G. Dissertori ETH Zürich 10.11.2004 ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
André Augustinus 16 June 2003 DCS Workshop Safety.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
The Detector Control System for the ATLAS SemiConductor Tracker
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
G. Dissertori ETH Zürich ECAL ESR - DCS 1 ECAL Detector Control System G. Dissertori Electronics System Review, Oct 9, 2003 Status report Trigger/DAQ.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
G. Dissertori ETH Zürich ECAL Cooling Review - DCS 1 ECAL Detector Control System G. Dissertori ECAL Cooling Review, Nov 4, 2004 Status report.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Detector Control and Safety System for the Electromagnetic Calorimeter.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Tales and mysteries of PVSS in the land of ECAL Alison Lister ETHZ Alison Lister
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
FPix DCS Subgroup Report
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
ATLAS MDT HV – LV Detector Control System (DCS)
CMS-ECAL DCS Prototype
CMS-ECAL Front-End monitoring Matteo Marone
RPC Detector Control System
TPC Detector Control System
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

G. Dissertori ETH Zürich ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS CMS DCSECAL DCS

G. Dissertori ETH Zürich ECAL - DCS 2 Outline u Overview u Precision Temperature Monitoring (PTM) u Humidity Measurement (HM) u ECAL Safety System (ESS) u PVSS Monitoring (and related issues) u Note : For details on the PTM/HM and ESS hardware (sensors, readout) I refer to the DCS ESR, May 04!

G. Dissertori ETH Zürich ECAL - DCS 3 Overview ECAL module crystal PCBs for VFE and FE cooling LV, HV Laser system Offline, DAQ Data Bases Data Bases PVSS prec. temp. sensor Monitoring ESS temp. sensor + WLD Monitoring Safety, PLC interlock cooling, faults humidity sensor

G. Dissertori ETH Zürich ECAL - DCS 4 SM10

G. Dissertori ETH Zürich ECAL - DCS 5 PTM Precision Temperature Monitoring - PTM S. Zelepoukine, IHEP Protvino and ETHZ

G. Dissertori ETH Zürich ECAL - DCS 6 PTM n Requirements: u very high precision temp. monitoring : check stability of water cooling system, to stay within deg C. l no hardwired feedback to cooling u relative precision : 0.01 deg C u one sensor/module on thermal screen and grid u main water IN, main water OUT

G. Dissertori ETH Zürich ECAL - DCS 7 Patch panel Patch panel Thermal screen Grid Sensor probes location inside SM: Probes of type 1 (N = 4 + 4)Probes of type 2 (N = 2) Number of probes (per SM): = 10 Each probe has its own signal cable – twisted pair M1M2M3M4 PTM : Sensor location

G. Dissertori ETH Zürich ECAL - DCS 8 PTM : Readout - Layout ELMB Cur.src PC / PVSS ECAL UXC55 balcony: Counting room 20x2 STP cables CANbus cables ~ 500 sensors (NTC thermistor Betatherm; 25C; indiv.calibrated; better than 0.01C rel.accuracy) Readout electronics: ELMB based; ELMB reads voltages and converts to digital data, then sends data via CANbus. DC-DC converters DC Power supplies DC Power supplies Monitoring application: PVSS based; data storage/archiving, visualization/trending, warnings/alarms. Network access Galvanic isolation

G. Dissertori ETH Zürich ECAL - DCS 9 H4

G. Dissertori ETH Zürich ECAL - DCS 10 Recent Results n First results from SM10 at H4: u Sensors, sensor probes, read-out practically final u Reading 4 sensors on grid, 3 sensors on thermal screen, and Water IN/OUT l One sensor lost, most likely due to bad intermediate connection inside SM before PP u Since about one week : installed 2 sensors on backplate l Above M1 and M4

G. Dissertori ETH Zürich ECAL - DCS 11 Cooling Stability Zoom

G. Dissertori ETH Zürich ECAL - DCS 12 M4 M3, M2 M1 Grid Thermal screen Water - IN 0.01C M1 M4, M3 Cooling stability = 0.01C (incl. day/night oscillations) Zoom :

G. Dissertori ETH Zürich ECAL - DCS 13 Just to show uncompressed (in time) data… 10 min Grid Thermal screen Water - IN Ambient Div = 1.0C Div = 0.01C

G. Dissertori ETH Zürich ECAL - DCS 14 M2 M1, M3 M4 M1 M2 M3 M M1 M2 M3 M Inside the electronics compartment From ESS, see later…

G. Dissertori ETH Zürich ECAL - DCS 15 Conclusions on PTM n Cooling stability: u Achieved 0.01 C in the long-term, including day/night variations u Have a monitoring application, Serguei is working on a more “final” version… n Temperatures on outer surfaces u Recent measurements performed by Serguei u Is heating towards outside (or inside, depending on orientation) an issue? For other detectors? For other SMs ? u As next step, Serguei will move external sensors to lateral surfaces… n Hardware u Resolve issue of immersion probes u Intermediate connections will not be there any more

G. Dissertori ETH Zürich ECAL - DCS 16 HM Humidity Monitoring - HM S. Zelepoukine, IHEP Protvino and ETHZ

G. Dissertori ETH Zürich ECAL - DCS 17 Requirements n For HM we want to u Measure humidity level inside modules, precision about 5% n Sensors u One per module u UPS600 from Ohmic Instruments, resistive type, cheap u Transducers also from Ohmic Instr, n Readout u Same principles as for PTM : ELMB + Canbus to PC

G. Dissertori ETH Zürich ECAL - DCS 18 RH cable shield grounded to SM10 M1, M3, M4 M2 (conn.broken) Amb1/2 (SM10) Amb_3 (DCS rack) RH – inside SM10 RH -- ambient water out water in Water temperatures Ambient temperatures

