D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.

Slides:



Advertisements
Similar presentations
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
NIPHAD June 27, 2001 Freya Blekman, NIKHEF Amsterdam 1 NIPHAD meeting June 27,2001 Freya Blekman D0 S ilicon C alibration and R eadout M anagement.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
Collaboration Mtg Cotober 11, 2000 Installation Status Opening Remarks Overview, logistics Recent events, status Outlook, concerns Conclusions Jon Kotcher.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
Dec 7, 1999D0 Dir Review Inst/Com DØ Silicon Hookup and Commissioning p Goals and timeline p Overview of Silicon Read out p “Stand alone” commissioning.
10-25 years of DØ FranceE. Kajfasz1 -France RunII RunIITracking Hard/Soft-ware with.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
D0 Collab Mtg Feb 7, 2001 D0 Detector: Status for Run 2 Wistful reminiscences Near term: Roll in, detector status, next few weeks Latest from Beams Division.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
DoE Review June 6-7, 2000 Installation and Commissioning of the D0 Detector Overview since last review Organization Current status Installation sequence,
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
D0 PMG 4/19/01 Completed Reportable Milestones MilestoneBaselineActualVar. H Half-Wedge Fabrication 20% Complete 10/15/99 0 w 3 Chip Ladder Fabrication.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Technical Design for the Mu3e Detector
10/month is the present production rate 2 FTE + sporadic contributions
Hall A Compton Electron detector overview
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization (Womersley)  Next few weeks & operations (Kotcher)  Detector completion ( Weerts)  Engineering needs (Johnson)

D0 PMG February 15, 2001 Installation update View of collision hall Feb 14, 2001 Feb 6, 2001 Feb 9, 2001

D0 PMG February 15, 2001 Status Overview: SMT  Silicon u Silicon detector (SMT-S & SMT-N) s Installed s Infrastructure (cooling, air) u H-disks ( need 4) s 4 H disks installed u Infrastructure s Cooling system hooked up s More later under electronics

D0 PMG February 15, 2001 Fiber Tracker Status  Waveguide Production and QC continue at a very small scale; use less fiber ( $100K  $50K)  Installation Waveguides u South & North: done  VLPC cassettes Goal (99): projection was Feb 26, 2001 now mid March, due to AFE testing 91 fabricated, 87 characterized, 12 more ready for DØ

D0 PMG February 15, 2001 Status Overview  Central Muons (94 PDT’s) u Commissioning continues u Triggering on tracks  Forward Muon detectors u All commissioned, except B layer pixels; u C layer pixels to finish ( timing)  Gas systems (recircl. & clean) u Being installed LayerPixelsMDT’s A North & South: done North & South: done B North & South: done North & South: done C North & South: done Installation status

D0 PMG February 15, 2001 Status Overview; Electronics  Electronics u Calorimeter s Preamp installation/commissioning underway (55k installed: all done, EN & CC power ready, cooling installed, ES going in) s BLS status –Motherboard: 1250/1200/1020 – need/bare/stuffed – ( no progress: 50/week; should 100/week) –Daughter cards 5000/5000/4220 –Daughter card: 300/week should; but none in last few weeks ( ORACLE SUNYSB ??) –CC, ECN were cold and filled with liquid; now empty –Have 4 out of 12 timing modules ( boards being assembled) s Have read out 4500 channels u Muon s Done

D0 PMG February 15, 2001 u Tracking Electronics s Si Interface Card –144 needed –All boards in hand –144-4 tested and ready s Adapter card –Done fabricating –& installed south side s Analog Front End boards –Remake the PCB’s (148)( second set) –Release Feb 19 –PCB status clear: remake !!! –Have 10 prototype boards –4 stuffed; 2 being tested –Tests look promising, but have to continue –Latest release date for stuffing March 19 s MCM going –At FNAL 2220; need 2200 s Power supplies –Being installed Status Overview; Electronics SMT Fiber tracker

D0 PMG February 15, 2001 Si Sensor To and from DAQ Description # need # have Location HDI with SVX --in SMT 8’ Low mass cables & clock cables H H SMT support cylinder to CC face Adapter card 144* 4 Installed on CC face ( 144*2) 19’-30’ High Mass Cable; 3M/80 Conductor & clock cables 144* 4 144*4 ( found all) ~288 (south) installed Interface card 144 east & west side of CC; going in 25’ High Mass; 3M/50 Conductor 144* 4 144*4 ( missing, reorder or spares) To sequencer; 3* 144 in SMT readout front end system status

D0 PMG February 15, 2001 Description # need # ready Location Waveguides from CFT (axial & stereo), CPS, FPS - CFT & CPS DONE From face of CC to platform VLPC cassettes9987platform AFE 8 with 8 MCM’s; readout axials & stereo 136 incr. 10 proto problem On VLPC cassttes MCM; multichip module with SIFT & SVX chip On AFE xx boards AFE 12 read out stereo, CPS, FPS 62 Progress design On VLPC cassettes Mixer boards (trig) 20 2 end of March; Prototyp es on way Digital part (trig) & arriving platform Fiber tracker readout front end system status DAQ AFE 8 VLPC AFE 12 VLPC CFT, CPS, FPS L1 Trig Infrastructure installed

D0 PMG February 15, 2001 Status Overview  Trigger u Final hardware arrival is a worry  Level1:  CFT trigger; digital parts arriving March  CAL few towers on March 1 & run; delivery in March  Muon ~2octants in central & 1 in each end; arriving in March & April  L2 VME-Alpha boards still a concern. Looking better: 25 produced; 3 partially working; 6 completely working. Expect another 2 to rise from dead.  Three approaches:  Effort in CD continues (THANKS)  Another production run. Have parts for 12 boards.  New design completely…..  L3 board production concern  Abandoned high speed SIB design on PCI card with high bandwidth IN and OUT  Goal now is to achieve 50 to ~150Hz in April  Two critical boards (SIB, VBDi). SIB have boards, VBDi going out  Online u In use at low rate, not on critical path

D0 PMG February 15, 2001Summary  Concerns u Installation: Mechanically complete u Electronics delays are THE concern for realistic commissioning with beam s Vendor delays, parts availability  Outlook u “Detector” will be ready for beam on March 1 u All detectors will be installed u Not completely hooked up u Limited data rate in DAQ ~few Hz u Will need TIME after start up to complete the detector electronically ( see later)

D0 PMG February 15, 2001 Level 3 overview SB o o o SB o o o SB o o o SB o o o VRC (1 of 8) VBD o o o VBD o o o ETG Data Collection Paths (8 * 2 * 48 MB/s) Primary Fiber Paths (8 * 100 MB/s) L3 data distribution to Level 3 farm event tag path Node Level 1,2 Trigger Info