NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.

Slides:



Advertisements
Similar presentations
Don Willis Federal Aviation Administration Washington, DC March 30, 2004 There are no benefits to compromising safety…only dire consequences Assessment.
Advertisements

Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Heather Bell GMFIR Vancouver November 9, 2010 NAV CANADA.
NY/NJ/PHL Metropolitan Area Airspace Redesign Implementation Update Presentation to: Eastern Region Aviation Weather Conference By: Don Castonguay Air.
Continuous Climb Operations (CCO) Saulo Da Silva
MIT ICAT MIT ICAT M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Antony D Evans Prof J-P Clarke
By: Steve Lang Date: September 2007 Federal Aviation Administration Wake Vortex R&D Status Briefing NBAA Convention.
Measures to increase ATC capacity. a) taking all reasonable steps to fully exploit the existing capacity of the air navigation system; b) developing plans.
Washington DC Metroplex March 5, 2015 Implementation.
MIT Lincoln Laboratory Evans benefits ARAM1 jee 6/4/2015 Assessment of Aviation Delay Reduction Benefits for Nowcasts and Short Term Forecasts James Evans.
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
1 Federal Aviation Administration Mid Term Architecture Briefing and NextGen Implementation 1 Federal Aviation Administration Mid Term Architecture Briefing.
Presented to: By: Date: File: apo130\Airport Efficiency\TAER SAER Updated Briefing(2).ppt 1030 Federal Aviation Administration Presentation of System Airport.
AIR TRAFFIC ROUTES.
Federal Aviation Administration FOR OFFICIAL USE ONLY (Public availability to be determined under 5USC 552) Data Communications Program DCL Benefits Modeling.
Federal Aviation Administration 0 0 Required Navigation Performance (RNP) in the United States Presentation to: US/Europe International Aviation Safety.
Federal Aviation Administration Valuation of NextGen Capacity Benefits A Consumer Surplus Approach to the Monetization of NASPAC Results For: INNOVATIONS.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
1 July 18, 2011 Runway 19 Dalton Departure Procedure Flight Crews requesting the Dalton 19 Departure MUST possess the chart and adhere strictly to the.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Study Continuous Climb Operations
Ministry of Land, Infrastructure, Transport and Tourism Information for redesign of airspace composition Yoshimichi HAMAHATA ATC division, JCAB THE EIGHTH.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Airport Noise Compatibility Study Group NOISE ABATEMENT STRATEGIES Alternatives and Results New Zion Baptist Church Neighborhood Orientation and Discussion.
Presented to: By: Date: Federal Aviation Administration Making Good Decisions in the Environmental Review Process 2012 Pacific Aviation Directors Workshop.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
A Perspective on NASA Ames Air Traffic Management Research Jeffery A. Schroeder Federal Aviation Administration* * Formerly NASA Ames.
. Traffic Flow Management System Benefits Flexibility for Future Growth: TFMS provides a modern software architecture to meet future growth and support.
Presented to: NWS Aviation Weather Users By: Danny Sims, Manager of Traffic Flow Management Weather Programs, FAA Date: 18 November 2008 Federal Aviation.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Situational Awareness Numerous aircraft and operational displays, when combined with effective and efficient communications and facilities, provide Air.
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Neighbor’s Committee Meeting Paul L. Shank P.E., C.M Chief Engineer July 14, 2015.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
East Hampton Airport Safety, Noise and Operational Management Plan Peter J. Kirsch December 1, 2011.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
NY Airport Delay Reduction Presented by Ralph Tamburro.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Federal Aviation Administration Newark Project Overview January 2009.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
NextGen Next Generation Air Transportation System
Aviation System Capacity Frank J. Aguilera National Aeronautics & Space Administration.
How do we mitigate weather impacts to the NAS?
Presented to:GMU System-Wide Modeling Workshop By: Joseph Post, ATO NextGen & Ops Planning Date: 10 December 2008 Federal Aviation Administration FAA System-Wide.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
1 Federal Aviation Administration NBAA HND October 2011 Areas D, F and TMU Briefing 9/26/ /2/
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
Using Simulation in NextGen Benefits Quantification
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Presented to: By: Date: Federal Aviation Administration Quantification of Benefits of Aviation Weather A discussion of benefits Friends and Partners in.
RAPT EAK 6/18/2016 MIT Lincoln Laboratory Route Availability Planning Tool: A case study Rich DeLaura and Shawn Allan
Presented to:Nextor NAS-Wide Modeling Workshop By: Joseph Post, NextGen Systems Analysis Date: January Federal Aviation Administration NextGen.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Teterboro Airport Part 150 Noise/Land Use Compatibility Study
Workshop on preparations for ANConf/12 − ASBU methodology
FAA Air Traffic Organization (ATO)
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Data Link Advanced Operations
Presentation transcript:

NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign Manager Date: March 14, 2008 Federal Aviation Administration

