IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Goals : 1- To conceive and build a self-supporting mechanical structure. 2- The concept can be extended to ILD and SiD 3- Keep cost as low as possible.
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
X Meeting of the Future Linear Colliders Spanish Network10-Feb-2014 Enrique Calvo Alamillo.
HGC4ILD - High Granularity Calorimeters for ILD WS 2-Feb-2015 LLR (Paris) 2-Feb-2015 Enrique Calvo Alamillo.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Tracking Integration Challenges Y. meeting 2013/9/25.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
ENSA -Mar-2015 Santander 3 -Mar-2015 Enrique Calvo Alamillo.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
The HCAL barrel absorber structure
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Hcal Geometry and Assembly Videoconference January 2008, 24th.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Kitakami Side AHCAL Assembly or anywhere in any detector.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
2016/9/30 Yasuhiro Infra/CFS mini-ws
Status of GASPARD mechanics
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Hcal Geometry and Assembly
Enrique Calvo Alamillo DAEGU
HCAL preliminary analysis and results
Experimental hall design in Japanese site
PANDA Yoke of the Magnet
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
cooling and supports of the forward endcap EMC
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Update of experimental hall in Japanese mountain site
LumiCal mechanical design, integration with LDC and laser alignment
SDHCAL Integration Moi j’aime bien SAFARI
EHN1 Neutrino Installation Plans
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Sub-Detector Assembly Area Summary of discussion at ALCW2015
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
SiD Engineering Status Report
Presentation transcript:

IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -

IPN Lyon ILD Integration Page 2 ILD integration Barrel integration Endcaps integration

IPN Lyon ILD Integration Page 3 Barrel integration : design Stainless steel1 wheel (8 mod.)5 wheels (Barrel) Weight (t): 88 t440 t Detectors W. (t): 36.8 t184 t Total Weight (t) : t 624 t Ext. Diameter6770 mm Int. Diameter 4116 mm Lenght 4700 mm Thickness wheel face = 10 mm Thickness absorbers= 15 mm Ext. Diameter : 6770 mm Int. Diameter :4116 mm Lenght : 940 mm x8

IPN Lyon ILD Integration Page 4 Barrel integration : Module building Building in Industry: 40 parts Technology adapted to larged skin & repeatable structure Welding method : Electron Beam Welding Tight continuous weld Accuracy and repeatability Low distortion Narrow weld and narrow heat affected zone Filler metal is not required Module done one by one 49 absorbers plates welded on 2 flanges Weight = 11 t

IPN Lyon ILD Integration Page 5 Barrel integration : scenario 1 Wheel Building in Industry / Campus : 8 modules => 5 wheels Building Method Step 1 : Modules assembly to wheel 8 modules in position on specific tool welding / screwing and rotation Step 2 : Wheel on specific tool Step 3 : Special convoy to Assembly Hall 180° Wheel weight = 88 t Road to

IPN Lyon ILD Integration Page 6 Wheel Building in Assembly Hall : 8 modules x 5 Barrel integration : scenario 2 Building Method Step 1 : Modules transport by normal truck to Assembly Hall Step 2 : Wheel structure transport Step 3 : Modules assembly on the wheel 8 modules in position on specific tool & screwing Module weight = 11 t Road to

IPN Lyon ILD Integration Page 7 Barrel integration : detectors integration Barrel Building & GRPC Detectors insertion 5 x Wheels built in assemby hall 368 GRPC insertion for each of the 5 wheels = 1840 GRPC Connection of gaz, HT, datas and cooling for each GRPC Services installation on each 8 spaces in zone A, ready to be connected for 5 wheels Zone A Common services Ready to be connected GRPC insertion with specific tool Damper transport structure for GRPC

IPN Lyon ILD Integration Page 8 Barrel insertion & services connecting Barrel integration : insertion Wheels put on the structure one by one Barrel with 5 linked wheels on same sub-structure as ECAL (similar to CMS) Rails inside the yoke Insertion « push-pull » Fixation inside the yoke on both sides Services installation along the yoke to patch pannels Barrel insertion Services issues to patch pannels CMS « enfourneur »

IPN Lyon ILD Integration Page 9 Endcap End caps integration : 2 endcaps One module Module Weight : 50 t Detectors weight : 22.5 t Total weight : 72.5 t One endcap made of 4 modules Endcap Weight : 200 t Detectors weight : 90 t Total weight : 290 t Material : stainless steel 2 endcaps 8 sides -> 16 sides Encap : 48 detectors EBW welded structure Idem barrel Modules built in Industry

IPN Lyon ILD Integration Page 10 Endcap Building in Assembly Hall : 4 modules x 2 Barrel integration : scenario Building Method Step 1 : Modules transport by normal truck to Assembly Hall Step 2 : Endcap structure transport Step 3 : Modules assembly on the structure 4 modules in position on specific tool & screwing Module weight = 50 t Road to

IPN Lyon ILD Integration Page 11 End caps Integration - Ring Ring built in Industry : Placed around the ECAL endcap 8 modules x Ring weight : 2.3 x 8 = 18.4 t 2xrings Ring ( ) + Barrel endcap (290 ) = t Screwed on endcap

IPN Lyon ILD Integration Page 12 End caps integration One module : 192 GRPC inserted in Assembly Hall detection planes -One detection plane consisted of 4 detectors planes GRPC plane : S = 8.5 m² P = Kg P/module = 22.5 t

IPN Lyon ILD Integration Page 13 End caps design - Ring Ring between barrel and endcap : GRPC insertion 3 GRPC planes by module 24 / Ring GRPC : S = 2.55 m²P = 140 Kg P/module = 980 Kg

IPN Lyon ILD Integration Page 14 End caps insertion Endcap + Ring : insertion on tool Support structure for One endcap made of 4 modules Total weight : 290 t Endcap + Ring Probably linked to Yoke Endcaps

IPN Lyon ILD Integration Page 15 Barrel Services integration Services Connections: Barrel Cooling for Dif : Blue / Red 2 loops by module Ø14 for principal Ø2 for distribution alternative Gaz For GRPC : green / pink 2 loops by module Ø14 for principal Ø4 for distribution alternative High Voltage : Brown Ø14 for supply Data acquisition : Beige Ø14 for collecting Issues : 8 zones 168 x

IPN Lyon ILD Integration Page 16 Services : Endcap+ring Endcaps Services integration Cooling for Dif : Blue / Red 2 loops by GRPC 14 for principal Ø2 for distribution alternative Gaz For GRPC : green / pink 2 loops by GRPC High Tension : Brown Ø14 for supply Data acquisition : Beige Ø14 for collecting Issues : 8 tubes outing 98 x 47

IPN Lyon ILD Integration Page 17 ILD Integration Resume. Scenarii Modules of Barrel & Endcaps made in industry Transport of modules to Assembly Hall 5 Barrels wheels & 2 Endcap-Ring mounting GRPC detectors insertion Barrel & Endcaps-Ring insertion with specific tools Surface needed for operations First the barrel & then Endcaps-Ring building and services, one after the other 1000 m² for assembly of modules, specific structures, Services & GRPC detectors Zone for barrel on structure storage : 200 m² Time schedule Wheel transport & assembly : 1 week by wheel -> 5 weeks for barrel GRPC insertion & test : 6 weeks by wheel -> 30 weeks for barrel Connecting wheels, test & insertion in Yoke : 4 weeks Total time for Barrel = 39 semaines Approximately same time for both Endcaps-Ring