Dick Loveless Upgrade report 12 Oct 20121 EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.

Slides:



Advertisements
Similar presentations
Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
Advertisements

Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Walls crates cables gas chambers electronics CERN adb.
CSC ME1/1 Upgrade - DCFEB Status S. Durkin, B. Bylsma The Ohio State University FNAL ME1/1 Review 7/20/
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
CSC Endcap Muon Port Card Status Mikhail Matveev Rice University.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
PPIB and ODMB Status Report Rice University April 19, 2013.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
CMS EMU CSC Upgrade Digital CFEB B. Bylsma, CMS Upgrade Workshop, FNAL, Nov. 8, Ben Bylsma The Ohio State University.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
CLAS12 Drift Chamber Prototyping
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Stan Durkin CMS Upgrade Week 1 A Digital Pipelined Cathode Front End Board (DCFEB) Stan Durkin The Ohio State University.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
OTMB Development and Upgrade Plan for LS2
DCFEB Production for LS2
CSC Hardware Upgrade Status
University of Wisconsin
The Ohio State University
Update on CSC Endcap Muon Port Card
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
EMU Slice Test Run Plan a working document.
CSC Organization in 2013 Jay Hauser To be updated at
10/month is the present production rate 2 FTE + sporadic contributions
CSC - HV, LV - Present Status and Future Plans Toward Phase 2
Pierluigi Paolucci - I.N.F.N. Naples
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
ME1/1 Electronics Upgrade
SLHC CSC Electronics Upgrade Spearheaded by OSU CMS Group
Plans for the 2004 CSC Beam Test
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012

Dick Loveless Upgrade report 12 Oct ME4/2 Chambers Chamber factory is operating reliably Chamber production rate ~1/week Completed 19 chambers (out of 67 needed) Chambers 211 – 218 in 2 month HV test Chambers 219 and 220 in assembly area

Dick Loveless Upgrade report 12 Oct Final Assembly & Testing Final Assembly Add on-chamber electronics and cables Assembly going well - ~1-2 days per chamber Testing All CSCs go through a 2-month HV test (up to 4KV – nominal HV is 3.6 KV) On-chamber electronics tested different tests including trigger, gas gain, cosmic ray data Completed 10 chambers – rate limitation is production, not testing

Dick Loveless Upgrade report 12 Oct Chamber production chart Showing production rates for the 1 st endcap (31 CSCs)

Dick Loveless Upgrade report 12 Oct ME1/1 Electronics I ME1/1 Test Stand in B904 7 prototype DCFEBs have been installed & powered Prototype LVDB board working fine Cooling operational Currents high - - roughly 50 amps per CSC On-board temperatures ~30 C (reasonable) Currently reading DCFEBs using copper skewclear cables and old DMB (can only read 5 boards) Reading new TMB boards using optical fibers

Dick Loveless Upgrade report 12 Oct ME1/1 Electronics II DCFEB boards Most firmware operational - - currently working on the firmware for ODMB to enable data transfer to ODMB FF_EMU ASIC Currently does not work Decision to focus effort on backup solution via Cu ODMB Prototype board exists at CERN, needs firmware TMB Received new firmware enabling full functionality

Dick Loveless Upgrade report 12 Oct ME1/1 Low Voltage Design of LV system finalized ME1/1 prototype test working well Layout of cables & power supplies Junction box prototype under construction 8 Maraton power supplies ordered