Water Node: RRA Year 1: REVIEW. Rainfall – ET plot for drylands.

Slides:



Advertisements
Similar presentations
ClimDev-Africa Program & African Climate Policy Center (ACPC)
Advertisements

P REDICTING EFFECTS ON W ATER P RODUCTIVITY AND THE W ATER B ALANCE DECISION SUPPORT TOOLS AND MODELS FOR:
Delivering SCIENCE AND TECHNOLOGY Through the National Science and Technology Consortium.
1 RESOURCE CENTRE NETWORK (RCN)DEVELOPMENT PROJECT AN INITIATIVE TO PROMOTE INFORMATION AND KNOWLEDGE MANAGEMENT WITHIN THE WASH SECTOR.
Presentation on RRA CP project at Bankura By PRADAN (7-8 May, 2013, New Delhi)
AGRICULTURE AND AGRI-FOOD CANADA PRESENTATION TO : The Standing Senate Committee on Agriculture and Forestry February 24, Regina.
APDAI A Pilot initiative on Climate resilience. Objective Enhancing drought adaptation capacity of affected communities and reducing their vulnerability.
1 Sonali Mohapatra The World Bank Land and Poverty Conference March 24, 2015 Land Literacy to Enhance Rural Women’s Secure Land Rights: Reflections from.
Family Resource Center Association January 2015 Quarterly Meeting.
IFAD Reform towards a better development effectiveness How can we all do better? Mohamed Béavogui Director, West and Central Africa January 2009.
Comprehensive M&E Systems
ESPA Comprehensive Aquifer Management Plan Presentation to the Governor’s Water Summit April 17, 2007 Idaho Water Resource Board Jonathan Bartsch and Diane.
USGS Realignment, Science Planning, and FY 2012 Budget Matthew C. Larsen Associate Director Climate and Land Use Change U.S. Department of the Interior.
A business case to reduce rural poverty through targeted investments in water in sub-Saharan Africa WWF5 Session How can food market measures boost.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Integrated thematic assessments: outlook on water, data and.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
America’s Water Upmanu Lall water.columbia.edu.
1 UNISDR Secretariat Asia and Pacific IAP meeting 25 March Learning from the HFA progress review.
Water Scarce Ecosystems A proposal for a UNCCD Policy Framework May
In the Name of God, Most Gracious, Most Merciful.
Revitalising Rainfed Agriculture National Network – An Overview Malkangiri, May, 2012.
A Watershed Management Project Supported by the World Bank (2014 – 2020)
Region III Activities to Implement National Vision to Improve Water Quality Monitoring National Water Quality Monitoring Council August 20, 2003.
1 Adopting and Implementing a Shared Core Practice Framework A Briefing/Discussion Objectives: Provide a brief overview and context for: Practice Models.
Inter-Agency Contingency Planning: Concepts & Process
Development partnership in the education sector Mokoro Seminar 24 January 2014.
Project Overview, Objectives, Components and Targeted Outcomes
Mali Work Packages. Crop Fields Gardens Livestock People Trees Farm 1 Farm 2 Farm 3 Fallow Pasture/forest Market Water sources Policy Landscape/Watershed.
1 Towards a Strategic and Integrated Management of Plant Genetic Resources for Food Security and Sustainable Development Dr. Kakoli Ghosh, Agricultural.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
WMO Blue Peace - Water Security in the Middle East: Strategic Management of Hydrological and Meteorological Data and Information Product Generation Al-Hamndou.
E NVIRONMENTAL STATISTICS STATISTICS DIVISION Regional Strategy for the implementation of SEEA: key features and reflections for the Caribbean Regional.
Sierra Leone NAPA Implementation: Incrementality of Adaptation Presented by N. Telahigue CLIMTRAIN 2 nd Workshop IFAD, Rome 20 Nov 2008.
