is OPEN. Only 2/3 of scroll compresses refrigerant. The other 1/3 is bypassed thru the open port.

DESIGN AIR UNIVERSITY Solenoid: “unpowered”

DESIGN AIR UNIVERSITY Port open

DESIGN AIR UNIVERSITY Port open

DESIGN AIR UNIVERSITY 2nd Stage Position Solenoid is energized w 24 volts dc. Ring rotates & closes the port. The entire scroll capacity is delivered. Solenoid is energized w 24 volts dc. Ring rotates & closes the port. The entire scroll capacity is delivered.

DESIGN AIR UNIVERSITY Scroll internals Solenoid operates on DC voltage. Initial inrush is 18 to 28 volts DC. Holding voltage is less. Solenoid operates on DC voltage. Initial inrush is 18 to 28 volts DC. Holding voltage is less.

DESIGN AIR UNIVERSITY Solenoid: “powered”

DESIGN AIR UNIVERSITY Port closed

DESIGN AIR UNIVERSITY Port closed

DESIGN AIR UNIVERSITY Staging Control Wiring Separate wiring to terminal block on compressor shell. Connects integrated compressor control to internal solenoid. Separate wiring to terminal block on compressor shell. Connects integrated compressor control to internal solenoid.

DESIGN AIR UNIVERSITY Checking Solenoid Use your ohmmeter.

DESIGN AIR UNIVERSITY Solenoid Molex Plug

DESIGN AIR UNIVERSITY Molex unplugged

DESIGN AIR UNIVERSITY Placement of probes

DESIGN AIR UNIVERSITY “Good” Ohm reading 32 to 60 ohms.

DESIGN AIR UNIVERSITY Ohm check on Molex plug If resistance is infinite, the solenoid is electrically “open”. Compressor never operates on 2nd stage. The fix? Replace the compressor. If resistance is infinite, the solenoid is electrically “open”. Compressor never operates on 2nd stage. The fix? Replace the compressor.