TOTEM Roman Pots MPP Meeting 19/06/2015 MPP Meeting 19/06/2015 - Sylvain Ravat1.

Slides:



Advertisements
Similar presentations
Issue 1 It can be argued that the complexity problem associated with the current IP control plane has arisen because of ever evolving network service requirements.
Advertisements

2N PRI Gateways 2N SIM Star.
Usage of the memoQ web service API by LSP – a case study
Status Report TOTEM collaboration meetings 24-MAY-2010
Feature requests for Case Manager By Spar Nord Bank A/S IBM Insight 2014 Spar Nord Bank A/S1.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Interprocess Communication. Process Concepts Last class.
SubVersioN – the new Central Service at DESY by Marian Gawron.
Hall C’s HMS PLC Controls by Steven Lassiter. What Constituents a PLC System PLC (processors) Programming. I/O modules. Field Device Signals (sometimes.
SIM SERVER Central SIM storage & management Full integration with DTT products Easy user defined SIM management rules Ability to change Time & IMEI Simultaneously.
Windows Internet Connection Sharing Dave Eitelbach Program Manager Networking And Communications Microsoft Corporation.
Pro Imager A complete image and workflow management solution for the professional lab.
6/1/2001 Supplementing Aleph Reports Using The Crystal Reports Web Component Server Presented by Bob Gerrity Head.
Intel ® Server Configurator Tool Training Guide. Intel® Server Configurator Tool Enhancements New Website look consistent with Intel style for ease of.
Industrial Control Engineering PXI software support and accelerator integration.
G.T.R. Data Inc. Welcome to our EDI Overview. G.T.R. Data Inc. EDI Demonstration This demonstration will take you on a guided tour of our software. After.
Chapter Oracle Server An Oracle Server consists of an Oracle database (stored data, control and log files.) The Server will support SQL to define.
Archiving Where did I put that mail?. Business criticity Importance to manage : –Authenticity –Integrity –Perennity –Compliance High TCO of mail.
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
Miscellaneous Excel Combining Excel and Access. – Importing, exporting and linking Parsing and manipulating data. 1.
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
Module 7: Fundamentals of Administering Windows Server 2008.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
Creating Multimedia Interaction with Windows Media Technologies 7.
Probabilistic networks basis criteria of quality assurance Anton Bykau.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
6 th Annual Focus Users’ Conference Manage Integrations Presented by: Mike Morris.
Object-Oriented Analysis & Design Subversion. Contents  Configuration management  The repository  Versioning  Tags  Branches  Subversion 2.
Lexium SD2 and Lexium SD3 Stepper Drives and Motors -Lexium SD2 - two-phase range up to 9.2 Nm -Lexium SD3 - three-phase range up to 19.7 Nm.
UA9 software overview M. Donzé, UA9 software overview UA9 Crystal Experiment Controls and Acquisition Software Overview M. Donzé 1.Devices controlled 2.Controls.
Wir schaffen Wissen – heute für morgen Gateway (Redux) PSI - GFA Controls IT Alain Bertrand Renata Krempaska, Hubert Lutz, Matteo Provenzano, Dirk Zimoch.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
A MOVEMENT CONTROL SYSTEM FOR ROMAN POTS AT THE LHC Ben Farnham, Sylvain Ravat, Federico Ravotti, Mario Deile, Patrick Fassnacht, Odd Oyvind Andreassen,
LINKS (Louisiana Immunization Network for Kids Statewide) REMINDER RECALL.
LHC Collimators Low Level Control Commissioning Status A Masi, LHC Collimators Low Level Control Commissioning Status LHC Collimators Low Level Control.
CE Operating Systems Lecture 13 Linux/Unix interprocess communication.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
Progress report Collaboration meeting 23-SEP-2009
Improvements of the ALFA and TOTEM Roman Pot Movement System in TS1 Mario Deile with input from P. Fassnacht, S. Jakobsen, J. Kaspar, S. Ravat for the.
EPICS Release 3.15 Bob Dalesio May 19, Features for 3.15 Support for large arrays - done for rsrv in 3.14 Channel access priorities - planned to.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Industrial Controls Engineering Department Proposals for an Improved CERN PXI Support First CERN PXI Users Group meeting - 19 th October H. Reymond.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Supervised By: Dr. Juergen Dingel Suchita Ganesan, Laith “Leo” Juwaidah, Nondini Das Madiha Kazmi, Mojtaba Bagherzadeh Model-Based Monitoring for PapyrusRT.
Strategy to achieve smooth upgrades during operations Vito Baggiolini BE/CO 1.
(1) Introduction to Continuous Integration Philip Johnson Collaborative Software Development Laboratory Information and Computer Sciences University of.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
60kW Thermosiphon control system
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
© Copyright 2014 TONE SOFTWARE CORPORATION. Confidential and Proprietary. All rights reserved. ® Operator Training – Release Performance Dashboard.
Access Network Devices Remotely— Even if the Network is Down— with Out-of-Band Management.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
4000 Imaje 4020 – Software Imaje 4020 – Content ■ Content of Chapter Software: 1. Flash Up 2. Netcenter 3. FTP 4. Active X 5. XCL commands 6. Exercise.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Industrial Control Engineering ADE Rapid Application Development Environment.
 Project Team: Suzana Vaserman David Fleish Moran Zafir Tzvika Stein  Academic adviser: Dr. Mayer Goldberg  Technical adviser: Mr. Guy Wiener.
UA9 software overview M. Donzé/ A. Masi, UA9 software overview UA9 Crystal Experiment Controls and Acquisition Software Overview M. Donze`/A. Masi 1.Devices.
Maninda Edirisooriya. Introduction Extension for Google Chrome. Privacy protection system for online chat. Encrypts chat text using 128 bit AES. Decrypts.
ATLAS-AFP interlock validation
Magnet Safety System for NA61/Shine
In-network computation
Data Management First we check system can handle bandwidths
Presentation transcript:

