Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.

Slides:



Advertisements
Similar presentations
Jennifer Wolfe NAEA CONVENTION Baltimore, MD 2010.
Advertisements

CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
How to Make a Hot Air Balloon
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
M. R. Evanger a M. Rajabali a, R. E. Turner a, B. Luther a, T. Baumann c, Y. Lu b, M. Thoennessen b,c, E. Tryggestad c a Concordia College, Moorhead, MN.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
LCD Muon/PID Meeting Friday Oct 29, SUBSCRIBE FIRSTNAME LASTNAME There are "underscores" between: Fermilab, LC.
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
Status of CLAS12 PCAL project
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
Levers & Fluids Rig Step-by-step assembly instructions (c) 2012 Mechanical Kits Ltd.
Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Foldable Tie Book Instructions. Materials Needed 2 pieces of scrap paper Glue stick Paper Hole Punch Tool 1 piece of yarn cut to one arm’s length.
Build A Motor You must follow the directions step-by-step!
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Baby-MIND Modules & Services
T2K Upgrade First look at TPC constraints (WAGASCI)
Catapult.
New idea for the target detector: SuperFGD
Lantern plans by Master Dafydd and Master Terafan
NOVA DESK RANGE.
Hand-cranked Windmill Assembly Instructions
Workshop Rotating Platform
Workshop Rotating Platform
Step-by-step assembly instructions
Workshop Rotating Platform
IFR detector mechanics
Step-by-step assembly instructions
STEP 1: ASSEMBLE ANGLE PLATES
Tiny Book Workshop!.
Hot-Air Balloons.
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Workshop Rotating Platform
Step-by-step assembly instructions
Step-by-step assembly instructions
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Step-by-Step Assembly Instructions – Cube Version
ACD transparency - gaps between tiles - holes in tile to attach them
NPS mechanical design 11/13/2018 Jlab meeting
Step-by-step assembly instructions
XY Scanner Mount.
NPS mechanical design 01/31/2019 Jlab meeting
Step-by-step assembly instructions
Bunker Wall Design Wall ESS
BUILDING AN AUTONOMOUS QUADCOPTER.
Four Jaw Collimator.
Making a 2-crate Plant Light Box, PLB
Presentation transcript:

Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield in front One detector plane consists of four sections each covering 96x96 cm 2 The active element of each section is a stack of 0.5x3 cm 2 scintillator bars, split in half, viewing the target WLS fibers run through holes in the bars and transmit light to H channel PMT The task is to prototype mechanically one section of the CDET the prototype dimensions to be close to a central section of the CDET Instead of using scintillators will use plastic bars cut from 3/16” acrylic sheet; no holes in the bars Front plate will be holding the assembly, made of ¼” aluminum The bars divided in five stacks vertically and strapped to the front plate The neighboring stacks from different section should touch each other The thickness of the detector plane should not be much bigger than the thickness of the active part, 30mm

Connection between sections An idea how to connect two sections without gaps between stacks Two sections shown, each with five vertical stacks, split in half Each stack is strapped to the front plate at different positions to make transition between the sections The straps run through holes in the front plate All approximate dimensions in inches

PMT to WLS connection Key element in the design, defines the thickness of one CDET section, light sealing, etc. PMT is glued in a plastic PMT holder PMT holder is firmly attached with screws to the front plate while the PMT goes through a hole sticking outside few mm The WLS (not shown) are glued in the “cookie” inside holes The cookie is attached to the front plate with springs Aluminum plate (3mm) covers the back side of the detector Dowel pins in the front plate center the positions of the PMT holder and the cookie All dimensions in mm PMT holding plate PMT holder WLS cookie PMT Side view Bottom view Front plate

PMT to WLS connection pieces