Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)

Slides:



Advertisements
Similar presentations
1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
Advertisements

2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Update on Ongoing Tungsten Digital HCAL Beam Tests Erik van der Kraaij CERN LCD.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Report from CALICE Beam Test 2 nd DAQ taking period and Plan for 3 rd DAQ period S. Uozumi Jul ScECAL meeting.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, July 22 nd, 2011 Adil Khan.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Performance of Shower Maximum Detectors Saori Itoh (Shinshu Univ.) GLC calorimeter group (KEK,Kobe,Konan,Niigata,Shinshu,Tsukuba) Introduction Detector.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Brief report on May 09 running with ScECAL and AHCAL S. Uozumi (Kobe) Jun CALICE TB meeting.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
Beam test of Silicon-Tungsten Calorimeter Prototype
the CALICE test beam set-up and running experience
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Preparation for CERN test beam
CALICE News The 2007 beam tests have started!
The DHCAL: an overview José Repond Argonne National Laboratory
ScECAL+AHCAL+TCMT Combined Beam FNAL
Installation and Run Plan
E. Garutti - Main Meeting
Testbeam analysis on module #1
Michele Faucci Giannelli
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)

Thing accomplished on Sep 08 running We have collected enough data to evaluate fundamental performances of ScECAL. – Response uniformity of extruded scintillator strips – Energy resolution – Linearity – Performance change with tilt angle (only 10 degrees) Successful combined data taking with AHCAL & TCMT – Both AHCAL and TMCT are working perfectly without any fatal problems. First look of the  0 run seems to be successful. –  0 mass peak observed. LED gain monitoring system (almost) successful – Still have some problems which needs to be debugged, but performance is OK for the first test system of gain monitoring.

Problems happened on Sep 08 Air gap inside ScECAL can not be reduced. Drift chamber 3 has been broken. – After very frequent trip of positive HV on Sep-, leak current grows to large. Repair underway at FNAL, seems to be a problem of electronics? Constant term of energy resolution too large ? Linearity looks no good? LED system – Need to push re-init button on CMB slow control every time when we start the DAQ. – Pick-up noise observed on some channels which are located at specific position of frontend boards. – For some channels difficult to see pedestal-1pe peak separation in ahcGain run. A few (4-5) dead / noisy channels

Motivation for next data taking energy scan at more energy points - 1, 2, 3, 4, 6, 8, 10, 12, 15, 16, 20, 25, 30, 32 GeV - Both positive and negative beams available higher energy pion (up to 60 GeV) data taking Take more  0 data at more energy points Position dependence of resolution / linearity Tilt angle scan (20, 30 degrees) Run with revised system – DC3 back – LED system (not all the problems can be solved) – Temperature sensor Can take Adil into our group Anything more?

Things we can NOT do Recover dead / noisy channels Remove electronics problem with LED system Reduce CAL thickness

Possible Schedule Setup & LED commissioning … 7 days (without beam) commissioning with beam … 2 days MIP calibration … 4 days Energy scan with electrons … 6 days with pions … 4 days Position scan with electrons … 2 days  0 run … 3 days Tilt angle scan … 4 days Withdraw … 5 days (without beam) Total … 25 days with beam When ? Sometime in Apr or May ? May conflict with TILC09 (Apr 17-21th)… Need to contact Erik by the end of January 2009.

Shift / Man-power 2 persons x 2 shifts x 25 days = 100 psd. Mimimal requirement : – 4-5 (3-5 from ScECAL group) persons at FNAL – 2 persons on remote shift Need to set-up remote shift room in Shinshu ? Who can join from Japan / Korea / others ?

If we will NOT take another data… Need to withdraw equipments sometime in next year – 2 persons x 1 week – Help from DESY ?

Backups

‘08 Sep running Schedule Setup … Aug 17 th – Sep 3 rd (17 days) Detector commissioning … Sep 4 th – 8 th (5 days) MIP calibration … Sep 9 th – 13 th (4.5 days) Precise strip scan with MIP … Sep 13 th – 16 th (3 days) Energy scan with electrons … Sep 16 th – 20 th (4.5 days) with pions … Sep 21 th – 23 th (2.5 days)  0 run … Sep 23 th – 24 th (1.5 days) Tilt angle scan … Sep 25 th – 27 th (5 days) HCAL calibration … Sep 27 th – 29 th (3 days)

Collected datasets on Sep 08 Muon data for MIP calibration – Taken with 20x20 trigger – 2.1M events collected – At least 7k of good MIP events on each strip Precise strip scan with MIP – To evaluate strip response uniformity of improved scintillator strip Energy scan data with e - and  - – -32, -25, -16, -12, -6, -3, -1 GeV (-1 GeV is only for electron) – For electron runs, data collected both in central and uniform region. – 200 ~ 250k events collected at each energy, each position.  0 runs – Put iron target on beamline at 185 cm upstream from ECAL surface – Took data at -16, -25, -32 GeV with pion trigger, k events at each energy Tilt angle scan – Tilt detector for 10 degrees – Take electron & pion energy scan data