WLE Strategy Results Framework. Challenges that we have been tasked with CGIAR process to develop coherent IDOs Developing a coherent a logical frame.
Village Microplanning : Vehicle for Decentralized District Planning Lessons from Maharashtra Presented To The National Advisory-cum-Review Committee on.
Summary of Recommendations on Data Availability, Access and Use by Leisa Perch MACC PDF-B Technical Coordinator, Organization of American States.
Legal Aspects Related to Brownfield Regenerations Prof. Maros Finka, M.arch., Ph.D. „This project has been funded with support from the European Commission.
Secretariat : Progress & Achievements. Contents 1.HR at the Secretariat 2.Support to CPs 3.Support to thematic nodes 4.Networking, developing institutional.
Research Group – ResRA RRA Network Review Workshop - 9 May 2013.
School Improvement Partnership Programme: Summary of interim findings March 2014.
6th December, 2008 Convergence in Agriculture Development.
TAMP RWANDA PDF-B ACTIVITIES, FINDINGS AND AREAS OF ACTION.
W ATER IN RRA. Hydrogeological diversity in India The Western Ghats The Himalaya The Gangetic Plains.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Integrated Catchment Management & Capacity Building for Improving Livelihoods in Afghanistan Feedback on Stakeholders’ training Organized by ICARDA & LNRMI.
Interreg IIIB Trans-national cooperation: Budget comparison : 440 million EURO 420 m EURO (Interreg IIC prog.) + 20 m EURO (Pilot Actions)
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
Integrated Drought Risk Management Towards proactive drought management approaches February 2016, Climate Services for improved Water Resources Management.
CPIE Cluster Coordinator Training CPIE Cluster Coordinator Training 2010 Global Child Protection Framework and Standards.
People that Deliver Improving health outcomes by promoting sustainable workforce excellence in health supply chain management A multi-stakeholder, cross-program.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Ocean Carbon and Biogeochemistry Scoping Workshop on Terrestrial and Coastal Carbon Fluxes and Exchanges in the Gulf of Mexico May 6-8, 2008 St. Petersburg,
April 4, 2011 Princesa VanBuren Hansen Environmental Quality Board.
February 2, PM ET. Since the Summit… WE LISTENED…. Here’s what’s happening….. Curriculum Working Group is hard at work …… Why we are having these.
1 STRENGTHENING EXTENSION & ADVISORYSERVICE DELIVERY TOWARDS MEETING THE CHALLENGES OF THE 21 ST CENTURY The Critical Factors – The Kenya Experience BY.
12 th Meeting of the GBIF Participant Nodes Committee 6-7 October 2013, Berlin, Germany Towards a generic work programme for a Node Olaf Bánki Senior Programme.
Breakout Group Presentations – Day 4 Land Use Dialogue in the Ihemi Cluster, Southern Tanzania 31 October – 4 November Iringa, Tanzania.
Pacific Islands Training Institute on Climate and Extreme Events
Introduction to the New Extensionist
Legal Aspects Related to Brownfield Regeneration
Europe’s Environment Assessment of Assessments EE-AoA 2011
Irish Forum for Global Health Conference 2012 Closing Session
The Resource Mobilisation Project (ResMob) Resource mobilisation for effective implementation of the updated biodiversity strategy in Namibia Fast-track.
NSDS Roll-out: How Can PARIS21 Help?
SRH & HIV Linkages Agenda
INDICATORS AND INDEXES OF ADAPTATION PROJECT WATER RESOURCES 21Ago2017
WORKSHOP “Emerging environmental pollutants: key issues and challenges” Stresa, Italy June 2006.
MODULE 11: Creating a TSMO Program Plan
Global Meeting of the DS-SLM Project
Presentation transcript:

