Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.

Slides:



Advertisements
Similar presentations
Muons going through MICE should –Have ISIS proton timing structure –Generate TOF signals –Satisfy ISIS and TOF trigger requirements MICE tracker DAQ will.
Advertisements

Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
1 Data Storage MICE DAQ Workshop 10 th February 2006 Malcolm Ellis & Paul Kyberd.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1M. Ellis - MICE Tracker Meeting - 12th February 2007 Readout Electronics & DAQ  Introduction  DAQ Spreadsheet u VLSB_DAQ Sheet u Initialisation u Bias.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Online – Data Storage and Processing
Hydrogen System Update
Tracker readout, DAQ, C&M and calibration
MICE Computing and Software
Tracker Specific Software
Preparation for Station Acceptance Test
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Hideyuki Sakamoto CM22, RAL 19/10/08
Presentation transcript:

Detector Summary Tracker

Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded over the past 2 years Firmware development for the AFE IIt boards will continue, however. Software – Code Development Unpacking Reconstruction/Track fitting Alan BrossMICE CM 29 February 14-18, 20112

2011 Cosmic Ray Test Plan What do we want to do? – Take more cosmic ray data with both trackers simultaneously Why? – Last time took data – 2009 – Never satisfactorily set up and timed in trigger – Never before run both trackers at the same time – Tracker expertise leaving – Do this test  make detectors secure until installation in Hall How long? – Until we: enable two-tracker readout & verify tracker quality at least Up to 3 months of CR data taking

Tracker Hardware 2 trackers 4 cryostats 16 AFE-IIt boards Readout electronics Readout code Trigger Fake ISIS RF signal

Tracker Hardware Status Minimized He background in Lab7 – Vent pumps outside – New He tank and regulator Vacuum pumps good New hoses on Cryo 2 & 4 to stop leaks All AFE boards cabled to VLSBs New trigger panels in Lab7 – Need to mount All readout electronics modules in hand

Tried to simplify the data format and the firmware Current status is: 100% done, but continuing to test for more subtle problems Paul Rubinov & Tom Fitzpatrick Caveat: we have one AFE board and one VLSB at Fermilab – Will test thoroughly at RAL next week Using Malcolm’s Excel based readout – Initially, then move to DATE Capable of ~150 events per ms long spill, but this depends on trigger latency if it is greater than about one half of ISIS RF bucket Readout Board - AFEIIt Status

Readout Readout functions for VLSBs implemented and integrated with MICE equipment list Communication with VME/access of registers tested New AFE and VLSB firmware will require some changes, primarily shift from cosmic to beam data and triggering Unpacking also depends on new firmware and data format – work underway Reconstruction Cosmic ray reconstruction tested and will be used in upcoming test Helical reconstruction working, but lacks efficiency (will not do 600/s) and has areas for improvement eg. scattering/energy loss in the Kalman noise Improvements to space point level recon, fast helical fit and improvement of Kalman also in progress

Cosmic Ray Test Plan Hardware ready to go shortly Tom, Paul arrive Friday/Monday Upgrade firmware Test readout with new version of spreadsheet Test with internal fixed freq trigger, internal variable freq trigger, external mimic of ISIS RF signal (variable freq) Test readout with modified DATE - David