IFPS Science Steering Team IFPS Methodology Workshop March 2004

Slides:



Advertisements
Similar presentations
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Advertisements

ISST Review and Update Science and Technology Committee Meeting 3 February 2004.
ISST Review and Update WR SOO/DOH Conference Call 19 February 2004 (Material extracted from a Briefing of the Science and Technology Committee on February.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
“Where America’s Climate, Weather and Ocean Services Begin” NCEP CONDUIT UPDATE Brent A Gordon NCEP Central Operations January 31, 2006.
1 May 8, 2006 Briefing to Northwest Congressional Delegation Staff.
Great Lakes Regional Research Information Network Lake Michigan Coordination Team Brian K. Miller – Illinois-Indiana Sea Grant Jennifer Fackler – Illinois-Indiana.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
New Local Climate Outlook Products from the NWS Jay Breidenbach NOAA/National Weather Service.
New Local Climate Outlook Products from the NWS Andrea Bair NOAA/NWS Western Region Headquarters Climate Services Program Manager.
FORECASTING EASTERN US WINTER STORMS Are We Getting Better and Why? Jeff S. Waldstreicher NOAA/NWS Eastern Region Scientific Services Division – Bohemia,
National Blend of Global Models An Overview
Exploitation of Ensemble Output (and other operationally cool stuff) at NCEP HPC Peter C. Manousos NCEP HPC Science & Operations Officer
NWSChat (Instant Messaging) Instant Messaging system for the NWS and Partners NWSChat Carlos Diaz June 2009.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
US NITRD LSN-MAGIC Coordinating Team – Organization and Goals Richard Carlson NGNS Program Manager, Research Division, Office of Advanced Scientific Computing.
NWS Digital Services 1 Digital Services Update and Forecast Collaboration March 16, 2004 Shannon White Training Division.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
WR Societal Impacts Meteorologist Darone K. Jones.
3rd WG meeting, Brussels Proposed Plan for Governance of the Washington Group Prepared by: Jennifer Madans, Barbara Altman, Beth Rasch (USA); Renée Langlois.
NOAA’s National Weather Service National Digital Forecast Database: Status Update LeRoy Spayd Chief, Meteorological Services Division Unidata Policy Committee.
Pablo Santos WFO Miami, FL Mark DeMaria NOAA/NESDIS David Sharp WFO Melbourne, FL rd IHC St Petersburg, FL PS/DS “HURRICANE CONDITIONS EXPECTED.”
Woody Roberts Tom LeFebvre Kevin Manross Paul Schultz Evan Polster Xiangbao Jing ESRL/Global Systems Division Application of RUA/RTMA to AWIPS and the.
VERIFICATION OF NDFD GRIDDED FORECASTS IN THE WESTERN UNITED STATES John Horel 1, David Myrick 1, Bradley Colman 2, Mark Jackson 3 1 NOAA Cooperative Institute.
CRUISE LINER STUDY – PHASE II ECONOMIC BENEFITS NATIONALLY AND REGIONALLY FIRST STEERING COMMITTEE MEETING OF CRUISE LINER TOURISM 24 MARCH, 2009.
Stationary Sources Joint Forum Update Eric Massey Arizona Department of Environmental Quality Lee Alter and Patrick Cummins Western Governors’ Association.
Analysis of Record Andy Devanas Jeff Medlin Charlie Paxton Pablo Santos Dave Sharp Irv Watson Pat Welsh Suggestions and Concerns from the Florida Science.
SUSTAINING THE ANALYSIS Module 2 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
GLFE Status Meeting April 11-12, Presentation topics Deployment status Data quality control Data distribution NCEP meeting AirDat display work Icing.
OUTLINE Current state of Ensemble MOS
1 Agenda Topic: National Blend Presented By: Kathryn Gilbert (NWS/NCEP) Team Leads: Dave Myrick, David Ruth (NWS/OSTI/MDL), Dave Novak (NCEP/WPC), Jeff.
Christopher Juckins Meteorologist/Programmer Technical Support Branch, NHC Christopher Juckins Meteorologist/Programmer Technical Support Branch, NHC GFE.
Rebecca Cosgrove NCEP/NCO/Production Management Branch March 26, 2015
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
RFC Verification Workshop Happy Ending?! Julie Demargne, Mary Mullusky and Kevin Werner RFC Verification Workshop, August
Science and Technology Infusion Plan For National Digital Forecast Database Science and Technology Infusion Plan For National Digital Forecast Database.
APPLICATION OF NUMERICAL MODELS IN THE FORECAST PROCESS - FROM NATIONAL CENTERS TO THE LOCAL WFO David W. Reynolds National Weather Service WFO San Francisco.
Executive Director Update November 14, HLSC Executive Director met one-on-one with leaders of member agencies and compiled a list of their needs.
NFUSE Conference Call 4/11/07 How Good Does a Forecast Really Need To Be? David Myrick Western Region Headquarters Scientific Services Division.
Project Kickoff Meeting May 29, Transforming the Way Government Builds Solutions.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
NCEP Suite Review December 2013 Alaska Region Rick Thoman ESSD Climate Science and Services Manager.
Armstrong’s QEP Quality Enhancement Plan. QEP Steering Committee Nancy Remler, Chair – John Kraft, Andy Clark, Marilyn O’Mallon, Bob LeFavi, Mario Incorvaia,
NWS Digital Services 1 CB Operations Committee Lynn Maximuk DSPO Operations Team Eastern Region HPC Day 4-7 Grid Proposal Review, Findings and Recommendations.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
CFI GROUP WORLDWIDE ANN ARBOR ATLANTA BUENOS AIRES KUALA LUMPUR LONDON MADRID MELBOURNE MILAN PARIS PORTO ALEGRE SEOUL SHANGHAI STOCKHOLM National Weather.
IFPS Science Steering Team (ISST) and other related activities Andy Patrick NOAA/National Weather Service Corpus Christi, TX IFPS Methodology Workshop.
IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee -- S&T Committee VTC 28 May 2003.
Riding the IFPS/GFE into the Future of Forecasting Lynn Maximuk MIC WFO Pleasant Hill, MO.
1 NWS Digital Services American Meteorological Society Annual Partners Meeting San Diego, CA January 13, 2005 LeRoy Spayd National Weather Service Office.
GFE in RFCs Tom LeFebvre ESRL/Global Systems Division.
Info-Tech Research Group1 Info-Tech Research Group, Inc. is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
CBP Biennial Strategy Review System
RECOGNIZING educator EXCELLENCE
Project Organization Chart Roles & Responsibilities Matrix
Budget Community of Practice (BCOP)
CBP Biennial Strategy Review System
NPRS December 7, 2011.
Budget Community of Practice (BCOP)
IATI External Evaluation 2015
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
General Discussion Conclusions:
North Asia Regional Aviation
Presentation transcript:

