RAINFALL DATA ENTRY - IMPORTANT POINTS DATA ENTRY - FIRST STEP *SUBSEQUENTLY -VALIDATION, PROCESSING, REPORTING AT SUB-DIVISIONAL OFFICES *CLOSER INTERACTION.

Slides:



Advertisements
Similar presentations
2017/3/25 Test Case Upgrade from “Test Case-Training Material v1.4.ppt” of Testing basics Authors: NganVK Version: 1.4 Last Update: Dec-2005.
Advertisements

Card Verification Support
Creating Tables Unit 9 - Databases.
DV Module 3 Benefits. Overview State Specific Module 3 Components Step Numbers Functions Documents Rules Definitions Comments.
CORRECTION/COMPLETION OF RAINFALL DATA PRIMARY & SECONDARY VALIDATION –FLAGGING : SUSPECT OR INCORRECT VALUES –MISSING : NON-OBSERVANCE OR LOSS OF DATA.
Copyright © 2008 Pearson Prentice Hall. All rights reserved Committed to Shaping the Next Generation of IT Experts. Exploring Microsoft Office Access.
SECONDARY VALIDATION OF WATER LEVEL DATA (1) PRIMARY VALIDATION: –BASED ON KNOWLEDGE OF INSTRUMENTATION AND METHODS OF MEASUREMENT WITH ASSOCIATED ERRORS.
PRIMARY VALIDATION - RAINFALL DATA DATA VALIDATION *FINAL VALUE STORED IN “HIS” IS BEST REPRESENTATION COMPREHENSIVE MANUAL VALIDATION *PROHIBITIVE IN.
Journal Vouchers H’s and I’s and J’s OH MY!. Journal Vouchers H’s and I’s and J’s OH MY! H type JV’s are used to... Reallocate transactions within an.
PRIMARY VALIDATION OF WATER LEVEL DATA OBSERVED DATA MAY BE SUBJECTED TO ERRORS *RANDOM, SYSTEMATIC AND SPURIOUS *AIM OF VALIDATION IS TO DETECT SYSTEMATIC.
Training Outline – Attendance Clerks
Spillman Sentryx 6.0.
SECONDARY VALIDATION - RAINFALL DATA PRIMARY VALIDATION ALREADY DONE *ON INDIVIDUAL STATION BASIS SECONDARY VALIDATION *IDENTIFY SUSPECT VALUES BY HAVING.
New Features in Cashbook 2012 ( 6.1 A) for Sage 300 ERP 2012.
Alarms and Events - Processing and Logging Project Mentors Suneel Kumar Venugopal Vanga.
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 9 Controlling Information Systems: Process Controls.
MEDICAL RECORDS MANAGEMENT IN EYE CARE SERVICES 6.International classification of Disease & Procedures and the method of Indexing data.
CEDARS Validations Review and address data quality errors.
Presented by: Mike Hamdan South Coast Air Quality Management District Diamond Bar, CA Presented at: The Tribal Air Monitoring Training, Pechanga Reservation,
McGraw-Hill/Irwin © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 9 Processing the Data.
BlueBayCT Quick Start Guide Introduction Dealing with Popup Alerts Using and Customising Templates Working with the Practice Reporting Tools Advanced.
Topics Covered: Data preparation Data preparation Data capturing Data capturing Data verification and validation Data verification and validation Data.
Sterling Chadee Director of Statistics. The processing of the data from the field enumeration began in July 2011 until September All data processors.
Chapter 8: Systems analysis and design
Ensure that the Field Day Call Sign is correct.
Welcome Registration Staff In-service. Information UAMS considered a black hole.
1 CMPT 275 Phase: Design. Janice Regan, Map of design phase DESIGN HIGH LEVEL DESIGN Modularization User Interface Module Interfaces Data Persistance.
E-Drop box is an Electronic Cheque Drop Box that can be install at Branch premises or any other location to collect cheques from the customers with complete.
Cindy Collins ETEC 665 Electronic Submissions Submitting Proposals Through Grants.Gov.
System Development Lifecycle Verification and Validation.
Import Errors (Entering Level 0) Import Errors: Module-specific errors. When importing demographic files, you get demographic-only import errors.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Chapter 10 Electronic Data Processing Systems.
Systems Life Cycle. Know the elements of the system that are created Understand the need for thorough testing Be able to describe the different tests.
Troubleshooting in MDS. Overview Order Entry Alerts / Holds Invoicing Holds Drop Ship Purchase Order Creation Alerts End of Day Process End of Day Error.
Formic software training for the SCOOP study Mikey Desai, Training Consultant, Formic Ltd Liz Lenaghan, SCOOP Study Manager, UEA.
Enhancing Forms with OLE Fields, Hyperlinks, and Subforms – Project 5.
Chapter 9 Controlling Information Systems: Application Controls.
CLIDATA ATACO Ltd. METEOHYDEX Introduction Primary archiving of the climatology data Primary archiving of the climatology data Replaced the Clicom.
Statistical Expertise for Sound Decision Making Quality Assurance for Census Data Processing Jean-Michel Durr 28/1/20111Fourth meeting of the TCG - Lubjana.
Copyright © 2010 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Starting Out with Programming Logic & Design Second Edition by Tony Gaddis.
By Phileo Don - Okhuofu. DATA COLLECTION  Data can be collected by the use of questionnaires or data collection forms.  These could be printed out and.
PROVISIONAL POPULATION REVIEW TOOL (For Charge Officers) Consistency check, Validation and Finalization of Provisional Population totals Census 2011.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing Data Processing Section B.
Data Collection. Data Capture This is the first stage involved in getting data into a computer Various input devices are used when getting data to the.
Copyright © 2010 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Starting Out with Programming Logic & Design Second Edition by Tony Gaddis.
Data Verification and Validation
Chapter 11 Data Validation. Question Should your program assume the data is correct, or should your program edit the data to ensure it is correct?
1 11 Exploring Microsoft Office Access 2007 Chapter 6 Data Protection.
REPORTS. WHY USE A REPORT  To present data / information from a query  Shows more than one record / strand of information  More presentable / professional.
Data Management Data Verification Data Validation.
Davisware GlobalEdge 2008 Payroll Main Menu Time Entry and Payroll Processing.
PestPac Software. Pay On Commission Commission can be paid on Production, Receipt, or Up-Front. Production: Commission will be paid when work is completed/an.
GLOSS Training Workshop Course Japan Meteorological Agency May 15-26, 2006 Sea Level Data Processing with SLPR2 1. Introduction.
UNIT 3 – MODULE 5: Data Input & Editing. INTRODUCTION Putting data into a computer (called data coding) is a fundamental process for virtually all GIS.
Input, Output and Processing.. What data needs to be input into the system? Identify the sources – i.e. where does the data come from? What is the volume.
2016 Annual Redrock Conference Record Connect Report Success 25 Years of Success Strategies for Your Campus The Ins and Outs to Preparing for a New Semester.
Receipt User Guide 1. INDEX Sl. No ProcessSlide no. 1Login procedure4-7 2Gate Inward Entry Process9-19 3Notification Summary for Bonding20 4Receipt23-35.
IGCSE 4 Cambridge Designing a database table Computer Science
Chapter Topics 15.1 Graphical User Interfaces
Unit 16 – Database Systems
Validation Bury College.
N3FJP Field Day Logger.
CREATING DISTRIBUTION IDS IN details Online
Chapter 7: Input Validation
MOBILE MONITORING SYSTEM
Module 8a - How to run Automatic RNC Correction
Presentation transcript:

