ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.

Slides:



Advertisements
Similar presentations
Inspected in port Shanghai from 26th to 28th Sept by NCL
Advertisements

M760 TOWER CRANES ERECTION
Installation. Indoor Unit Installation Typical Installation.
Terminal Gear (9/2014). Lesson Objectives State applicable reference materials related to terminal gear on board an Uninspected Towing Vessel (UTV) Determine.
Hydraulics hy·drau·lics [h drólliks ] noun study of fluids:  the study of water or other fluids at rest or in motion, especially with respect to engineering.
Marine Auxiliary Machinery
Marine Auxiliary Machinery Chapter 9 Lesson 6 Deck Machinery Cargo Access By Professor Zhao Zai Li
Adelija Čulić-Viskota
Essential reading: SPINČIĆ, A., An English Textbook For Marine Engineers I., Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička vježbenica.
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
LESSON TWO BEFORE YOU GET UNDERWAY. Key Topics Vessel’s capacity Vessel’s capacity Float plans Float plans Fueling a vessel Fueling a vessel Trailering.
APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.
Proof Coil Chain A welded link chain. Chain size is designated by the diameter of the steel used in making the links (e.g.. 3/16"-3/4"). Made from low.
General Arrangement Plan
General Arrangement Plan
ALOKRAJ. V - NA07B004. General  All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
Crane Operations Objective
Marine Auxiliary Machinery Chapter 9 Lesson 5 Deck Machinery Cargo Handling By Professor Zhao Zai Li
Cargo Gear Survey … …………………......……………... ILO 32 ………………….…..……………………………. ILO ………………………………... TNS 15 Regulations.
Aerial Apparatus Operator Types and Construction of Aerial Apparatus.
Module 2: General Working Conditions 2.3 Ladders / Stairways Susan Harwood Grant Number SH F-23.
Anchor Handling Tug Supply Vessel
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
General Arrangement Plan
EMERGENCY TOWING PROCEDURE
Dewatering Equipment.
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
Installation. Indoor Unit Installation Typical Installation.
MANAGEMENT CULTURE ISM 2.0 YOU ARE THE BOSSES, ACT LIKE THAT!! SAFETY CULTURE HAS TO BE IMPROVED ZERO TOLERANCE ON SAFETY VIOLATIONS ONBOARD MANAGEMENT.
MARITIME SCHOOL ASSESMENT PROGRAM REVIEW
DL 105 Marine Survival Davits BT Elliott Davits A system to move a lifeboat from the stowed position, outboard for launching and recovery Davits.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Lesson Five Bulkheads and Pillars.
ABL-8 AbleAnchoring Instructors: George Crowl. Course Outline (1)  a. Describe the various kinds of anchor rode and the advantages and disadvantages.
SHIPS, SHIP ROUTINE AND CONSTRACTION. 1. The pillar shape that gives the greatest strength for the least weight is the _______. A. circular type pillar.
Holding Down and Chocking The engine must be securely fixed to the ship. For this the engine is mounted on resin or cast iron chocks and bolted to the.
STBD. BOAT DECK MONITOR HEAVY CORROSION FOUND INSIDE ELECTRICAL MOTORS RENDERING THE MONITOR NON-OPERATIONAL.
1 Pillars and Girders. 2 Pillars also referred to as: –posts –stanchions –columns.
Fwd. Anchor Windlass / Capstan
What Makes Up a Ship?.
Work Boat. Spec’s ●Overall length 17’ ●Max Beam 8’ ●Draft is 26” ●Weight: 2000 lbs ●35 mph top speed ●Off set center console ●#5086 Marine Aluminum Alloy.
Module 5: Operations & Hot Work 5.3 Hot Work, Permits, and Inspections Susan Harwood Grant Number SH F-23.
{ NAUTICAL TERMINOLOGY Titanic Unit for Seventh Grade.
November 2013 Institution update
Deck Equipment AGOR 27. Deck Crane: TK Deck aft Portable Crane: TK Deck fwd Per Design Specification (J-1) Cranes Shall be capable of:
 Is the room or platform from which the ship can be commanded. When a ship is underway the bridge is manned by an OWO (officer of the watch) aided usually.
Goddard Sailing Association Hunter 27 Cruiser Qualification Course 1.
UH-60 Load Out on C-5 Aircraft
Planned Maintenance 1. locations of maintenance EngineDeckCateringNavigation Life safety appliances.
Warehouse Safety Is This You????.
Module 3 – Naval Skills Unit 3 - Basic Seamanship
Nautical terms AND MORE….
Hire Different Varieties of Lifting Gear in UK
Auxiliary Engines Pumps Winches Steering engine Boilers Generators
ANCHORING & MOORING An anchor is used to attach a ship to the seabed at a specific point. The primary function of an anchor is to hold the ship againts.
UNIT-I SLOTTING MACHINES
Instructors: George Crowl
Hydraulics hy·drau·lics [h drólliks ] noun study of fluids:  the study of water or other fluids at rest or in motion, especially with respect to engineering.
Mooring operation at Strömmen
Mooring operation at Strömmen
RESCUE BOAT DAVIT CME Models: D & D
Tug Boat 101 Coastal and Blue Water
Proof Coil Chain Rope and Chain-Chains, Lashing Straps, and Accessories Image: ChainProofCoil.jpg Height: 46.2 Width: 120 A welded link chain. Chain.
Arch205 building construction vertical elevators
Mooring operation at Strömmen
LIFT,ESCALATOR AND MOVING WALKS
SEAMANSHIP
Presentation transcript:

