GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Advertisements

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectI&T&C Particle Beams - Pre PDR Presentation– Oct. 2, 2001 Gary Godfrey1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST Large Area Telescope:
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
I&T&C Organization Chart
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope Instrument Science Operations Center
Integration and Test Organization Chart
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Integration and Test Organization Chart
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager Integration, Test, and Calibration

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom2 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS Reliability & QA D. Marsh WBS Environmental Test Manager M. Lovellette Online Manager R. Claus Science Verification, Analysis, and Calibration E. do Couto e Silva Particle Test Manager G.Godfrey Integration, Facilities, Configuration, and Test O.Millican (Acting) Instrument Operations Coordinator S. Williams Mechanical Ground Support Equipment TBD I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom3 Integration and Test Subsystem Work Breakdown I & T Management –Coordinate I & T planning –Develop LAT I & T plan, to ensure flow of verification test activities Reliability and Quality Assurance –Collect subsystem verification test results –Manage LAT verification test assurance activities I & T Preparation - Integration, Facilities, Configuration, and Test, Particle Test, Environmental Test, Science Verification Analysis, & Calibration. Prepare LAT I & T facilities –Develop calibration equipment –Develop Verification matrix and particle test plan –Develop environmental test plan –Develop Calibration plan

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom4 Integration and Test Subsystem Work Breakdown - 2 EM1 Model I&T&C-Integration, Facilities, Configuration, and Test, Particle Test, Science Verification Analysis, & Calibration. (Currently no funding) - Coordinate I&T&C tests with subsystem tests. - Use subsystem calibration data to tune up I&T&C calibration program. - Run cosmic rays on “assembled” EM1-EM2 unit at SLAC Calibration Unit I & T -Integration, Facilities, Configuration, and Test, Particle Test, Science Verification Analysis, & Calibration. –Prepare for and integrate Calibration flight modules. –Prepare for and test QU with cosmic rays, positron, photon, and hadron beams. – Produce LAT calibration products for SAS from QU beam data Flight LAT I&T- Integration, Facilities, Configuration, and Test, Particle Test, Environmental Test, Science Verification Analysis, & Calibration. –Prepare for integration of flight LAT; fabricate and test all mechanical GSE –Mechanically integrate flight LAT –Plan for and execute environmental verification testing –Support planning and execution of Observatory I&T

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom5 Integration and Test Subsystem Work Breakdown - 3 Produce a Working Instrument! Mission I&T Support- Integration, Facilities, Configuration, and Test, Particle Test, Environmental Test, Science Verification Analysis, & Calibration.

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom6 Integration, Test, and Calibration Activities I & T “subsystem” is focal point of LAT integration activities –I & T & C team plans and manages activities. –TKR, CAL, and ACD subsystem teams provide support for Integration & Calibration. Total effort involves: –I & T & C Subsystem LAT integration planning and management. Mechanical integration and GSE and EGSE development. Plan Environmental tests and Execute. Calibration particle beam and test equipment development. Ground Verification and Calibration of LAT. Commissioning of LAT in orbit. Deliver a Working Instrument to IOC. –Mechanical Systems Environmental test support. LAT qualification testing analysis. –Electronics and Data Acquisition LAT electrical integration. Performance test planning and execution. Flight software verification testing. –IOC Electrical GSE development, including calibration DAQ system LAT performance test planning. EGSE, and GSE operations and support during LAT I & T & C. –Science Analysis Software Calibration analysis software development.

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom7 Integration Planning Activities LAT integration planning –Planning for subsystem integration has been included in development of interfaces and LAT design integration –Developing concepts for integration EGSE and GSE. LAT integration facilities –New clean room facilities have been built at SLAC for GLAST –Facilities include I&T infrastructure Clean room with high bay Storage for flight hardware Environmental Tests –LAT thermal tests at SLAC. –Full suite of environmental tests at NRL. Observatory integration support –I&T&C team has been involved with mission in investigating options for observatory integration. –LAT and observatory require combined EGSE, GSE and coordinated plans environmental test plans. Concept of LAT Integration Frame

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom8 Integration and Test Facility at SLAC

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom9 I & T Responsibility LAT I&T&C Verification and Calibration Flow VibeRandom vibrate/sine sweepAccAcceptance test level AcAcousticPFQProto-flight qual test level T-CThermal-cycle at 1 atmosphereQualPrototype qual test level T-VThermal-vacuum cycle testProof.Load test at proof level EMIElectro-magnetic interference testEMEngineering Model Engineering model testsTMThermal model Qualification unit testsMMMass model Flight unit/spare testsGSEGround support equip. I&T: Beam test QU – 4 towers Calibration Elec: EM2 TEM, DAC, SIU TKR: QA-B from TKR fab CAL: F1-2 from CAL fab CAL: QA-B from CAL fab TKR: F1-2 from TKR fab Calibration Unit - QU Elec: Qual SIU for EGSE Obs: Vibe/Ac Observatory Acc Obs: T-V Observatory Acc Obs: EMI Observatory Acc Mech: Flt Rad’s from Mech I&T: LAT Calibration Airplane testCal I&T: LAT Environmental tests (NRL)Acc TKR/CAL: F1,2 from QU I&T: LAT Assembly, Test Acc Elec: Flt SIU’s to LAT I&T&C CAL: F3-16 from CAL fab TKR: F3-16 from TKR fab Mech: Flt Grid from Mech ACD: ACD to LAT I&T Flight LAT - FU