TOTEM Roman Pots MPP Meeting 19/06/2015 MPP Meeting 19/06/ Sylvain Ravat1

TOTEM Roman Pots Control System Structure DCS / TOTEM CCC UI / BE-CO FESA Gateway / EN-ICE PXI Rack Motor Control + Interlock Mngt Roman Pots / TOTEM DIM RPCS / PH-DT MPP Meeting 19/06/ Sylvain Ravat2

One PXI for : -LVDT Measurement and Interlock generation -RS485 communication with encoder -DIM Communication with FESA and DCS -Resolver not included To FESA Server and DCS through DIM TOTEM PXI Structure MPP Meeting 19/06/ Sylvain Ravat3 PXI for LVDT including : -LVDT Measurement and Interlock generation PXI for Motor Control including: -RS485 communication with encoder -Resolver Measurement -DIM Communication with FESA and DCS To FESA Server and DCS through DIM Data exchange between PXIs via NI Shared Variables : -Inner and Custom limits -LVDT Positions Before LS1 -> 24 pots After LS1 -> 32 pots + Resolver integration

MPP Meeting 19/06/ Sylvain Ravat4 Bug and solution t Bug during 08/06/2015 TOTEM RP Alignement Solution t  Use of NI Shared variables to exchange information between PXI controllers over the network  Misconfiguration of NI Shared Variable: -A FIFO buffer could be linked to this variable, -If this buffer is empty, reading the variable returns an empty value -At the Shared Variable creation, by default, the buffer option is activated -The Shared variable used to set the limits in the second PXI was configured with a buffer.  The consequence is that sometimes, the array which contained the custom limits handled by this Shared Variables, became empty. Therefore, it was impossible to modify the array and send new limits to the second PXI.  Removed buffer from the configuration of Shared Variable to avoid empty array and always keep the last set value,  Used Shared Variables only to exchange data between PXIs LVDT positions Custom and Inner Limits  Replaced Shared Variables by local variables to manipulate arrays in each PXIs

MPP Meeting 19/06/ Sylvain Ravat5Conclusion The SW fixes done on Thursday 11/6 have stabilized the system  We believe there is no intrinsic technology limitation  The PXI software will be saved and archived in TOTEM svn zone : \\svn.cern.ch\reps\totem\trunk\rp_pxi_software