G. Dissertori ETH Zürich ECAL - DCS 19 HM : Conclusions n A complete SM has been equipped with RH sensors and readout (SM10 in H4 testbeam) u Non-calibrated sensors/transmitters were used for SM10 l nevertheless acceptable channel to channel variations (2-4 %RH). u The RH readout chain “sensor-transmitter-ADC” is rather sensitive to the grounding of the HM signal cable shield: changing the grounding point can result in an offset for the measured RH value equal to about 10% RH l A detailed lab study is planned for investigating HM grounding issues. Also we would like to make the sensor excitation voltage frequency as low as possible (now = 440 Hz) – this will certainly require to recalibrate all transmitters at the new (lower) frequency. u A humidity generator has been ordered and now delivered. Building a laboratory setup for automated RH sensor/transmitter calibration is in progress now.

G. Dissertori ETH Zürich ECAL - DCS 20 ESS ECAL Safety System - ESS formerly : TSS (Temperature Safety System) Belgrade group, ETHZ See also CMS NOTE

G. Dissertori ETH Zürich ECAL - DCS 21 Three interconnected system layers: ESS FE Layer Temperature conversion and channel multiplexing - ESS FE Layer, ESS PLC Layer Data acquisition, data processing and interlock generating - ESS PLC Layer, ESS Soft Layer System monitoring and system control - ESS Soft Layer; Schematic layout RS485 ?

G. Dissertori ETH Zürich ECAL - DCS 22 NTC 470 Ohms Sensors : NTC 470 Ohms thermistors (EPCOS) positioned in pairs at each measurement point ( “Twin” sensors ). 2x twisted pair cable SCEM = SCEM = , 2x2x0.05mm2, PETP insulation outside diameter 2.9mm, PETP insulation ESS : Sensor Location

G. Dissertori ETH Zürich ECAL - DCS 23 Siemens S Family PLC System for ESS: ESS : PLC

G. Dissertori ETH Zürich ECAL - DCS 24

G. Dissertori ETH Zürich ECAL - DCS 25 Experience up to now n Excellent performance of ESS u No problem during SM10 running up to now u Interlock tests at the startup were successful u Afterwards, no interlock up to now

G. Dissertori ETH Zürich ECAL - DCS 26 PVSS Monitoring and Control S. Zelepoukine, P. Milenovic, R. Ofierzynski, F. Beaudette, A. Lister, R. Gomez-Reino, F. Glege Also : Thanks to S. Schmeling / JCOP See also talk by Bobby… Will also give a detailed presentation at a future JCOP meeting….

G. Dissertori ETH Zürich ECAL - DCS 27 n Have implemented the monitoring of the following subsystems: u Temperatures from ESS u Water Leakage Detection System (via ESS) u Temperatures from PTM u Humidity (HM) u Cooling System (temperatures, flow, pressures) u Status of Laser System u HV and LV n Not implemented u Temperatures from DCUs u Storage to ORACLE DB

G. Dissertori ETH Zürich ECAL - DCS 28 : Prototype for ECAL n First complete set-up of PVSS DCS system u At H4, includes: u PTM - HM - ESS - LV - HV - Cooling - Laser u + Supervisory system u Every application implements a Finite State Machine u Based on PVSS II, v.3, and the JCOP framework u Distributed system (Windows XP) on 3 PCs : l 1 : Supervisor, Laser, Cooling l 2 : HV, LV l 3 : PTM, HM, ESS

G. Dissertori ETH Zürich ECAL - DCS 29 : Data Logging u For the moment, all data go to the PVSS archive (proprietary) u Not easy to get data out (apart trending, which is ok) l not foreseen as final solution (!) u Done because of pressure to get the FSM at H4 etc running u On the long term : ORACLE u A new expert is joining the efforts (Rick Egeland, Minnesota) l He will try to help us setting up the commun. with ORACLE and to develop scripts to easily retrieve data u But not more to say for the moment…..

G. Dissertori ETH Zürich ECAL - DCS 30 Major Issues n During development : u Already preparing for the final ECAL application u Some debugging of Framework tools, in particular FSM, was necessary. Thanks to C. Gaspar for her feedback. u Suffered from missing documentation of Framework n Note : The continuous and friendly help by S. Schmeling was absolutely essential !! Thanks!! n HV - LV: u Major problems with the connection to CAEN crates u See dedicated discussion on this topic

G. Dissertori ETH Zürich ECAL - DCS 31 Supervisory System : 1

G. Dissertori ETH Zürich ECAL - DCS 32 Supervisory System : 2

G. Dissertori ETH Zürich ECAL - DCS 33 Supervisory System : 3

G. Dissertori ETH Zürich ECAL - DCS 34 HV Application

G. Dissertori ETH Zürich ECAL - DCS 35 LV Application

G. Dissertori ETH Zürich ECAL - DCS 36 Cooling Application Communication With cooling System via OPC Note: This application only monitors user can not operate the cooling system from here !

G. Dissertori ETH Zürich ECAL - DCS 37 ESS Application

G. Dissertori ETH Zürich ECAL - DCS 38 Conclusions n Hardware u PTM / HM / ESS u performs according to specs u Able to monitor temperature stability to 0.01 C n Software u Major efforts gone into development of DCS prototype u Achievement more or less our goal u Still unresolved : communication problems with CAEN crates u Note : A major effort in terms of man power was needed. This should be a warning for other sub-detectors…..

G. Dissertori ETH Zürich ECAL - DCS 39 Other issues… Switch to ELMB analog DC supply (RH uses a separate 5VDC supply)