Federal Aviation Administration 2 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Record of Decision Issued – September 5, 2007 The Selected Project for this study is the Integrated Airspace Alternative with the Integrated Control Complex (ICC) with mitigation. The study took over 9 years culminating in a Record of Decision (ROD) Procedural adaptations for noise abatement (mitigation measures) was also implemented Draft Environmental Impact Statement DEIS was published in December 2005 Comments were taken on the DEIS and some of those comments were used in developing the noise mitigation measures In April of 2007 the FAA identified its Preferred Alternative and provided analysis of the mitigation measures Final Environmental Impact Statement (FEIS) was published on August 3, 2007

Federal Aviation Administration 3 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Implementation Overview Planning has already started Initial changes were implemented on December 19, 2007 Expected timeframe for completion five years Implementation approach was broken into four stages in the ROD: Changes in N90, ZNY, PHL Changes outside Procedural changes Integration of ZNY, N90 Boundary changes Transfer of Sectors Stage 1 Stage 2 Stage 3 Stage 4

Federal Aviation Administration 4 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Newark Departure Headings Runway 22L/R Moderate Demand Heavy Demand Existing Dispersal

Federal Aviation Administration 5 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Red ’ Green Blue ’ Newark Liberty International Airport December 19, 2007 AM Dispersal Headings 215 and 239

Federal Aviation Administration 6 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Philadelphia Departure Headings Runway 27L/R Dispersal Headings Existing Dispersal

Federal Aviation Administration 7 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Philadelphia International Airport Runway 27 Departures Dispersal Headings December 19, and 268

Federal Aviation Administration 8 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Philadelphia Runway 9L/R Departures Dispersal Headings Existing Dispersal

Federal Aviation Administration 9 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Philadelphia International Airport Runway 9 Departures Dispersal Headings December 20, and 096

Federal Aviation Administration 10 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Implementation - A Work in Progress Beyond the implementation of dispersal headings at Philadelphia and Newark, which were implemented on December 19, 2007, we do not anticipate any project elements to be implemented that will create additional noise impacts prior to the Fall of The use of dispersal headings will be refined and adjusted to meet traffic demands while maintaining the integrity of the environmental process. We are currently in a detailed planning process of further implementation steps.

Federal Aviation Administration 11 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Stage 2 Expanding the west gate for NY departures Opening the west gate for JFK departures Allowing stacked departures at the departure fixes Expanding the use of terminal separation rules Providing flexible use of the arrival airways PHL Establishing a new arrival route into PHL Third westbound departure fix for PHL

Federal Aviation Administration 12 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Increased Number of Jet Routes Reduces Delay Selected Project: Increased number of jet routes Increased number of access points Less competition for departures means decreased delay Current System: Few jet routes for departures Access is limited Competition for resources means increased delay

Federal Aviation Administration 13 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 JFK Access to Westgate Decreases Complexity Selected Project: Current System: JFK traffic crosses through departures from LGA, EWR, TEB, etc. Long ground delays necessary to maintain safe and orderly flow of traffic Stacked flows are more efficient and less complex JFK flights

Federal Aviation Administration 14 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Westgate Stage 2 Airspace Redesign Initiatives Increase ELIOT’s potential throughput capacity Eliminate RBV crossing to J60/J64 Reduce MIT at Westgate Reduce vectoring in ZNY39 Support potential throughput increase by - Dual J80s - ZNY sector vertical splits - Reroute from Northgate Reduce enroute MIT Reduce NY metro departure delay 2 nd ELIOT for J60/J64 departures Create new fix west of ELIOT Route offset for IAD arrivals Apply Terminal separation rules up to FL230 Separate route for IAD arrivals JFK access to ELIOT Separate route for CDA/BWI arrivals Increase PARKE’s potential throughput capacity Increase BIGGY’s potential throughput capacity Allow easy offload from WHITE Realign Westgate fixes Create new fix east of BIGGY and/or

Federal Aviation Administration 15 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Stage 3 and Stage 4 Stage 3 Adding a third airway to the north gate Stage 4 Creating a new jet airway for departures to the west Enabling dependent instrument arrivals to the parallel runways at EWR and the required shift of the arrival streams into the NY/NJ area Creating a south gate for departures out of the NY/NJ area

Federal Aviation Administration 16 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Increased Number of Jet Routes Reduces Delay Selected Project: Increased number of jet routes Increased number of access points Less competition for departures means decreased delay Current System: Few jet routes for departures Access is limited Competition for resources means increased delay Stage 2

Federal Aviation Administration 17 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Example of Delay Savings with New Usage of Runways Selected Project: Dual arrivals to EWR 04/22 Increased use of EWR 11 Efficient use = reduced delay Current System: Conflicting flows restrict use of runways Inefficient use of runways = increased delay Dependent IFR approaches Dual Arrivals EWR

Federal Aviation Administration 18 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Noise changes: Raw Data Map – Selected Project Raw Change in Db from Future No Action with Mitigation Number of Census Points

Federal Aviation Administration 19 NY/NJ/PHL Metropolitan Area Airspace Redesign March 14, 2008 January 7, 2008 Next Steps Continue to address and resolve legal and political challenges Develop full implementation team Continue full RNAV implementation Implement terminal separation standards in former EnRoute airspace sectors Continue safety assessment of all changes Develop Airspace design activities with adjacent facilities that enhance the benefits of integration