RAINFALL DATA ENTRY - IMPORTANT POINTS DATA ENTRY - FIRST STEP *SUBSEQUENTLY -VALIDATION, PROCESSING, REPORTING AT SUB-DIVISIONAL OFFICES *CLOSER INTERACTION BETWEEN OFFICE & FIELD STAFF PRIMARY MODULE - SWDES *CUSTOMISED DATA ENTRY SCREENS & VALIDATION EASIER ORGANISATION & MANAGEMENT *CURRENT & HISTORICAL DATA BEFORE STARTING DATA ENTRY *RECEIPT & INSPECTION AFTER COMPLETION *DATA SENT TO DDPC - IMPORT IN SECONDARY MODULE OHS - 1

RAINFALL DATA ENTRY & SWDES DEDICATED SOFTWARE *MS ACCESS DATA BASE STRUCTURE *GUI ENVIRONMENT DATA TYPES *PRIMARILY TIME-ORIENTED *ALSO STATIC AND SEMI-STATIC DATA TYPES AUTOMATIC DATE AND TIME LABELS DATA ENTRY CHECKING *REJECTING CLEARLY SPURIOUS DATA (INVALID DATA) *FLAGGING SUSPECT DATA SUITABLE FORMAT FOR VARIOUS TIME INTERVALS OHS - 2

MANUAL INSPECTION OF FIELD RECORDS PROPER RECORDING ?? –STATION NAME, CODE, YEAR & MONTH NO. OF DAYS IN MONTH PROPER ?? DAILY DATA –MONTHLY TOTALS DONE ?? AUTOGRAPHIC DATA - –HOURLY TABULATIONS & DAILY TOTALS DONE ?? RECORD CLEARLY WRITTEN ?? –DIGIT & DECIMAL POINTS MISSING DATA –ACCUMULATIONS OVER PERIODS REPORTED ?? OHS - 3

OHS - 4

OHS - 5

OHS - 6

OHS - 7

OHS - 8

OHS - 9

OHS - 10

OHS - 11

OHS - 12

EXERCISES EXPLORE FEATURES OF DAILY RAINFALL FORM –ENTER ONE YEAR OF RAINFALL DATA & PERFORM NECESSARY DATA ENTRY CHECKS EXPLORE FEATURES OF TWICE DAILY & HOURLY RAINFALL FORMS