IFPS Science Steering Team IFPS Methodology Workshop March

Goals Introduce the ISST (origin and membership) Outline recent activities and accomplishments List current activities Provide a roadmap of ISST activities

WHAT IS THE ISST ? IFPS Science Steering Committee Comprised of members from each NWS region –Composed of field experts chartered to identify and prioritize ongoing IFPS science issues Reports to OST (Jack Hayes) –A formal conduit between field personnel and NWSH First assembled early

Team Members Pacific Region: Bill Ward (PRHQ) Alaska Region: Eric Stevens (WFO Fairbanks) Western Region: Brad Colman (WFO Seattle - team leader) and Mark Jackson (WFO Salt Lake City) Southern Region: Andy Patrick (WFO Corpus Christi) Central Region: Dan Baumgardt (WFO LaCrosse) Eastern Region: Steve Keighton (WFO Blacksburg) NCEP: Peter Manousos (HPC – backup team leader) NWSHQ: Kevin Schrab (OST - facilitator)

WHY ISST ? Origin and Background

WR SOO/DOH WORKSHOP May 2002 –Concerns raised on the design and implementation of IFPS WR SOO Writing Team formed –Represented all WR SOOs/DOHs –Tasked with authoring a WR SOO/DOH IFPS White Paper White Paper Gained WR RD and MIC support –Eventual endorsement and support of all NWS Regions

WR Writing Team Recognized… IFPS/GFE is aggressive and ambitious Revamps much of field operations Provides many challenges known and unknown Potentially delivers an unprecedented spectrum of forecasting services

HOWEVER …. Degraded model data available in GFE –Both horizontal and vertical Forecasters spending unnecessary amount of time compensating for this deficiency –Prevents full benefit of EMC models –Robs time from serving other mission critical responsibilities No verification system to assess skill

Digital forecasting is the right thing to do –Strive to remain on current schedule, but remain realistic –React quickly to meet needs and eliminate deficiencies Success of IFPS requires exploring, developing, and implementing new methods and technologies Must ensure efficient use of human capital throughout all services WR SOO/DOH IFPS White Paper Assumptions

