Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.

Slides:



Advertisements
Similar presentations
Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.
Advertisements

LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
LHCb Velo Construction Authorisation steps Tony Smith.
Back-End Bonding H&K 710 bonder Glue Pitch Adaptors Robot I&J2500 Glue Beetle Chip to Hybrid.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
WORK INSTRUCTIONS – Supervisor You deliver production orders to the Kitter. You motivate. If something is wrong. Find the culprit. Then motivate some more.
Setup reduction / quick changeover
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Electrical and thermal testing at Glasgow and Liverpool.
Vendor Analysis. 2 of : Vendor Analysis / DA0199-w1 Last updated: Vendor Analysis Information in Inventory Control Introducing numerous modifications.
Microscope Lab Objectives Identify the parts of dissecting and compound light microscope and give their functions. Coordinate their use to accurately.
Intermediate SFFMA Objectives: – Hrs received.
Silicon Preshower for the CMS: BARC Participation
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Quality control of raw materials In-process control
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
STAT Technician Roles and Responsibilities. STAT Technician Responsibilities STAT technician assists during cartfill process by delivering morning respiratory.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
CESO SEMINARS 2002 Insulation and Continuity Testing for Laparoscopic Instruments Presented by Stephen Moule CARSEN GROUP INC.
Frank Lehner U Zurich Proposal to use the Atlas SCT database for Run IIb  Why to switch now? u existing database (db) at UIC incomplete and unlikely to.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
UK ATLAS SCT Module Quality Assurance Joe Foster, Manchester University 04 Jan 2005 All results compiled in time for Christmas…
Siemens Professional Education SPE Berlin Siemens Technik Akademie JAN-08 SLIDE: 1 ASSEMBLY LINE GAUGING MODULE ASSEMBLY LINE - GAUGING MODULE LEVEL 1.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
Delivery Operations CONDUCTING A SUCCESSFUL PS FORM 3999.
Production Database Apollo Go, NCU Taiwan Preshower Silicon PRR July 5, 2001.
DENSO Supplier Labeling Policy
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
NORMALIZATION Handout - 4 DBMS. What is Normalization? The process of grouping data elements into tables in a way that simplifies retrieval, reduces data.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
VELO Replacement Girish Patel University of Liverpool.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
RECORDS MANAGEMENT Judith Read and Mary Lea Ginn Chapter 10 Geographic Records Management 1 © 2016 Cengage Learning ®. May not be scanned, copied or duplicated,
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
Excel Tutorial 8 Developing an Excel Application
ATLAS pixel module assembly flow
Ladder Assembly All tools and jigs produced Glue dispensing works
nSW Alignment Installation
Typical Receiving Procedures
Preproduction Status & Results
Assembler Design Options
Results from module testing
CMS Perugia Modules Production Review
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Hybrid & Module Electrical Testing
Distributor Want aka. Dis-WAnt
US Hybrid/Module/Rod Testing Model
US Module Testing Progress Report
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Setup for testing LHCb Inner Tracker Modules
US Module Testing Progress Report
Place your pizza receipt here Place your pizza receipt here
Presentation transcript:

Sensor Testing Phil Turner

LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput

LHCb PRR - P. Turner Reception Check contents Label Create traveller Create database entry Insert data from manufacturer Store

LHCb PRR - P. Turner Inspection Inspect strip-side under microscope Inspect reverse Update traveller and database

LHCb PRR - P. Turner Metrology Weigh Height measurement Contour measurement Analyse Update traveller and database

LHCb PRR - P. Turner Mounting Mount sensor in carrier Label Temporary storage Bond Temporary storage

LHCb PRR - P. Turner Electrical tests IV Current and capacitance for each strip Re-measurements CV IV Update traveller and database Evaluation by Physicist

LHCb PRR - P. Turner Changes since EDR Two-person handling and inspection Two sets of jigs Simplified traveller sheet: data in database Second IV scan

LHCb PRR - P. Turner Storage Remove bonds Return to storage box Store in cabinet

LHCb PRR - P. Turner Results Total number of sensors delivered Total number of used sensors Total number of available sensors Awaiting metrology Awaiting electrical tests Failed Unavailable Total R+P

LHCb PRR - P. Turner Throughput 1 sensor per 4 hour day (1h+7h+3h) 2 per 15 hour day (1h+7h+3h+1h+7h+3h) red indicates un-attended

LHCb PRR - P. Turner end

Pitch Adaptor Testing Phil Turner

LHCb PRR - P. Turner Contents Reception Preparation Electrical tests Storage Changes since EDR Results Throughput

LHCb PRR - P. Turner Reception Label Create database entry Remove CERN visual failures Visually inspect Store

LHCb PRR - P. Turner Preparation Trim tabs Trim raised sides, if necessary Examine Temporary storage

LHCb PRR - P. Turner Electrical tests Probe station scan Analyse Re-measure Update database Temporary storage

LHCb PRR - P. Turner Storage Store sets Update database Update database when attached to hybrid

LHCb PRR - P. Turner Changes since EDR “Just in time” storage Record length

LHCb PRR - P. Turner Results Latest batch160 CERN rejects 39 Passed 70 Failed 37 Not yet measured 14 Pass rate: 65% of those tested 24 good sets tested (target: 70 good sets)

LHCb PRR - P. Turner Throughput 1.5 hours per pitch adaptor

LHCb PRR - P. Turner end