SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.

Slides:



Advertisements
Similar presentations
Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Vertex Detector and Tracker Mechanics and Materials Bill Cooper (Fermilab) (Layer 1) VXD.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Vertex Detector Cooling Bill Cooper Fermilab (Layer 5) (Layer 1) VXD.
Vertex Detector Cable Considerations Bill Cooper Fermilab VXD.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Simulations for EXL Hossein Moeini, for the EXL Collaboration KVI- University of Groningen.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Mechanics: Status and Plans Bill Cooper (Fermilab) (Layer 1) VXD.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
CLIC Vertex Detector Mechanics Bill Cooper Fermilab (Layer 5) (Layer 1) VXD.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Aug/16/05 Su DongSiD Vertexing: Snowmass 05 SiD trk+vtx1 SiD VXD Geometry Update Su Dong SLAC.
VXD Mechanical R&D at the University of Washington H. Lubatti, C. Daly, W. Kuykendall LCRD in conjunction with Fermilab, SLAC.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
DOE Rev of Run IIb Sep 24-26, Run IIb Silicon Mechanical Design  Run IIa and IIb geometries  Sensor dimensions, numbers, and drawings  Hybrids,
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Andrei Nomerotski, University of Oxford ILC VD Workshop, Menaggio 22 April 2008 SiD Vertex Detector.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
E. Da Riva/M. Gomez Marzoa1 WG4 Meeting - 27th June 2012 Air Cooling by means of carbon fiber structure Enrico DA RIVA (EN-CV-PJ) Manuel GOMEZ MARZOA (EN-CV-PJ)
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
6/19/06 Su DongSiD Advisory: VXD DOD Summary II1 VXD DOD Summary (II) Sensors & Other system Issues.
VLCW06, July 23, 2006 H.Weerts Vancouver, CA 1 Where YOU can contribute in SiD. H.Weerts Argonne National Lab for SiD concept design study.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Straw man layout for ATLAS ID for SLHC
Rosier Ph. – IPNO – Detector Dpt. – 30/10/2012GASPARD Padova meeting 1/13 Mechanical engineering for GASPARD Unité mixte de recherche CNRS-IN2P3 Université.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
University of Washington, Seattle
Layout of Detectors for CLIC
? ENDCAP: Mechanics IFIC-Valencia.
SiD Solenoid Status and Plans
C.Clerc ILD session, ALCPG /03/2010
Vertex Detector Mechanical R&D Design Questions and Issues
Adapting the via last Design
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
Vertex Detector Overview Prototypes R&D Plans Summary.
SiD Tracker Concepts M. Breidenbach
Setup for testing LHCb Inner Tracker Modules
Limited Streamer Tube Project Summary
Presentation transcript:

SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab

22 May 2007VXD Mechanics Meeting 2 Present SiD Design The present SiD vertex detector geometry was developed about a year ago and is shown below.

22 May 2007VXD Mechanics Meeting 3 Present SiD Design The five barrel layers are each approximately 125 mm long. Four disks per end close the barrel region. Three additional disks per end contribute to tracking in the forward / backward direction. All elements are supported from double-walled, outer carbon fiber laminate half-cylinders. –The half-cylinders are supported from the beam pipe and hold it straight. –Outer radius of the half-cylinders ~ 185 mm.

22 May 2007VXD Mechanics Meeting 4 SiD Design Studies and Issues Detailed beam pipe shape –Integration with the geometry of forward calorimeters –Integration with supports for forward calorimeters and beam line elements Carbon fiber laminate CTE relative to silicon –Thermal distortions between assembly temperature and operating temperature –Measurements of CTE via strain gage techniques (University of Washington) and via thermal bowing of “bi-metallic” carbon fiber laminate – silicon strips (Fermilab) Assembly of layer 1 model at SiDet –0.1 mm thick “dummy” silicon –Zeiss rotary table, Brown & Sharpe CMM –Stages from DZero layer 0 assembly –Vacuum “puck” provided by University of Washington

22 May 2007VXD Mechanics Meeting 5 Half-Cylinder Prototyping Set-up to check fixturing with 0.32 mm sensors 0.1 mm thick silicon dummy sensors are on hand. Mandrel is identical to the one used to fabricate CF structure. Stacked stages are from DZero Layer 0. Vacuum pick-up is in the foreground. We have paused to develop fixtures more compatible with sensors carrying cabling / readout.

22 May 2007VXD Mechanics Meeting 6 SiD Design Studies and Issues New barrel end-view geometry under development Sensor counts were increased in L3, L4, L5 to obtain multiples of 4 and fully identical barrel halves. Possible separation line (under study)

22 May 2007VXD Mechanics Meeting 7 Geometric Efficiency A- to B-layer gaps determine geometric efficiency. Full geometric efficiency is obtained for tracks below and to the right of the curve in the right plot (spreadsheet calculation). Tangency to the beam pipe surface is accidental.

22 May 2007VXD Mechanics Meeting 8 Geometric Efficiency

22 May 2007VXD Mechanics Meeting 9 Geometric Efficiency We could obtain geometric efficiency from the spreadsheet and tune sensor locations, sizes, and A- to B-layer gaps to optimize it. That hasn’t been done yet. Similar, but different, geometric efficiency issues arise with a “spiral” geometry.