THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.

Slides:



Advertisements
Similar presentations
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Advertisements

Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
THEMIS Mission CDREFI- 1 UCB, June 14-18, 2004 THEMIS Electric Field Instrument (EFI) Mission CDR The THEMIS EFI Team.
THEMIS Instrument CDR 1 UCB, April , 2004 EFI Axial Booms Thermal Christopher Smith Thermal Engineer
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
THEMIS FDMO CDR Peer Review − FOT Activities 1June 1-2, 2004 FOT Activities Mark Lewis.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
DSL Distributed Systems Laboratory ATC 23 August Model Mission: Magnetospheric Multiscale (MMS) Mission Goal “To study the microphysics of three.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
EFW operations Nordic Cluster Meeting, Uppsala, Aug 2011 Cluster EFW Operations.
THEMIS EOMP ReviewEFINov 19, 2009 THEMIS Electric Field Instrument (EFI) Dr. John Bonnell Space Sciences Laboratory UC Berkeley.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
THEMIS FDMO CDR Peer Review − L&EO and Normal Operations 1June 1-2, 2004 L&EO and Normal Operations Manfred Bester.
THEMIS ESA SWT ESA- 1 UCB, Aug ESA In-Flight Calibration and First Results J. McFadden, C. Carlson, D. Larson UC Berkeley SSL.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
Thermal Subsystem Peer Review Objective: To maintain all components of the space craft within their specific temperature range.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Instrument PER 1/21/ EFW Instrument Calibration John W. Bonnell Space.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS MISSION PDRMISSION DESIGN- 1 UCB, November 12-14, 2003 Mission Design Dr. Sabine Frey University of California - Berkeley.
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
EFW SOC DATA John Wygant SWG June Redondo Beach.
THEMIS SOCScience Data Products − 1March 29, 2006 Science Data Products Timothy Quinn.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
Solar Probe Plus FIELDS RFS Peter R. Harvey. RFS FSW Requirements.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
Welcome to Uppsala! Thursday May 18 13:00, room Å :00 Coffee (17:30 Dinner) Friday May 19 09:00, room Å :00 Coffee splinters (other locations)
RBSP MCR EFW- 1 JHUAPL, Jan 30, RBSP-EFW Radiation Belt Storm Probe Electric Field and Waves Instrument (EFW) PI: Prof. John Wygant, UMN
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Engineering Peer Review Overview Dr. John W. Bonnell and the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
THEMIS IDPU FSW 6/23/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey.
THEMIS Mission CDREFI- 1 UCB, June 14-18, 2004 EFI Subsystem Design, Fabrication, and Test Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Science Overview Professor John R. Wygant, PI University.
THEMIS FDMO Review Mission Design Update − 1 October 5, 2004 Mission Design Update Sabine Frey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 693 EFW Concept of Operations (ConOps) John Bonnell Space.
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Spacecraft Interface and I&T
Science Requirements The FGM shall measure DC and low frequency perturbations of the magnetic field  see performance requirements The FGM shall measure.
Boom Electronics Board (BEB)
Operational Description
THEMIS INSTRUMENT TRAINING
THEMIS Electric Field Instrument
Launch and On-orbit Checkout
Integration & Test Instrument Operations Coordination
Presentation transcript:

THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept

THEMIS Engineering Peer Review 2 UCB, October 15-16, 2003 Operational Concept (1) Deployment and Commissioning P3-P5 EFI deployed ~Launch+1 mo., after initial orbit placement. P1-P2 EFI deployed ~Launch+3 mo., after raise to final orbits, one month prior to beginning of science season (WD-90). On-board DC functional test to ensure state-of-health of EFI on P1 and P2 prior to ascension. SPB deployed alternately in pairs to 5, 10, 12, 14, 16, and 18 m. Each deploy step takes less than 20 min. (fits max. contact duration of 30 min.). AXB deployed singly, on same orbit if no anomaly (TBR). Sphere potentials, differential E-field, and housekeeping data taken in Diagnostic Mode (TBD) to allow monitoring of deployment, EFI system response, and SC potential structure. Multiple Slow Sweeps of EFI bias settings (~1 hr duration) run on orbit after deploy step to probe EFI system response and allow for bias optimization. Data taken in Diagnostic Mode. After deploy, Slow Sweeps scheduled with TBD cadence to update biasing as sensor surface properties stabilize.

THEMIS Engineering Peer Review 3 UCB, October 15-16, 2003 Operational Concept (2) Operations Slow Sweeps and diagnostic data taken several times per year, upon first entry into a new plasma regime, and after long-duration eclipses to maintain optimal bias settings and monitor EFI state-of-health. EFI instrument mode set by ~30 registers on BEB; a typical mode will be specified with ~200 commands, valid over a typical one month period, once deploy and commissioning are completed. Data Validation Both sphere potentials and differential E-field data gathered in all waveform modes, allowing for initial verification of E- field data. Intercomparison of Eperp and –VxB from ESA and FGM to establish offsets and boom shorting effects.

THEMIS Engineering Peer Review 4 UCB, October 15-16, 2003 Operational Concept (3) Data Rates Slow Survey –Spin-fit radial and axial E-fields; SC potential (via ptcls). –Filter Banks. Fast Survey –3 E-field at 32 S/spin; 2-3 sphere potentials at 8 S/s. –Filter Banks and FFT spectra. Particle Burst –3 E-field at 128 S/s; 2-3 sphere potentials at 32 S/s. –Filter Banks and FFT spectra. Wave Burst –3 E-field at 1024 or 4096 S/s; 2-3 sphere potentials at 256 or 1024 S/s. –Filter Banks and FFT spectra. Diagnostic Mode (TBR) –E-field and sphere potentials at >= 16 S/s. –Bias control levels at >= 1 S/s.