WR SOO/DOH IFPS White Paper Core Recommendations Develop a National real-time, gridded verification system Provide full-resolution NCEP model grids Objectively produce bias-corrected model grids for WFO use Implement methods to objectively downscale forecast grids Incorporate climatology grids into the GFE process Deliver short and medium-range ensemble grids Modify the GFE software to ingest real-time data Optimize ways to tap forecaster expertise

Follow-On Efforts Addressing Initial White Paper Recommendations WR SOO/DOH Workshop of 2003 –White paper was focus of workshop –Focus groups tasked to identify requirements and possible approaches for each of the WP recommendations, then present to participants –Groups composed of SOOs/DOHs and subject matter experts MDL, FSL, universities, and NCAR represented OS&T and program leaders attended Members of the newly-formed IFPS Science Steering Team attended –First draft distributed for review/comment to all NWS SOOs/DOHs –Final report on workshop results completed by writing team and distributed to all SOOs/DOHs, Regions, and NWSH on 22 Aug ’03

Connection to ISST ISST used May 2003 WR SOO/DOH workshop for its initial assembly and starting point Initial task was to address white paper raised issues –ISST used May 2003 WR SOO/DOH workshop for its initial in situ assembly

ISST Accomplishments and Activities Identified an opportunity to fill "transmission gaps" on the SBN and developed a proposal now nearly implemented –Eta surface and BL fields Working with MDL on their efforts to develop COOP MOS (now in GFE) and gridded MOS –Number of MOS sites increased by a factor of 3 Provided scientific critique and feedback into the directive process and NVIWT verification plan design Investigated and prioritized a spectrum of downscaling possibilities and reported to S&T Committee Conceived, developed, and championed the Eta extension

ISST Current Issues Downscaling –8-day Eta-12 Extension over CONUS using GFS boundary conditions NVIWT Verification Plan Analysis of Record

Downscaling – Purpose Extend the information content of “coarse” model prediction fields to finer scales –Reflect the influence of detailed local effects such as terrain and/or land-surface Initialization within GFE, especially at day 8 Analysis of Record needed to verify NDFD

8-day Eta Extension Background: –Designed to bring quick relief to forecasters by giving physically consistent and seamless option for high resolution medium range grids –Has received broad support from Regions Status and timeline: –Test grids available to setup optimal baseline SMARTINIT –March: 30-day testing and evaluation period Forecasters at a subset of WFOs to assess impact on operations Better evaluation of internal drift issues (limited set of fields available via web page) Test Regional WAN distribution method HPC will perform model diagnostics

8-day Eta Extension (continued) Mid April: convergence of Eta runs complete and Eta extension running operationally –GRIB1 Regional distribution continues Late May: DVB-S efforts free up SBN bandwidth June: OB3.2 upgrade to AWIPS configuration June: Eta extension operational via SBN using GRIB2

ISST Current Issues Verification and Analysis of Record –Reviewing Verification Plan –Initial discussion on how to get ball rolling

3-hourly Temperature MAE for 24 hr, 00Z

Maximum Temperature MAE for 24 hr, 12Z VERSUS RUC : 20 km grid Early results from MDL’s gridded verification

Updated Roadmap New prioritized list of action topics: –Analysis of Record –Digital Services forecast process –Climatology –Downscaling (long-term solutions) –Review of (preliminary review to OCWWS by late March) –Uncertainty and probabilistic information Short term actions (next 2-3 months) –Verification (prioritize tasks in NVIWT Verification Plan) –Input to (declaring elements official)

Activities with Ongoing Monitoring Grid change management GFE enhancements SBN data GFS bottleneck on mainframe TCM (Tropical Cyclone Message) Gridded MOS

ISST and You Contact any ISST member with your IFPS ideas and concerns ISST Forum Teleconference –Lines available for all Region –ISST discusses current activities and S&T committee briefing highlights –Provides a forum for your feedback

Closing Comments ISST is a formally recognized and active team addressing science related issues with regards to IFPS/GFE –A formal conduit between field personnel and NWSH ISST has already championed significant positive changes related to IFPS/GFE (at the WFO level) The team is championed by OST Jack Hayes –Tasked ISST to think freely –Potentially puts items on a fast track You have access to your ISST representative and therefore a method to elevate IFPS/GFE concerns