Chino Basin Watermaster Large-Scale Storage and Recovery Program Master Plan Scope of Work July 23, 2003.

Slides:



Advertisements
Similar presentations
A Model for Common Services Process Approach Assessment Planning Decision-Making Management.
Advertisements

Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Status Report on Watermaster’s Water Quality Management Activities May 20, 2003.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
Monterey Peninsula Water Management District 1 Quarterly Update on EIR for Long-Term Water Supply Project October 29, 2002 at 5:30 PM MPWMD Conference.
Comprehensive Aquifer Planning Program Status Update Helen Harrington October 22, 2009.
Recommendations.  Use Inventory to serve as a valuable tool to support local, regional and statewide decision makers on issues involving water-dependant.
Regional Climate Change Water Supply Planning Tools for Central Puget Sound Austin Polebitski and Richard Palmer Department of Civil and Environmental.
Presented by Ralf Topper, CPG 30 th Colorado Water Workshop July 28, 2005.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
AWBA Quarterly Meeting June 20, Annual Report Requirements Accounting of AWBA transactions and proceedings for previous year All monies expended.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Chino Basin Improving Water Supply Reliability Presented by Ken Manning, CEO Chino Basin Watermaster.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
Project management Topic 4 Business Case.
March 21, 2006 Engrossed Second Substitute House Bill 2860 Columbia River Basin – Water Supply Keith Holliday Watershed Lead Washington State Dept. of.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
0 Modeling of Salt-Water Intrusion James L. Kennedy, Ph.D., P.G. Georgia Environmental Protection Division State Geologist.
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION July 21, 2005.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
Determination of New Recharge February 14, When will new stormwater recharge occur? Basins will be constructed in Watermaster fiscal 2002/03 and.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
1 California Water Plan Update 2009 Assumptions and Estimates Report.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
FY 2016/17 Proposed Budget Pool Meetings May 12, 2016 Joseph S. Joswiak, CFO 1.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
CHANNEL ISLANDS BEACH COMMUNITY SERVICES DISTRICT
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Task 6.3 – Evaluating business models currently in use by partners
Chromium 6 Regulation Corrective Action Plan October 6, 2015
10 year investment plan ERGEG approach and contribution
2017 Llano Estacado Regional Water Plan Planning Group Meeting
EMMS Infrastructure Cost/Risk Analysis
Water Resources Plan 2040 Update
CHINO BASIN WATERMASTER
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
City-wide LED Street Light Conversion Program
David Salazar, Chief Facilities Executive
San Benito County Water District Groundwater Sustainability Agency
Gulf of Honduras Task Group 1 Process
Technical Advisory Committee
Gulf of Honduras Task Group 1 Process
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management Wouter GEVAERTS Thomas TRACK Dietmar MÜLLER.
CHINO BASIN WATERMASTER
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
CBEWP Chino Basin Conjunctive Use Environmental
Chino Basin Water Bank Development
Chino Basin Watermaster
Resource Management and Climate Protection Committee Meeting:
Presentation transcript:

Chino Basin Watermaster Large-Scale Storage and Recovery Program Master Plan Scope of Work July 23, 2003

Task Overview 1) Develop assumptions/criteria 2) Develop alternatives 3) Estimate hydrogeologic feasibility 4) Refine alternatives 5) Determine “value” of storage recovery 6) Report/workshops and Other

Task 1 - Develop Planning Assumptions and Basin Operating Criteria Revise asset inventory Revise asset inventory Update local producer water supply plans and projections Update local producer water supply plans and projections Describe 500,000 acre-ft storage program Describe 500,000 acre-ft storage program Finalize Task 1 Memorandum Finalize Task 1 Memorandum

Task 2 - Develop Initial Storage and Recovery Operational and Facilities Alternatives Describe in-lieu vs. export Describe in-lieu vs. export Evaluate 4 Alt. incl. 4-Cities PipelineEvaluate 4 Alt. incl. 4-Cities Pipeline Evaluate CDA expansion Evaluate CDA expansion Replenishment obligationReplenishment obligation Review storage and recovery prospects Review storage and recovery prospects CLWACLWA OthersOthers Develop cost opinions for all alternatives Develop cost opinions for all alternatives Support development of storage & recovery agreements Support development of storage & recovery agreements

Task 3 - Estimate the Hydrogeologic Feasibility of the Planning Alternatives Review planning alternatives Review planning alternatives Run groundwater simulations Run groundwater simulations Determine impacts on:Determine impacts on: Groundwater levels Groundwater levels Hydraulic controls Hydraulic controls Increase safe yield Increase safe yield Plume migration Plume migration

Task 4 - Refine Alternatives Refine operations and facility descriptions Refine operations and facility descriptions Stake holder meetingsStake holder meetings Refine cost opinions Refine cost opinions Prepare facilities description and cost estimate Prepare facilities description and cost estimate

Task 5 - Determine "Value" of Chino Basin Storage-Recovery Determine “value” Determine “value” Producer-Specific Facilities Cost ApproachProducer-Specific Facilities Cost Approach Regional Facilities Cost ApproachRegional Facilities Cost Approach Avoided Cost ApproachAvoided Cost Approach Methodology to apportion benefits Methodology to apportion benefits Conduct workshop Conduct workshop

Task 6 - 8: Report Preparation and Workshops and Other Prepare draft report Prepare draft report Conduct first workshop Conduct first workshop Update draft report Update draft report Conduct second workshop Conduct second workshop 24 meetings 24 meetings Prepare final report Prepare final report