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom10 EGSE Areas of Responsibility GLAST Mission Scott Lambros LAT –Large Area Telescope Peter Michelson EGSE –Electronics Ground Support Equipment Gunther Haller I&T&C –Integration and Test and Calibration Elliott Bloom IOC –Instrument Operation Center Scott Williams EGSEI&T&CIOC Online Mission LAT

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom11 Tests & EGSE Configurations SIS Spacecraft Interface Simulator IPS Instrument Power Supply EM1- I&T&C only use data EM2 non-flight hardware QU –Qualification unit QU QU DAC non-flight hardware

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom12 LAT Performance Specifications Science Verification, Analysis and Calibration (SVAC) System Low Level CalibrationHigh Level CalibrationScience Verification Calibration Products SAS Calibration Requirements SVAC Plan LAT Verification Plan (LAT-SP ) Science Requirement Document (GLAST-00010)

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom13 Low Level CalibrationHigh Level CalibrationScience verification Effective Area Energy Resolution Point Spread Function Field of View Time Accuracy Background Rejection Deadtime Source Location Point Source Sensitivity GRB,AGN location GRB,AGN notification time ACD Detection Efficiency (CT1) High Threshold detection (CT2) TKR Single Tower Alignment (CT4) Multiple Tower Alignment (CT5) LAT & Observatory Alignment (CT6) CAL PIN Diodes Optical Gain (CT10) Light Attenuation (CT11) Light Asymmetry (CT12) ACD Pedestals (CT3) TKR Noisy Strips (CT7) Dead Strips (CT8) Time-Over-Threshold (CT9) CAL Pedestals (CT13) Energy range: Electronic Gain (CT14) Energy range: Electronic Gain Occupancy (CT15) Energy range: Integral non linearity (CT16) Energy range: Differential non linearity (CT17) Subset of performance calibrations Subset of baseline calibrations SVAC Data (being reviewed by subsystems)

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom14 Particle test Verification Matrix Requirements flow down from –LAT Science Requirements Document – Level II Specification LAT-SS (found in LAT-SS-9.1) –Summarized by the Instrument Scientist (Steve Ritz)

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom15 Cosmics in Airplane (Psuedo Balloon Flight for Complete Flight Instrument, but Even Better) Full LAT in an airplane (during airplane ride to NRL thermal vac ?) L1T trigger rate measured in single tower during Balloon Flight At 25,000 feet verify the flight hardware at orbital L1T rates –~25 (BFEM size towers) x 540 Hz = 13.5 kHz –DAQ doesn’t crash –Software filter handles the rate and produces the expected downlink rate –Livetime is accurately measured At 35,000 feet test the flight hardware at > orbital L1T rates –~22 kHz saturates the LAT trigger –DAQ should not crash Altitude [Ft] BFEM L1T [Hz] Notes 025Ground 25,000540Same rate as in orbit 35,000900Airplane flight 50, Pfotzer max 127,000540~Orbital rate

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom16 Environmental Test Matrix Rev date: 1 Oct 01 Acc LAT Modal Survey M

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom17 NRL Environmental Test Facility Spacecraft Acoustic Reverberation Chamber –Sound pressure level of 153 dB through a range of 32-10,000 Hz –30,000-lb force electrodynamic vibration exciter Thermal High-Vacuum Chamber Facility –18 ft diameter x 32 ft in length –Pressures below 1x10 -6 Torr

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom18 NRL Environmental Test Facility Spacecraft Vibration Test Facility –Largest table: 35,000-lb Spacecraft Vibration Test Facility –Largest table: 35,000-lb continuous sine or rms random vibration output and 105,000-lb peak random vibration –Frequency range 5 to 2000 Hz EMI Test Chamber

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom19 9:30 - 9:55 AM Bloom Intro/Overview 9: :10 AM Grist - Top Level Cost Estimate, Top Level Schedule 10: :30 AM Marsh - QA/Reliability 10: :50 AM Claus - Online 10: :10 AM Williams - IOC Coordination 11: :30 AM Millican - Integration, Facilities, Configuration, and Test 11: :40 AM Break 11: :00 PM Godfrey - Particle Test 12: :20 PM Lovellette - Environmental Test 12: :40 PM do Couto e Silva - Calibration, Analysis and Science Verification 12: :50 PM Bloom - Summary/Open issues and concerns. 12:50 - 1:30 PMDiscussion prePDR Schedule