Water Node: RRA Year 1: REVIEW

Rainfall – ET plot for drylands

Groundwater exploitation: long-term desaturation of aquifers…

Overview of project Objectives Document – practices and gaps Significance of supply and demand side measures wrt rainfed productivity Strategise protective irrigation across diverse settings – drought buffering Improving access for all – SM + PI – collectives Research – data, analysis and synthesis (documentation) Advocacy – water, agriculture and rural development Location and resources Locations: mainly in areas (but not limited to) where CPs are on Geographies: Mainly drylands; diverse geology; one arid location Time: 3 years (present contract for one year) Resources: EUR HR: staff + student intern

Moisture management Protective irrigation

Moisture management/water balance in root zone

Rationale for water management under RRA Current water crisis is mired in the race to the pumphouse – for irrigated crops. The importance of water in RFA is not even recognised as a challenge. Moisture management and critical ‘protective’ irrigation are important to improving RFA. These two aspects emerge as priorities in the use of water as a common pool resource – THE BASIS FOR WATER MANAGEMENT PILOTS IN RRA EFFORTS…

Principle and operation Rainfall use efficiency Soil moisture management Protective irrigation (for all) Water management in RFAs as water for protection versus water for exploitation Water management in RFAs as water for protection versus water for exploitation ACWADAM, Pune

Progress – activities (year 1) Design of work and integrating RRA work with ACWADAM’s core work on hydrogeology and groundwater management Understanding the macro-picture through a situation analysis in a few locations Instrumentation and data Kharif planning – in at least three locations

Progress - results Water: controls – establishing arguments regarding soils, aquifers and water sources Data collection, including data on weather parameters Synthesis of data into a GIS frame Diversity in controls – geology, soil, water inputs, degree of water use Inequitous water access even on local scales Scales – watersheds, aquifers, land- parcels

Soil moisture variability in adjoining villages tapping one watershed and one aquifer…

Improving soil moisture and prioritizing areas for protective irrigation

Risks & assumptions Data collection Interface with CPs and other nodes Sufficiency and capacities of available Human Resources Steady but clearly evolving Good progress in about 4 CPs, need to pick up in the others Some limitation due to stretched HR but filling gaps with available resources possible

Shorter term…first year+ Basic parameters Completed/ongoing activities Reconnaissance visits to all the CP sites completed, with emphasis on understanding argo-hydro-geological setting Hydrogeological understanding in terms of the access to irrigation and soil-moisture status plus some understanding between soil – cropping pattern –water utilization understood in case of 3-4 sites Developing protocols for polling of water resources/grouping water – users to facilitate protective irrigation in upcoming kharif – under process Materials and models being compiled to conduct training and capacity building sessions specifically on water in RFA Characterising agro-eco-hydro elements of core CP area Situation analysis wrt to some CPs where implementing the interventions regarding protective irrigation are possible Developing action plan to facilitate protective irrigation for the maximum coverage of area which area more prone to droughts

Institutional arrangement and support systems Inputs Key results (achieved/expected) Integration of inputs by water node and kharif planning – 2-3 locations Key inputs to analysis of groundwater and weather- related data, including installation of weather stations in 4 CP locations Support in co-ordination of meetings, skypes and in interface with other nodes Strong interface in data collections, field support and in development of the framework for baselines, including interface with ResRA Project Organisation Network (Secretariat) Other nodes/CPs

Analysis and reflections - 1 Strengthening the argument of water as protection in RFA Layering at a certain scale achieved; convergence easier on some counts

Jawadhu hills – topography & watershed drainage

Rainfall Analysis

Drainage & Groundwater Analysis

Is groundwater only about mainstream irrigation??

Analysis and reflections - 2 Given the complex, but compelling nature of the collaborative framework of RRA, things are moving, albeit slower than expected. Key takeaway: development of a specialised pool of HR must be taken up for RRA on a priority basis.

Way forward Water node Proposed activities to continue, into 2 nd year with strong interface of research and application component (including data synthesis) Rebudgeting for second year, using balance of budget from 1 st year HR, including interns, will be mobilised to cover more locations – possibly all the 9-10 locations by the end of year 2 Network Need a plan for conducting comprehensive capacity building – cutting across thematic nodes and CPs and including a research component

Advanced Center for Water Resources Development and Management Website: Advanced Center for Water Resources Development and Management Website: