ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov-11 2008 ScECAL meeting.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan 1.Introduction 2.Recent.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
The MPPC Study for the GLD Calorimeter Readout Introduction Measurement of basic characteristics –Gain, Noise Rate, Cross-talk Measurement of uniformity.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Report from CALICE Beam Test 2 nd DAQ taking period and Plan for 3 rd DAQ period S. Uozumi Jul ScECAL meeting.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Combined Longitudinal Weight Extraction and Intercalibration S.Paganis ( Wisconsin ) with K.Loureiro ( Wisconsin ), T.Carli ( CERN ) and input from F.Djama(Marseille),
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
CALICE ScECAL software development S. Uozumi Sep-3 rd 2010 Japan-Korea joint workshop.
ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, July 22 nd, 2011 Adil Khan.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
STAR Collaboration meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC analysis update Just to remember … What we have done.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Brief report on May 09 running with ScECAL and AHCAL S. Uozumi (Kobe) Jun CALICE TB meeting.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
Introduction of my work AYAKO HIEI (AYA) Hiroshima Univ 2008/5/30 me.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
Preparation for CERN test beam
Tracking System at CERN 06 and 07 test beams
CMS Preshower: Startup procedures: Reconstruction & calibration
CMS ECAL Calibration and Test Beam Results
ScECAL+AHCAL+TCMT Combined Beam FNAL
Commissioning of the ALICE-PHOS trigger
Michele Faucci Giannelli
J. Rutherfoord & P. Schacht 17 May 2004
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting

Beam Test in Sep MTBF Objective : Test feasibility of Scintillator-ECAL + Analog HCAL with various types of beams in wide energy range. – Energy resolution, Linearity for electrons and pions. – Position and angular scan. –  0 reconstruction ability of the Scitillator-ECAL – MPPC gain monitoring system with LED. Beam running during Sep 3 rd – 30 th at MT6.

Collected datasets Muon data for MIP calibration – 2.1M events collected with 20x20 trigger – At least 7k of good MIP events on each strip Precise strip scan with MIP – To evaluate strip response uniformity of improved scintillator strip Energy scan data with e - and  - – -32, -25, -16, -12, -6, -3, -1 GeV (-1 GeV is only for electron) – For electron runs, data collected both in central and uniform region. – 200 ~ 250k events collected at each energy, each position.  0 runs – Put iron target on beamline at 185 cm upstream from ECAL surface – Took data at -16, -25, -32 GeV with pion trigger, k events at each energy Tilt angle scan (will start tomorrow) – Tilt detector for 10, Take electron & pion energy scan data Muon data taking for HCAL – With 100x100 trigger 120 GeV proton data

Strip response non-uniformity Drop-off of the gain at far side ~ 12 %. Much improved from DESY BT (was ~50% with extruded strips.) More precise analysis will be done With DC tracking information. MPPC Scintillator strip Position along the strip (cm) Strip response (ADC counts) K. Kotera

Linearity / Energy resolution Center region :  stoch ~ 13.0 %  const ~ 2.7% Uniform region :  stoch ~ 10.7 %  const ~ 3.8 % Saturation of calorimeter response observed. Presumably due to MPPC saturation and shower leak. Constant term is not small, reason not yet known. Y. Sudo / T. Ikuno

 0 runs Ability of  0 reconstruction from 2  is useful to improve jet energy resolution. Generate  0 by putting iron target in between DC3 and 4, inject -16 GeV pion beam into the target. Then find 2 electromagnetic clusters on ScECAL, reconstruct invariant mass. We already see something in 280k events!  0 ->2  ? Y. Sudo

MPPC Gain monitoring For ~70% of channels, we observed nice pedestal-1pe peak separation. For some of other channels, width of pedestal is a little too wide. For some of others, there is a noise observed possibly from TCALIB signal on frontend board. T. Sakuma

Analysis : short-term goal Prepare official reconstruction processors First working version is ready, some points still needs to be revised. Maintain simulation with Mokka This should be an official ScECAL detector model in CALICE Preliminary results by Dec 08 ~ Jan 09 for master theses of students. Detailed analysis toward publication will be continued in parallel.

Possibility to have the next beam period? If we can have the another beam time in next year, we can : – Do energy scan at more energy points – Perform measurements with higher energy pions – Collect more statistics with  0 run – Collect data to evaluate position dependence of calorimeter response or energy resolution. – run with drift chamber 3 back – Implement LED system from the beginning – Improve temperature monitoring system (large jitter is observed this time) ~4 experts for 4 weeks will be sufficient to take care of the ScECAL. Budget problem – have to wait until Apr 2008 to get necessary budget Beam time : ~ 3 weeks Shift requirements : 82 (at FNAL) + 42 (remote) person x day – ScECAL group member can cover 2/3 of them. – Need to have remote shift room also in Japan. Anyway we still need extensive discussion in CALICE based on the data we have collected in this month.

Getting started with analysis Analysis is performed with CALICE reconstruction software (Marlin + calice reco libraries). A version 0 of ScECAL official reconstruction code is prepared on an analysis machine in Kobe (bsm001.kobe.jp.hep.net). First of all get an account on that machine. Web page for analysis software information : Run summary and instruction of analysis software can be found here. (some parts are still being done sometime soon) CALICE e-log : Password is the all same with CALICE e-log (contact me if you do not know it). Contact me if you need individual instruction to use analysis software.

Structure of the official analysis path 1.ConditionsProcessor … access database, fetch run conditions (trigger, stage pos, temperature…) 2.TriggerProcessor … Prepare trigger selection 3.ScECALMappingProcessor … interpret mapping from electronics-oriented to detector-oriented 4.IntegratedScECALCalibrationProcessor … Perform pedestal subtraction, MIP calibration, gain and electronics inter-calibration, and MPPC saturation correction (not yet implemented). 5.User analysis module example : CaliceVerySimpleExampleProcessor Marlin