ALOKRAJ. V - NA07B004

General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational & owner’s requirement.

Anchors & Mooring Equipment  An anchor is a heavy object, often made out of metal, that is used to attach a ship to the sea bottom and prevent the ship from moving.  Two bow anchors (each of 1920 kg) with high holding force together with shackle and stud link chain cable are to be installed in accordance with the rules.One spare anchor to be provided and stored on board

BOW ANCHOR

AJAI KURIAN MATHEW - NA07B002 ALOKRAJ. V - NA07B004

General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational & owner’s requirement.

Anchors & Mooring Equipment  An anchor is a heavy object, often made out of metal, that is used to attach a ship to the sea bottom and prevent the ship from moving.  Two bow anchors (each of 1920 kg) with high holding force together with shackle and stud link chain cable are to be installed in accordance with the rules.One spare anchor to be provided and stored on board

BOW ANCHOR

Anchor Windlass-cum- Mooring winch.  An anchor windlass is a machine that restrains and manipulates the anchor chain and/or rope on a boat, allowing the anchor to be raised and lowered.  Electro-hydraulic Drive.  Each windlass cum winch with two cable lifter & two warping drum and one central drum to be provided.  Capacity of cable lifter : 9 12 meter/min or as per classification requirement which ever is higher.

Capstans  Two electro-hydraulic capstans.  An apparatus used for hoisting weights, consisting of a vertical spool-shaped cylinder that is rotated manually or by machine and around which a cable is wound.  Pulling force of 5 15m/min.

Tugger Winch.  A small drum winch designed to assist the crew in manipulating the heavy pieces of towing gear such as chain bridles, towing plates and large towing wires used in anchor-handling or ship- handling work  Commonly fitted in offshore vessels at the cargo deck area behind the superstructure

HYDRAULIC TUGGER WINCH

Capacity 10 tonnes at 15m/min. The winch is to be complete with one wire drum and one inboard warping head, complete with 250mx22mm dia wire.

Smit bracket Fitting welded on deck to enable towing connections to be made quickly and securely. The vessel shall be equipped with a 150 tonnes SWL ‘Smit bracket’ on the fox’le deck.

Lashing Lugs & Dummy Capstans 20 numbers of 5T SWL lugs are to be arranged on main deck / Cargo Rail. Sufficient (8 Nos.) numbers of dummy capstans each are to be fitted on the supports of the cargo rails / main deck suitably at the port & stbd. LUG

Bollard Around 12 bollards of 12” NB on board vessel. Mooring pipes or chocks for the above bollards are to be fitted to the bulwark as required.

Davit Used to lower things over an edge of a long drop off such as lowering a maintenance trapeze down a building or launching a lifeboat over the side of a ship.

One davit along with an electric operated winch of 1 Ton SWL is to be provided on the stbd side on the forecastle deck mounted close to or on the bulwark.

National Colours "Staff" to be installed at mast for national colours. Escape Hatches Watertight hatches, with counter weights in: Engine room Aft Thruster Compartment. Construction Equipment Room Bow thruster room.

Rungs or vertical ladder are to be fitted for each escape hatch and area to be illuminated by emergency light.